25kW On-Grid Solar System Proposal

advertisement
Presented by:
Engr. Hussam Sarfraz
Ph # +923186444556
SYSTEM DETAILS: (25 KW ON Grid with Customized structure)
Sr. No.
Description
Qty
UoM
43
TOPCon Bifical, A
Grade TUV, CE,
Tier-1
1
5-YEARS
Replacement
Warranty& 10year service
warranty
30-40
Schneider/
simon/chint
For 43 panels
NOS
1
JOB
1
JOB
1. Power Generation System
Solar PV Modules
1.1
Type/Brand
Canadian TOPCon Bifical 575/580 watt
Power (W)
25.2KW
Solar Inverter
Type
Brand
Power
30kw Knox inverter
1.2
3-Phase, Remote Monitoring, Fault
ON Grid
30KW
Monitoring / Application/ Cloud Sharing/
Real-Time Data Sharing
2. Accessories
AC Breaker, DC Breaker, Surge Protection Devices for AC and DC
Supply, Distribution Box, Lockable Disconnect Switch With 100A
Main Breaker, Flexible pipes, Duct, PVC Pipes, Cable ties, anchor bolts,
2.1
clumps, etc... as per AEDB standards, MC4 Connector for PV
modules as well as for Inverter.
AC wire is not included.
3. Mounting Structure
Mounting Structure
Type
Mounting Structure
3.1
Customized / Elevated
778,837
375,000
933,700
Roof Top Customized Structure
4. PV System Installation, Earthing &Transportation
4.1 Transportation / Loading / un-loading (included)
4.2 Installation / Testing and Commissioning of the Unit
4.3 Earthing, Lightening Arrestor
5. Net metering Service
Documentation, File submission and Issuance of Net Metering NEPRA
Power Generation License (Documentation), Net metering Consultancy
5.1
complete and DISCO File processing, Demand Notice, Meter
Purchasing, P&I inspection, M&T inspection
Total
Rs. 2,087537/-
2
Terms and Conditions
Validity of offer
Mentioned prices are valid only for TWO days and may vary
as per dollar prices
80% at the time of booking
Payment
Terms
15% at delivery of equipment
5% after Meter Installation
Installation: 3-4 days
Delivery Time
License / File Processing: 30
– 20 days Bi-Directional Meter
Processing: 10 days
Net Metering
Relocation of
System
NCQ (Pvt.) Ltd. will assist in Net Metering enablement process
(documentation)
Client will be charged for relocation of system from one site to
another, as per actual
Scope of Work Civil Works, Special Structure, Transportation or any other than
the above-mentioned scope of work shall be charged as per
Not Included actual
Order
Reversal
After 30 days: Advance payment will be non-refundable
Solar Inverter: Workmanship
5 Years
Product
Solar Panel: Grade-A, TOPCon Bifical Workmanship 15 Years
Warranty
Solar Panel: Grade-A, TOPCon Bifical Performance
After Sales Service ONE Year
Pre-Condition
N/A
25 Years
3
Maintenance Guidelines:
The solar photovoltaic system will perform best when there are simple and periodic
maintenance tasks carried out to ensure safe, efficient, and reliable operation.
To increase the average output, solar panels should be cleaned. Following are some tips
that must be followed when cleaning the solar panels:
1. Solar panels can become incredible hot in sunshine. Either clean your solar panels
2.
3.
4.
5.
6.
7.
in the morning/afternoon, or pick a relatively cool day
Clean solar panels when they are moist or wet so any dirt so residue that is stuck
on them can be wiped off easily.
Never use an abrasive sponge or soap for your solar panel cleaning as you may
scratch the glass. The best way to clean solar panels by using a soft rag or
biodegradable soap.
Clean the surface of the solar panel with a soft cloth or sponge. You do not have to
clean the wiring underneath
Do not splash water on solar panels, as water spots maybe stay on surface of glass
and reduce solar panel efficiency. Be sure to evenly clean the surface.
Gloves should be worn while cleaning to avoid any cuts from sharp edges of solar
panel frames or structural steel.
Keep yourself at a reasonable distance from the safety railings while cleaning to
avoid any dizziness felt, if installed at heights.
4
Approximately Production
5
6
7
8