Presented by: Engr. Hussam Sarfraz Ph # +923186444556 SYSTEM DETAILS: (25 KW ON Grid with Customized structure) Sr. No. Description Qty UoM 43 TOPCon Bifical, A Grade TUV, CE, Tier-1 1 5-YEARS Replacement Warranty& 10year service warranty 30-40 Schneider/ simon/chint For 43 panels NOS 1 JOB 1 JOB 1. Power Generation System Solar PV Modules 1.1 Type/Brand Canadian TOPCon Bifical 575/580 watt Power (W) 25.2KW Solar Inverter Type Brand Power 30kw Knox inverter 1.2 3-Phase, Remote Monitoring, Fault ON Grid 30KW Monitoring / Application/ Cloud Sharing/ Real-Time Data Sharing 2. Accessories AC Breaker, DC Breaker, Surge Protection Devices for AC and DC Supply, Distribution Box, Lockable Disconnect Switch With 100A Main Breaker, Flexible pipes, Duct, PVC Pipes, Cable ties, anchor bolts, 2.1 clumps, etc... as per AEDB standards, MC4 Connector for PV modules as well as for Inverter. AC wire is not included. 3. Mounting Structure Mounting Structure Type Mounting Structure 3.1 Customized / Elevated 778,837 375,000 933,700 Roof Top Customized Structure 4. PV System Installation, Earthing &Transportation 4.1 Transportation / Loading / un-loading (included) 4.2 Installation / Testing and Commissioning of the Unit 4.3 Earthing, Lightening Arrestor 5. Net metering Service Documentation, File submission and Issuance of Net Metering NEPRA Power Generation License (Documentation), Net metering Consultancy 5.1 complete and DISCO File processing, Demand Notice, Meter Purchasing, P&I inspection, M&T inspection Total Rs. 2,087537/- 2 Terms and Conditions Validity of offer Mentioned prices are valid only for TWO days and may vary as per dollar prices 80% at the time of booking Payment Terms 15% at delivery of equipment 5% after Meter Installation Installation: 3-4 days Delivery Time License / File Processing: 30 – 20 days Bi-Directional Meter Processing: 10 days Net Metering Relocation of System NCQ (Pvt.) Ltd. will assist in Net Metering enablement process (documentation) Client will be charged for relocation of system from one site to another, as per actual Scope of Work Civil Works, Special Structure, Transportation or any other than the above-mentioned scope of work shall be charged as per Not Included actual Order Reversal After 30 days: Advance payment will be non-refundable Solar Inverter: Workmanship 5 Years Product Solar Panel: Grade-A, TOPCon Bifical Workmanship 15 Years Warranty Solar Panel: Grade-A, TOPCon Bifical Performance After Sales Service ONE Year Pre-Condition N/A 25 Years 3 Maintenance Guidelines: The solar photovoltaic system will perform best when there are simple and periodic maintenance tasks carried out to ensure safe, efficient, and reliable operation. To increase the average output, solar panels should be cleaned. Following are some tips that must be followed when cleaning the solar panels: 1. Solar panels can become incredible hot in sunshine. Either clean your solar panels 2. 3. 4. 5. 6. 7. in the morning/afternoon, or pick a relatively cool day Clean solar panels when they are moist or wet so any dirt so residue that is stuck on them can be wiped off easily. Never use an abrasive sponge or soap for your solar panel cleaning as you may scratch the glass. The best way to clean solar panels by using a soft rag or biodegradable soap. Clean the surface of the solar panel with a soft cloth or sponge. You do not have to clean the wiring underneath Do not splash water on solar panels, as water spots maybe stay on surface of glass and reduce solar panel efficiency. Be sure to evenly clean the surface. Gloves should be worn while cleaning to avoid any cuts from sharp edges of solar panel frames or structural steel. Keep yourself at a reasonable distance from the safety railings while cleaning to avoid any dizziness felt, if installed at heights. 4 Approximately Production 5 6 7 8