LV Switchboard Maintenance Schedule Checklist

advertisement
Electrical Services
Maintenance Schedule
Project Jaguar
5 Maintenance Schedule
5.1 Standard Maintenance Schedule Checklist for LV Switchboard
Electrical Distribution Systems:
No.
1.
2.
LV Switchboard Maenance Schedules
Checklist
LV
Switchboards
❒ Check function of all power meters before
shutdown.
❒ Check function of lamps
and indicators.
❒ Check surge protection device where
installed.
❒ Inspect locking devices for signs damage
or worn.
❒ Inspect any sign of corrosion, leakage of
oil, gas or compound and
any unusual smell and noise.
❒ Verify control circuit fuse rating and
continuity.
❒ Visual inspection for signs of overheating
or deterioration.
❒ Inspect control wiring, relays, timers, fuse
carriers etc where applicable.
❒ Clean, vacuum and full visual inspection of
exterior and interior of
all LV switchboards.
❒ Final visual inspection to insure all clear
after work completed.
❒ Inspection of all panels for paint work
damage and signs of corrosion.
ACB Chassis
Checks
❒ Rack out
ACB.
❒ Clean / vacuum internal
chassis.
❒ Check operation of safety shutters closing.
Maintenance Schedule
Every
Weekly Monthly Anually
2
Years
Change
Only
If
required
X
X
X
X
X
X
X
X
X
X
X
X
X
X
1/3
Electrical Services
Maintenance Schedule
Project Jaguar
❒ Check shutter locking
devices are intact.
❒ Check operation and position of contacts.
❒ Operate
padlocking system.
❒ Grease clusters as
necessary.
3.
4.
5.
X
X
X
X
ACB’s
Checks
❒ Check general condition
of the device.
❒ Clean / vacuum
ACB.
❒ Check filters clean /
vacuum arc-chutes.
❒ Visual check for contact
wear.
❒ Check auxiliary wiring
insulation.
❒ Check ACB
locking devices.
❒ Open / close
manually.
❒ Charge the device
manually.
❒ Check earth fault protection / earth leakage
protection.
❒ Grease disconnect contacts as necessary.
MCCB's
checks
❒ Check general condition
of the device.
❒ Open / close
manually.
❒ Check auxiliary wiring
insulation.
❒ Fuse and fuse
holders
❒ MCCB trip test
with report.
Busbar & Busbar Chamber & Accessories
❒ Visual inspection for signs of overheating
or deterioration
Maintenance Schedule
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2/3
Electrical Services
Maintenance Schedule
Project Jaguar
❒ Visual inspection all
Power bar runs
❒ Check supports, alignment, straight runs &
joint packs
❒ Check panel flanges, earth continuity etc.
❒ Check all cable connections for tightness
and torque terminals
6.
Meters
Instrument
❒ Voltage
connections
❒ CT
connections
❒ Modbus
connections
❒ Clean thoroughly exterior and interior
meter instrument
❒ Check function of all
power meters
❒ Verify control circuit fuse rating and
continuity
❒ Check function of lamps
and indicators
❒ Inspection to insure all clear after work
completed before fitting covers
❒ All labeled secure
in place
Maintenance Schedule
X
X
X
X
X
X
X
X
X
X
X
X
X
3/3