IRM4725/102/0/2025
Tutorial Letter 102/0/2025
ICT Project Management
IRM4725
Year Module
Department of Information Systems
IMPORTANT INFORMATION
Please register on myUnisa, activate your myLife e-mail account and
make sure that you have regular access to the myUnisa module
website, IRM4725-25-Y, as well as your group website.
Note: This is a fully online module. It is, therefore, available only on myUnisa.
BARCODE
CONTENTS
Page
1
INTRODUCTION ............................................................................................................................ 2
2
Assignment Details ...................................................................................................................... 2
1
INTRODUCTION
Dear Student
This tutorial letter contains Assignment 1
2
Assignment Details
This assignment is based on Specific Outcome 1, which focuses on Chapters 1 – 4.
•
Specific outcome 1:
Initiate and evaluate a proposed Information Technology project based on appropriate
scientific enquiry. An evaluation includes defining steps to initiate a project, define the scope,
purpose and context, and to utilize cost benefit feasibility analysis techniques.
Question 1
1.1. Sometimes the success of a project depends on the leadership of the project manager.
Identify several of the qualities of a good project manager.
(6)
1.2. Discuss the PMI Code of Ethics and Professional Conduct.
(4)
Question 2
2.1. Top management, sometimes called senior management is a person or group of people who
direct and control an organization from its highest level. Give a discussion of why the top
management commitment is crucial for project managers.
(12)
2.2. Describe the process of initiating a project and the issues involved.
(12)
2.3. Discuss the inputs that can aid the development of a project charter.
(10)
2
IRM4725/102/0/2025
Question 3
According to the Scrum Alliance, Scrum is the leading agile development method for completing
projects with a complex, innovative scope of work. Compare and contrast the Scrum approach to
project management with conventional plan-based approaches. Your comparison should be
based on the effectiveness of each approach for planning the allocation of people to projects,
maintaining team cohesion and managing changes in project team membership.
(14)
Question 4
In reference to this article “El Khatib, M., Alhosani, A., Alhosani, I., Al Matrooshi, O. and Salami,
M., 2022. Simulation in project and program management: utilization, challenges and
opportunities. American Journal of Industrial and Business Management, 12(4), pp.731-749.”
https://www.scirp.org/pdf/ajibm_2022042814431163.pdf
Identify and discuss all the possible IT project management challenges that are found in this
article.
(12)
Total marks (70)
©