1. According to the EIS methodology, when issues are uncovered during the Site-Audit, who should be notified? Mark for Review Points (Choose all correct answers) Oracle sales management Oracle Premier Support Installation coordinator if applicable Customer point of contact (*) [Incorrect] Incorrect! Please review the course content and try again. 2. Why should you use the EIS methodology to guide your installation process? Review Points Mark for The EIS methodology provides a 20% discount on Support Services if you install your customers’ hardware or software using it Larry Ellison has mandated using EIS Using the proven EIS methodology will provide step-by-step installation guidelines, help guarantee a quality installation, make your life easier, and ensure customer satisfaction (*) Installation processes are very lengthy, the EIS methodology is quick and dirty [Correct] Correct! 3. Why is the rate of temperature change when acclimatizing systems such an important factor as described in the EIS methodology? Mark for Review Points Systems should be warmed up and powered ON as quickly as possible to optimize the installation project timeline It is actually not relevant or important Variations in temperature should not exceed the approved gradient of approximately 2° C (4° F) per hour, because ignoring this may could lead to long-term damage (hair-cracks) on the boards (*) Variations in temperature do not have as big an impact as do Service contract considerations for how long an installation will take [Correct] Correct! 4. What are three items in the EIS Site-Audit Report are documented for all Oracle hardware? Mark for Review Points (Choose all correct answers) IP Address requirements Access Route requirements (*) Facility Power requirements Operating System requirements Operating Environment and Cooling requirements [Incorrect] 5. Incorrect! Please review the course content and try again. What are two activities that take place during the System Test step of the EIS methodology? Mark for Review Points (Choose all correct answers) On Solaris-based systems, Oracle's Explorer Data Collector will be run and the results evaluated with ORAS/CLI from the EIS-DVD (*) Electrical grounding and environmental assessment Application installation, configuration, and testing Tests specified in the Test Procedures Plan Plan will be carried performed [Incorrect] 6. Incorrect! Please review the course content and try again. Which three responses are true regarding EISdoc v4? Mark for Review Points (Choose all correct answers) Contains documents matched to the steps in the EIS Methodology Is accessible to customers and end-users of Oracle hardware and software Is available on the partner Enterprise Installations Standards web page and on the EIS-DVD Is an OpenOffice-based set of documentation that includes planning for installations of Oracle equipment and some software (*) Is a free guide to configuring Oracle software [Incorrect] Incorrect! Please review the course content and try again. 7. What four tasks are typically happening at the EIS Planning and Preparation stage in the installation process? Mark for Review Points (Choose all correct answers) Begin work on Project Schedule Notification of Customer Installation project (*) Identify Installation team – Oracle Installation Coordinator, Project Manager, Customer Point of Contact, others as needed Unpack and power ON systems Cable and install systems into custom rack Compile EIS planning documents [Incorrect] Incorrect! Please review the course content and try again. 8. Why do the EIS Standards recommend that external cables between Oracle hardware, such as servers, storage devices, network devices and ports be clearly labeled? Mark for Review Points For ease of maintenance it should be unambiguously clear from the label on each cable, where the cable has to be attached (*) Labeling is not an EIS best practice Service requests for field diagnostics will not be accepted unless cables are labeled Cable routing should be done with rubber bands for ease of reconfiguration [Correct] Correct! 9. What are three types of configuration information typically documented in an Installation Configuration Plan? Mark for Review Points (Choose all correct answers) Power cord specifications Boot Disk Layout IO cards and controllers System host names (*) System documentation and guidelines General and Management Network Configuration [Incorrect] Incorrect! Please review the course content and try again. 10. Which two EIS documents are most useful during the Installation and Configuration of Oracle Hardware and Software step? Mark for Review Points (Choose all correct answers) Site-Audit Report EIS Checklist Installation Configuration Plan (*) DVD Operational Handover Agreement [Incorrect] Incorrect! Please review the course content and try again. 11. Why should you typically complete the Installation Configuration Plan and create your Test Procedures Plan at the same time? Mark for Review Points You should create the Test Procedures Plan after you have completed the system installation and configuration. Test Procedures plan is a standard document used in all generic system installations. As you work through the system configuration process with your customer, you should state how you will test key items in the system’s configuration for having been successfully completed. (*) [Correct] 12. Correct! When should you review deliverables and why? Mark for Review Points Ideally EIS deliverables would be reviewed at the very start of an installation project, as they clearly define scope, roles and responsibilities, and project deliverables (*) EIS deliverables are an interim checklist to ensure that at the mid-way point of an installation the project remains on track. EIS deliverables are included in the Oracle system shipping and packaging documents near the start of an installation EIS deliverables are used as a last step in the installation process to ensure the installer provided everything that is required [Correct] 13. Correct! What is the primary purpose of the”Basic Solaris” standard? Mark for Review Points Specifically describes how to install Solaris on non-SPARC hardware Describes how to install legacy versions of Solaris on systems that need to support backward compatible applications Differentiates between Linux and Solaris installation processes on dual-boot systems Defines a method for achieving a consistent installation for Oracle Servers with Solaris OS (*) [Correct] Correct! 