0494-06 Ergonomics and Work Analysis (Spring 2025) Assignment 1 1. In a chair factory, if 10 workers produce 1200 chairs in one 8-hour shift, what is its manpower productivity? If the actual output is 16.5 chairs/worker.hour, what is the efficiency of those workers? (1.5 pts) 2. The following data resulted from a study taken on a lathe machine: Pieces produced per cycle: 2 Average measured cycle time: 5.3 min Average cutting time (power feed): 3.6 min Performance rating: 110 percent Allowance (machine time): 10 percent Allowance (human effort time): 15 percent The operator works on the job a full 8-h day and produces 173 pieces. What is the operator’s efficiency for the 8-h day? (2 pts) 3. a) Express the standard time of 5.35 min in hours per hundred pieces. b) What would the operator’s efficiency be if 105 pieces were completed during an 8-h working day? c) What would the efficiency be if the operator set up the machine (standard for setup = 0.35 h) and produced 95 pieces during the 8-h workday? (1.5 pts) Assignments should be hand written and done individually. Your hand writing should be as clear as possible. No printed or photocopied assignments will be accepted. Due date: Wednesday 19 February 2025. Weight: 5%