Uploaded by Jeb Dimatatac

SEL-TPR Fault Indicator Installation Guide

advertisement
Installation Instructions for SEL-TPR
3-Phase, Remote Large Target
Before installation of fault indicators
and sensors, read and understand all
2.5
instructions in their entirety. For assis- APPROX< (65)
tance, contact Customer Service at
(509) 332-1890 or by email at
info@selinc.com.
1.7
(43)
3.7
(95)

CAUTION
Install fault indicators and sensors in
accordance with normal safe operating
practices. These instructions are not
intended to replace or supersede existing safety or operating requirements.
Only trained qualified personnel should
install or operate fault indicators and
sensors.
Ø1.7
(Ø44)
Ø2.5
(Ø64)
Install the Display
➤
Mount the stainless-steel bracket to position the “L” display for optimum
Stainless-Steel
viewing.
Bracket
➤ Use the integral threaded stud and hex nut to mount the display to the bracket.
Hand tighten the hex nut. Do not overtighten.
Hex Nut
Note: Optional Display Panel Mount Kits are sold separately. Consult the factory for ordering
information.
“L” Display
Install the Internal Adapter Ring (if Required) and the Phase Sensor(s)
➤
Elastimold 15, 25, and 35 kV PCE elbows with molded test points require the internal adapter rings. Complete Steps A–G.
➤ Hubbell, Chardon, RTE, Cooper, or GE-Chardon elbows with molded test points do not require the adapter ring.
Complete Steps E–G only.
A
Ridge
B
C
D
Ridge
Ridge Groove
Internal adapter ring
Fold into a “U” shape
SCHWEITZER ENGINEERING LABORATORIES, INC.
2350 NE Hopkins Court • Pullman, WA 99163-5603 U.S.A.
Phone: +1.509.332.1890 • Fax: +1.509.332.7990
selinc.com • info@selinc.com
Align the ridge with the groove
Release the “U” shape and
press the ridge into the groove
25-0017.A
Page 1 of 2
Installation Instructions for SEL-TPR
3-Phase, Remote Large Target
E
F
G
Arrow on Label
Test Point Cap
Remove the test point cap. Clean and dry
the test point. Apply a silicone dielectric
grease to the inside of the sensor boot.
Elbow Pulling Eye
Use a push/twist motion to seat the phase
sensor on the test point.
Align the arrow on the label with the elbow
pulling eye.
Magnetic Cable Guides hold cables and leads neatly within the enclosure.
Catalog Number: MCG
SCHWEITZER ENGINEERING LABORATORIES, INC.
2350 NE Hopkins Court • Pullman, WA 99163-5603 U.S.A.
Phone: +1.509.332.1890 • Fax: +1.509.332.7990
selinc.com • info@selinc.com
25-0017.A
Page 2 of 2
Download