PLTW Engineering Computer Integrated Manufacturing Activity 2.1.2 Mass Properties Analysis Worksheet Procedure 3. Answer the following questions using model 1. Model Properties Model Material: • Mild Steel (Steel, Mild) Material Properties • Density: 7.850 • Mass: 5.125 • Volume: 18.059 • Surface Area: 52.081 Model 1 – Slotted Angle Block © 2021 Project Lead The Way, Inc. 1 PLTW Engineering Computer Integrated Manufacturing a. What is the material cost of the part assuming that the cuttings are remelted and the cost of mild steel is $6.25 per pound? What is the material cost of the part assuming that the cuttings are not remelted? 5.128 * 6.25 = 32.05 7.004 * 6.25 = 43.78 b. What is the mass of the material lost in a typical machining process? 7.004 - 5.128 = 1.876 c. What is the cost of the lost material based on your calculations above? 1.876 * 1.25 d. What will the volume of the box (in cubic feet) need to be in order to ship 1000 parts packed without spacers? 24.664 * 0.0005787 = 0.01427 = 14.3ft^3 e. What other processes could be used to create the same part? One rectangle prism and mirror two trapezoidal prism © 2021 Project Lead The Way, Inc. 2 PLTW Engineering Computer Integrated Manufacturing Model Properties Model Material: Stainless Steel Material Properties Density: 7.99g/cm^3 Mass: 3.612 lb Volume: 12.499 in^3 Surface Area: 53.665 in^2 Model 2 – Mounting Bracket 4. Answer the following questions using model 2 a. What is the mass of the material lost in a typical machining process? 5 * 3 * 1.5 = 22.5 22.5 * 0.289= 6.503 lb 6.503 lb - 3.612lb = 2.891 lb b. What is the cost of the lost material based on your calculations above if the cost of stainless steel is $15.75 per pound? 2.891 * 15.75 = 45.33 c. What is the material cost of the part assuming that the cuttings are remelted? What is the material cost of the part assuming that the cuttings are not remelted? 3.612* 15.75 = 56.89 6.503 * 15.75 = 102.42 d. What is the cost to ship 1000 parts if current shipping costs are $3.75 per pound? 3.612* 1000 * 3.75 = 13,545.00 e. What other processes could be used to create the same part? combining two trapezoids on two layers of rectangle © 2021 Project Lead The Way, Inc. 3 PLTW Engineering Computer Integrated Manufacturing Model Properties Model Material: Aluminum 6061 Material Properties Density: 2.710g/cm^3 Mass: 3.357lb Volume: 34.291 in^3 Surface Area: 166.89 in^2 Model 3 – Support Bracket © 2021 Project Lead The Way, Inc. 4 PLTW Engineering Computer Integrated Manufacturing 5. Answer the following questions using model 3. a. What is the material cost of the part assuming that the cuttings are remelted and the cost of aluminum 6061 is $0.62 per pound? What is the material cost of the part assuming that the cuttings are not remelted? 3.357 * 0.62 = 2.08 9 * 5 * 4 = 180 180 in^3 = 17.64 lb 17.64 * 0.62 = $10.937 b. What is the mass of the material lost in a typical machining process? © 2021 Project Lead The Way, Inc. 5 PLTW Engineering Computer Integrated Manufacturing 17.64 - 3.357 = 14.283 lb c. What is the cost of the lost material based on your calculations above? 14.283* 0.62 =$ 8.86 d. How many parts can be painted with one gallon of paint that covers 400 ft2? 166.89 = 1.1589/400 = 0.003 = 345 parts e. What other processes could be used to create the same part? create multiple rectangular prisms and chamfer them Model Properties Model Material: Soft Yellow Brass (Brass, Soft, Yellow) Material Properties Density:8.47g/cm^3 Mass: 1.395kg Volume: 164.650mm^3 Surface Area: 29.882m^2 Model 4 –Pipe Support © 2021 Project Lead The Way, Inc. 6 PLTW Engineering Computer Integrated Manufacturing 6. Answer the following questions using model 4. a. What is the material cost of the part assuming that the cuttings are remelted and the cost of soft yellow brass is $13.50 per pound? What is the material cost of the part assuming that the cuttings are not remelted? 1.395kg = 3.075445 lb * 13.5/lb = 41.52 2.754kg = 6.072 (13.5) = 81.97 b. What is the mass of the material lost in a typical machining process? 2.754 - 1.395 = 1.359 kg c. What is the cost of the lost material based on your calculations above? 1.358 kg = 2.996* 13.5 = $40.45 d. What other processes could be used to create the same part? © 2021 Project Lead The Way, Inc. 7 PLTW Engineering Computer Integrated Manufacturing creating half of the model and then replicating it © 2021 Project Lead The Way, Inc. 8