14. What tasks occur during the operational handover phase of the EIS methodology? for Review Mark Points (Choose all correct answers) Collate the EISdocV4 documents pertaining to this customer installation, and product documentation for handover (*) Provide the customer the 20% installation service rebate that is required after a successful installation Document the serial number for the system(s) installed, as well as any comments pertaining to the installation Obtain customer signatures to successful close project [Incorrect] Incorrect! Please review the course content and try again. 15. What are the two primary objectives for the Installation Configuration Planning step of the EIS methodology? Mark for Review Points (Choose all correct answers) Oracle/Partner confirms power and cooling requirements for system installation Tests that will be performed during the Systems Testing will be defined. (*) Oracle/Partner and Customer will determine and mutually agree upon the hardware and software installation requirements which will be documented in the Installation and Configuration Plan (*) Customer provides walk-through of installation site [Correct] Correct! 16. What should you do with the EIS checklist when an installation project is complete? for Review Mark Points Post the EIS checklist and Test Procedures Plan to My Oracle Support under your customer’s account Leave the EIS checklist with the customer so that they can re-install when they need to Crumple the checklist and throw it in the customer wastepaper bin Remove the EIS checklist and other confidential Oracle Intellectual Property from the customer datacenter (*) [Incorrect] Incorrect! Please review the course content and try again. 17. What do EIS deliverables define? Mark for Review Points EIS deliverables give a high level description of the scope of the EIS activities for each product or product family (*) EIS deliverables are the Customer Support Identifiers that customers use for field delivery service after an installation has completed EIS deliverables are the documents that are left behind with customers after an installation service is performed EIS deliverables describe detailed process steps for each phase of the installation service [Incorrect] 18. Points Incorrect! Please review the course content and try again. What are two statements that are true about EIS checklists? Mark for Review (Choose all correct answers) Checklists are publicly available on oracle.com Checklists are intended as guidelines for properly trained installers and are NOT a substitute for appropriate product training. EIS installation checklists are intended to guide the installer through the installation in a logical and consistent manner (*) Checklists are a valuable tool to share with customers so they know how to install systems themselves [Incorrect] Incorrect! Please review the course content and try again. 19. What is the mission statement for use of the Enterprise Installation Standards? Mark for Review Points To drive consistent best practices for Oracle Services field delivery To use a methodology for support service that is from the field, created by the field for the Field. To manage communication and resolution of Services Requests in a timely and customer-friendly manner To drive the ongoing development and usage of Enterprise Installation Standards (EIS), resulting in consistent, high quality, and cost effective installations that speed time to deployment and provide the foundation for enhanced stability and performance. (*) [Correct] Correct! 20. Name two functions for the EIS-DVD during the Installation and Configuration of Oracle Hardware and Software step in the EIS methodology? Mark for Review Points (Choose all correct answers) Provides an excellent tool as a leave behind utility for customers Provides installation assessment and diagnostic tools (*) Contains required patches and firmware for most installations Used as a back-up for complete documentation sets that are on http://docs.oracle.com [Incorrect] Incorrect! Please review the course content and try again. 21. What is the primary goal of the Installation and Configuration of Oracle Hardware and Software step in the EIS methodology? Mark for Review Points Hardware cabling , wiring and Power ON Troubleshooting software configuration issues System acclimatization, installation, and basic configuration (*) Managing transition from Installation phase to Field Service issue recording [Correct] 22. Correct! What are Oracle Standard System Installations (OSSI)? Mark for Review Points Installation Services sold by 3rd party service providers Field Delivery Support Services offered through certified partners Advanced professional services offered by IBM Global Services Installation Services sold by Oracle Advanced Customer Support (*) [Correct] Correct! 