TRION-201-WDS92-PX-PID-01053 2 3 4 5 6 7 8 9 10 11 12 13 14 15 101230-MBF-12360 BC SUCTION SCRUBBER CHECK VALVE LEAKAGE 2"J3" 250 PSV SET @ 12366 97.8 BARG A0 3 A 01 SIZE: 1244 MM I.D. x 3148 MM T/T DESIGN: 145 BARG / FV AT -28.9 °C / 100 °C CAPACITY: 85600 SM³/HR GAS 3/4"D2ZOS-SC 01 430-MV-12358 P 6"x3" D0 0 6"A2RF-SC 01 430-MV-12359 A SLOPE 1:100 LO 01 6"-101430-VH-14157-A03 01088 3188 TO DRY / LT HP FLARE HEADER 01 4"x2" 6"-101230-PV-11125-F00-PP 1/2"D2ZOS 250-MV-12356 NO POCKETS B 4"D2RF 250-MV-12357 01054 LO B0 3 300 # RF 250 E 230 S 10"-101250-PV-11111-D00 1225 230 PST 12363A 230 230 S SDV-1 10"F2J 230-MV-12368 F P 230 230 PST 12363B FT 12361 SC 12361 L 230 TT 12364 230 TE 12364 230 AXIAL FLOW CHECK VALVE SP 80003A RTD 01 PP 10"F5JP 230-FNV-12360 N 2"F2J 230-MV-12364 NOTE 10 DETAIL A 3/4"F2J 01 230-MV-12361 3/4"BF 230 3/4"G2ZOS 230-MV-12372 NOTE 2 PT 12364 TST 12361 230 TE 12356 230 TE 12361 2" LPD HH 230 230 S LL 2" N5 2" BF N1 RTD NOTE 11 RS 3" RS N9 230 2" FC MAG LG 12362 RO 12362 10" NOTE 9 LO TRIM: 2"-101230-VT-11323-F00 TRIM 2: 2"-101230-VT-11499-F02 01 H 230 PY 13009B IP LAHH - 12362 900 MM LAH - 12361 750 MM NLL 600 MM LAL - 12361 450 MM LALL - 12362 300 MM 01 230 10"x8" GWR FSD PI 12361 HH LL GAP CONTROL 230 P MAG LG 12361 230 230 SDV-1 2"F9J 230-MV-12378 2" 2"F2J 230-MV-12380 N3 2" 230 S LIC 12361 H L F P LY 12361 IP G 230 SDV 12363 N7B 2" LO 230 LV 12361 2"-101230-PL-11135-F00 RS 3/4"F2J 230-MV-12381 3/4"BF FC 2" 1" FC 2"x1" 3/4"F2J FSD 230-MV-12382 2"x1" FSD 01 3/4"BF 2"F2J 230-MV-12373 N4 2" *LEVELS REF. BOTTOM TANGENT LINE OF VESSEL E 230 H 2" BF 01 3/4"F2J 230-MV-12386 2"F5J 230-FNV-12375 2"-101230-PL-11127-F00 NOTE 14 RS 2"F9J 230-MV-12383 3/4"BF F00 A00 10"x8" FO 8" 230 S 230 2" BF 2"F2J 230-MV-12385 2"F4J 230-MV-12384 CSC + I PV 13009 B LT 12361 24" MW LEVEL SETPOINTS P 230 PST 12361 2"F9J 230-MV-12379 NOTE 9 230 01054 2" 2"F9J 2" 230-MV-12366 LO 1255 TO BOOSTER COMPRESSOR N7A 2"F9J 230-MV-12377 DETAIL A 230 230 101230-MBF-12360 01046 FROM PIC-13009 ON TEG CONTACTOR DRY GAS OUTLET HEADER 2"F9JOS 230-MV-12387 N10 N8B 1643 12"-101230-PV-11113-F00 3"-101230-PV-11158-F00 GWR LO 230 SDV 12362 D NO POCKETS 01 2" LST 12362 3"x2" NOTE 13 2" LI 12362 01 F03 F03 A03 12" RS 230 RTD TO DRY/LT HP FLARE HEADER 2"F2J-SC 2"F4J-S 01 230-MV-40173 230-MV-40174 N2 TT 12356 01088 + N8A 230 F00 NC S 230 10"-101230-PV-11112-F00 RS FE 12361 230 P SDV-1 G TI 12361 LO 01 2" S 230 H PI 12364 230 P 2" 230 230 230 TI 12364 1256 2"-101230-PV-11481-F03 NOTE 8 FC 10" 2"F2J 230-MV-12374 3/4"G2ZOS 230-MV-12369 230 S 2"F9JOS 230-MV-12367 2"F9JOS 230-MV-12362 F00 230 PI 12363B 230 SDV 12361 01046 FROM TEG CONTACTOR 230 H 230 2"D9ROS 250-MV-12355 D00 PDI 12363 S 230 PST 12365 230 PI 12363A 