CSS NC II Tasks PART 1: 1. Assemble / Disassemble PC 2. Creating Bootable USB flash drive (Windows Server or Windows 7/8) 3. Installing Operating System (Windows) 4. Installation of Device Drivers 5. Installation of application (Office, Antivirus, Web browser) PART 2: 1. Creating of Network Cables (straight-thru) 2. Terminating Patch Panel and I/O (modular rj-45 jack) 3. P2P setup 4. Router Configuration PART 3: 1. Domain Controller & DNS server 2. DHCP Server 3. File Server 4. Printer Server (printer sharing) 5. Remote Desktop PART 4: 1. Backup/Restore (System Image, Restore Point) 2. Troubleshooting / Repair from Part 1 up to Part 3