23. Which four documents are included as part of the Operational Handover? Review Points (Choose all correct answers) Test Procedures Plan MOS Internal Documentation Installation and Configuration Plan EIS Checklist for the System installed Site Audit Report (*) Mark for System Documentation [Incorrect] Incorrect! Please review the course content and try again. 24. For safety awareness with respect to grounding, if a system has been modified after the manufacturer's assembly process, what three recommendations does the EIS Grounding Standard make? Mark for Review Points (Choose all correct answers) If qualified personnel did not test the safety of the modified system then proper testing should be requested before Oracle and/or partner personnel will work on the equipment Check whether the modification involved any power supplies, distribution units or wiring? (*) If modifications involved any power supplies, distribution units or wiring, did qualified personnel verify that the modification was was correct and did they test the system to ensure that it doesn't pose any safety hazard? Determine whether the local electrician can support the installation process If the temperature is below 60 degrees F., warm the room first before power ON [Incorrect] Incorrect! Please review the course content and try again. 25. What is the purpose for the Operational Handover step in the EIS Methodology? for Review Points Perform system testing and diagnostics Documents how to use the EIS documentation and standards Documents the installation and configuration of Customer's system(s) (*) Used to negate responsibility for any ongoing System issues Mark [Correct] 26. Correct! What should partners do before first using ESISdocV4? (Select two) Mark for Review Points (Choose all correct answers) Submit their EIS Test Procedure Plan outcomes Review the Openoffice presentation on EISdoc V4 found on the EIS Planning & Documentation web page Review the “EISdoc V4 Getting Started Cookbook” and “Success with EISdoc V4 Cookbook” (*) Review Oracle product overview documentation [Incorrect] Incorrect! Please review the course content and try again. 27. Which three statements are true about EIS? Mark for Review Points (Choose all correct answers) EIS is a methodology designed to address issues before, during and after the actual hands-on installation of Oracle systems (*) EIS is a quick and dirty process for expediting Oracle system installations EIS stands for “Enterprise information Standards” EIS evolved from the field, is sustained by those closely involved with the field, and is intended to assist the field (*) EIS stands for “Enterprise Installation Standards” (*) [Correct] Correct! 28. What are the four key points covered in each test topic of the Test Procedures Plan? for Review Points (Choose all correct answers) Prerequisites Method Conclusion Objective (*) Test Result Outcome Mark [Incorrect] Incorrect! Please review the course content and try again. 29. Assuming a SPARC T5 Server installation on which you install Solaris 11, what EIS documentation, at a minimum, is it recommended that you bring to support you in the installation project? Mark for Review Points (Choose all correct answers) EIS Installation Checklist for Sun Datacenter InfiniBand Switch 36 EIS Installation Checklist for Common Array Manager EIS Installation Checklist for Solaris 11 OS EIS Installation Checklist for SPARC T5 (*) [Incorrect] 30. Incorrect! Please review the course content and try again. When should the Site-Audit be performed? Mark for Review Points Prior to the completion of the sale, in order to ensure that the customer’s location is viable After the system has been acclimatized and is ready for unpacking at the customer site As soon as possible, and certainly prior to delivery of the system (*) As soon as the product has been delivered to the customer [Incorrect] 31. Points Incorrect! Please review the course content and try again. What is found on the EIS-DVD? Select all the apply. Mark for Review (Choose all correct answers) Sales and presales technical training on Oracle systems Tools to help verify the quality of the installation (e.g. ORAS/CLI) A complete set all configuration files for every Oracle server, storage system and Engineered system Scripts that assist during the installation (*) Selected Oracle/Sun Software [Incorrect] 32. Points Incorrect! Please review the course content and try again. Name three of the problems that EIS was created to overcome? Mark for Review (Choose all correct answers) Standards for delivery of replacement parts for Oracle hardware Oracle hardware shipping best practices for on-time delivery Inconsistent installations: Customers buying identical servers for two locations were dismayed to find different patch levels, firmware versions etc. (*) Lack of formal agreement with customers as to outcome of an installation (*) Poor communication/use of Best Practices (*) [Correct] 33. Points Correct! What is the primary purpose of the EIS-DVD? Mark for Review The EIS-DVD is an annually released product which support all hardware installations, and documents all bugs and issues that have been logged during the prior year The EIS-DVD is a tool that is provided to installation partners as a give-away to customers The EIS-DVD is to help installers of Oracle/Sun products perform consistent installations in an efficient manner. (*) The EIS-DVD is used for on-the-job tutorials on how to install Oracle servers and storage [Correct] Correct! 