3"-101430-VH-14058-A03 3"A2RF-SC 430-MV-40171 3"x1" 3"F2JF 230-MV-12370 N6 HH H 1:100 C + 250 230 2" BF 2" SLOPE NO POCKETS PI 12365 H L 1/2"F9JOS 230-MV-12371 250 3"x2" 2"F9JOS 230-MV-12376 01 HH H FI 12361 3/4"D2ZOS-SC 430-MV-40172 LO P 1/2"F2J 01 230-MV-12388 1/2"BF f(x) 1/2"F9JOS 230-MV-12365 D NO POCKETS 01 230 FQI 12321 01054 A03 B03 F0 0 230 B TO TIC-12356 HOT GAS BYPASS CHECK VALVE LEAKAGE 1"F2" 230 PSV SET @ 12362 145 BARG C 1260 RECYCLE FROM BC DISCHARGE AND DISCHARGE COOLER 3202 4"-101250-PV-11480-D00 THIS DOCUMENT AND INFORMATION CONTAINED WITHIN IT, IS THE SOLE PROPERTY OF WDS AND MAY NOT BE USED, EXPLOITED, COPIED, DUPLICATED OR REPRODUCED IN ANY FORM OR MEDIUM WHATEVER WITHOUT THE PRIOR WRITTEN PERMISSION OF WDS. 1 FSD I NOTE 7 01033 1198 3/4"G2ZOS 570-MV-12363 2"-101230-PL-13130-A00 01 TO IP SEPARATOR INLET HEADER SLOPE J 1:100 2"-101570-DC-16091-F00 1651 J 01097 TO ASME 1500# CLOSED DRAIN HEADER 1 2 NOTES: 1. - REFER TO P&ID DRAWINGS TRION-201-WDS92-PX-PID-00004 THROUGH TRION-201-WDS92-PX-PID-00016 FOR LEGENDS AND SYMBOLS DETAILS. 2. PROVIDE 3 DIAMETERS STRAIGHT RUN PIPE UPSTREAM AND 1 DIAMETER STRAIGHT RUN PIPE DOWNSTREAM. 3. DELETED. 4. DELETED. 5. DELETED. 6. DELETED. 7. TUBING FROM LEVEL INSTRUMENT DRAINS PER RELEVANT INSTRUMENT 01 INSTALLATION DETAIL. 8. LIQUID IMPINGEMENT PLATE. 3 4 9. THIS TRANSMITTER IS PART OF AN IPL FOR THE TRION LOPA THUS IT IS LO. 10. REMOVABLE SPOOL FOR FUTURE PV IF HCDP SYSTEM IS INSTALLED. 11. SCRUBBER VENDOR TO CONFIRM INLET PIPING STRAIGHT LENGTH REQUIREMENT. 12. ACOUSTIC INSULATION FOR COMPRESSOR DISCHARGE AND RECYCLE LINES ON HOLD. 13. COMPRESSOR SUCTION PIPING DOWNSTREAM OF SCRUBBER TO BE CHEMICALLY CLEANED AND PASSIVATED. 14. REMOVABLE SPOOL THAT IS NORMALLY NOT INSTALLED. AIR GAP IS REQUIRED TO PREVENT DRAINING UNDER HIGH PRESSURE. VESSEL SHALL BE DEPRESSURED PRIOR TO INSTALLING 01 TEMPORARY SPOOL FOR DRAIN. 5 6 01 23-Sep-24 7 ISSUED FOR CONSTRUCTION 8 HP MM 9 23-May-24 ISSUED FOR DESIGN HP MM DS / IKS C 12-Feb-23 ISSUED FOR HAZOP HP MM DS/IKS B 05-Dec-23 ISSUED FOR HAZOP HP MM DS A 01-Nov-23 ISSUED FOR IDC - SUPERSEDES TRION-TS-BHP16-PX-PID-01053 HP VT MM REV. DATE REVISION - DESCRIPTION BY RA: REVIEWED AND ACCEPTED FINAL AND CERTIFIED: WORK MAY PROCEED RN: REVIEWED AND ACCEPTED AS NOTED REVISE AND RE-SUBMIT: WORK MAY PROCEED RR: REJECTED: INCORPORATE COMMENTS AND UPDATE REVISE AND RE-SUBMIT: WORK MAY NOT PROCEED INF: REVIEW NOT REQUIRED; DO NOT RESUBMIT FOR INFORMATION ONLY DS / IKS 00 CHK'D APP'D 10 DELIVERY MANAGER SIGNATURE REVIEW DATE 11 12 13 14 15 TRION Contract / PO No. 4513590877 P&ID BOOSTER COMPRESSOR SUCTION SCRUBBER SCALE: NONE BASE DWG No: PROJ. No: 258126 REV No: DWG No: TRION-201-WDS92-PX-PID-01053 REV No: 01