D0 D0 .4 D0 .6 UNABLE TO OPEN PIT .5 H V TR (AB ANS OV FO EG RM RO ER UN T7 D) .6 D0 D0 D1 D1 P EX 150 H PO SE V D .4 .6 D1.33 HV D0 .4 D0 .4 .6 D0 .6 D0 D0 .6 61 (AB 3-SR OV 002 E G SW RO ITC UN HR D) OO D0 .4 D0 .7 10 0S T .4 D0 D0 .4 D2.2 M D0 .4 ST EP D1 D0 EX .6 P PO 50 SE D D0 .5 S BA N K EX PO S ED .5 D0 D0 (4X .65 EM P15 PT 0X Y 6B 2X A HV NK ) SM103 DEPTH 1.27 .8 D0 D0 .8 0.8 D .8 D0 .6 D0 .5 D0 4P 50 6 1. D KN N U D0 D0 D2.7 D0 .86 P1 D0 5 .72 P1 0 EM 00 P EM TY PT Y D0 .87 P1 50 HV LE AB C .23 P3 P5 0 D0 .9 D0 D1 00 D0 .85 .7 D1 86002 D0 1X .75 EM P1 PT 50X Y 2 .8 .9 D1 D1 .3 .8 .9 D1.17 D 1. 2 P30 0 SM203 D2.8 CAR PARK D1 .5 D0 .8 EO T D MP T Y D0 .8 D1 .8 P1 00 E 2 1. D0 1X .75 EM P1 PT 50X Y 2 D0 .8 PE RA M 4P .8 D0.75 1XEM P150X2 PTY D1 D0 D1 .8 TR IAN 50 D3.7 HV DE S .8 SM104 DEPTH 1.27 P D0.87 D0.8 P50 D0.8 P50 .4 D1 D1 .4 LE D0 AR .25 P3 .8 D1.22 D1 EP C 00 KE P30 0 D1 .4 SM201 .4 .8 D BU M P D1 D3.2 D1.2 D1.5 D1.27 P300 D1.5 D0 SP EE D1 .5 .6 D0 .8 10 0S T ST EP D0 D0 .9 .6 STOP D1 .9 D3.2 PR OJ EC T D2.1 ST OR D1 .8 ES 10 0 ST D1 .5 D0 T EO D0 .9 D0.5 73 00R RE C .7 .7 D0 0 0 P1 OR .4 CO 5 NV EY D2 D2.9 ED OS 5 ST D1 D1 ·2 2 EXP D1.8 D0.6 SM205 RU .9 D1 CT U RA M P PL AN N ING .6 D0 5 .4 EO ER OV SM211 PT Y D0 .7 EM D0 .4 100 D0.7 63 00 RC EO T D0.65 LV D1 .8 D1 .6 P D0.6 86001 D0.5 D1 .8 D0.6 P15 0 10 0S T HE T GIVEWAY D1 AD ·2 D0 D0 .7 300 4 RC SM210 D0.5 D0 .6 UN D0.7 KN EP D0.85 AR D0.9 LV TY .8 MP .6 D1 50 .8 HV D2.5 HV D1 .6 SM209 -SOAKWELL D0 RIN G D1 .8 P1 D0 TH 50 E 5E P1 D0.9 D.0 · · · D0 EP .4 D0 .6 D0 one of the option is run cable in trench underground .7 D0 .9 15 0m m D1 SM K .8 D0 KE R EP BIN G D1.2 .8 D0 LV .8 D1 EO H T RIN G D1.1 D1 .5 .7 D0 EX IT D1 .5 D1.35 RT BOLLARDS EA D0 .4 D.0 5 D1.6 LV D1.4 D1.4 D0.9 G D1.5 RIN .8 NT 0.3 D D1.1 D.0 AIN 5E D0 .7 AR ER TH D0 30 0R C D0.4 .3 D0 .6 D1.1 D1.2 D1 LVX3 SM212 D1 EP .5 RIN D0 .9 R ST .8 D0 50 P1 R D0 D0 .7 D 0. 5 D0 5 .4 LV V L .8 D0 0.6 LV D .6 D0 .7 R O TO M 7 0. D D 45 0. D 5 .4 D0 0. 5 .5 D0 D0 P D 150 0. 9 P D 100 0. 8 5 D0 .5 P D 150 0. 8 5 FA 5 5 LV .7 D0 EY .5 E ST D0.7 LV P D 150 0. 8 D0 N P NEW SLAB LL D0 0. D0 .1 5 D0 .4 PU T R RA O N O S M FO R N T VE L C IGH O T U IN N TE G R E .4 D0 T EO D4 T D1.4 EO EX PO SE D D1 .4 D4 .2 D1 1 0. D PU AL 9 LL D 3. 4 EY D 1. 2 .4 D1 D 1. EO M AN U T R T EO D1 .5 D 1. 4 D1.1 EO T SE D EX PO 1 N 0. FA D D1 .5 D1 .8 TO O M A C NN O E N X TR E O FA L N PA N EL A C BO AB V LE E G TR RO AY UN 3 M ER 0. D SH ED D EP M ST AN U AL .7 D D0.25 .2 option to install cable for grid 5 &6 .4 D0 E 1. LEC 5 x TR 1. IC 5 x AL 1. P 35 IT D0 .5 D0 .62 P1 00 EM D0 PT D0 .78 Y .81 P15 EM 0 E PT MP Y TY E 1. LEC 5 x TR 1. IC 5 x AL 1. P 35 IT E 5 .6 D0 .45 D0 D1.3 EOT R TU EP C U D P1 .08 50 .6 D1 LV .8 75 RT H G 20 4 YO VE EA D0 PE SILO MIMIC CUBICLE D0.6 0. N O C D.0 5 .8 30 0R C D0.6 D0.4 .7 D0 .6 D0 .4 D0 D0 .8 D D EA H R VE O .1 D1 D0 D0 .8 D0.5 X3 0. D0.5 D0. 5 LV D0.5 .4 D D1 .2 D0.7 D0.6 D0.3 CO BE LU D0.5 IT ã D 1. 05 D0.6 D0 EX · 5 LV 1. .8 D0 D1 .5 D EP MAINTENANCE DROP ZONE D1.1