34. If the customer has asked for some customization of their installation, how is testing for that accomplished? Choose all responses that apply. Mark for Review Points (Choose all correct answers) Not all installation actions need testing Additional tests can be inserted into the Test Procedures plan (*) Oracle is automatically responsible for any non-standard installation procedure, regardless of whether they were agree to as part of the Installation and Configuration Plan Testing above and beyond the Covered System Tests are at the sole discretion of Oracle and/or the Partner installer [Incorrect] 35. Incorrect! Please review the course content and try again. Which four objectives are primary goals for an EIS Site Audit? Mark for Review Points (Choose all correct answers) Determine how many logical domains need to be configured on the system Determine the floor weight load capacity at the location where the System will be installed (*) Determine installation needs for the System, including such assessments as: the suitability of access routes to the installation location, such as doors, elevators, floor strengths and ramps (*) Determine how frequently system backups will be completed Determine the environmental conditions at Customer's site including temperature, humidity, cleanliness and such other assessments as are determined to be necessary in Oracle's sole discretion (*) Determine the availability of required electrical power to run and maintain the System (*) [Correct] Correct! 36. What are two cautions that should be acknowledged when acclimatizing a system? for Review Points (Choose all correct answers) Mark The maximum positive or negative temperature gradient that is permitted for multi-layer<br>boards is approximately 2° C (4° F) per hour. (*) Avoid unpacking items inside the computer centre (dust/dirt contaminating filters etc.) Once powered on the temperature is no longer an issue, as internal cooling systems commence Powering ON the system will speed the acclimatization process as the heat from the system will accelerate its warming [Incorrect] 37. Incorrect! Please review the course content and try again. What is the main purpose of the EIS methodology? Mark for Review Points To use best practices, standards, methodologies and continuous process improvement to ensure consistent, efficient, supportable and high quality product installations globally (*) To provide a foundational methodology for front line support triage by Help Desk providers. To enable customers to install and service Oracle hardware and software. To use best practices to support standard field delivery and break/fix services by partners. [Correct] Correct! 38. Why it is important to do Installation planning, rather than just asking the customer as you work through the installation process? (Select three) Mark for Review Points (Choose all correct answers) Continuing interruptions can detract from the professionalism of your work, and lead to customer dissatisfaction (*) Pricing for Installation Services is less expensive if planning in not included Support Services will not engage on services requests if no installation planning was done Customer technical contact may not be readily available (*) Planning leads to more thoughtful consideration for a predictable outcome of the installation process (*) [Correct] 39. Correct! Why are EIS deliverables relevant for Partner installations too? Mark for Review Points When partners use the EIS deliverables and submit documentation to that effect, their customer gets a 25% discount on support EIS deliverables describe the amount of time, materials and deliverables are in scope for a standard installation (*) Advanced Customer Services mandates that Partners use the EIS methodology for installations EIS deliverables provide flexibility when customers want to make ad-hoc configuration changes [Correct] Correct! 40. Which Oracle products are covered by EIS Checklists – select all that apply. Review Points (Choose all correct answers) Engineered Systems Switches Oracle Fusion Middleware OS and Cluster-related Software Mark for Storage Servers (*) ERP applications [Incorrect] Incorrect! Please review the course content and try again. 41. What are three factors that influence how long a system (server, storage, engineered system) will require to be acclimatized after delivery to a customer, before power can be applied without causing damage? Mark for Review Points (Choose all correct answers) humidity temperature (*) timezone cleanliness data center space [Incorrect] Incorrect! Please review the course content and try again. 42. What two activities are accomplished during Installation Task Planning step in the EIS Methodology? Mark for Review Points (Choose all correct answers) Organization of the team who will actively work the Installation (*) Networking and system component cabling Review the timeframe options for delivery of the service Communicate schedule for installation to the customer (*) System unpacking and acclimatization [Incorrect] Incorrect! Please review the course content and try again. 43. What three documents are typically used as part of the EIS Planning and Preparation stage in the installation process? Mark for Review Points (Choose all correct answers) Site Audit Report (*) Installation and Configuration Plan Project Schedule Operational Hand-off Form Acclimatization Report Test Procedures Plan [Incorrect] Incorrect! Please review the course content and try again. 44. What if the customer has their own labeling methodology that differs from the recommended one from EIS? Mark for Review Points Follow the customer's standard for cable labeling provided it meets with EIS requirements for identification and port location. (*) Ignore the customer’s standard and use the EIS standard Submit a Service Request for Oracle approval on use of the customer labeling and routing methods Redo cabling throughout the datacenter to meet the EIS standard [Correct] Correct! 45. What three typical activities are done during the Project Initiation phase of the EIS Methodology? Mark for Review Points (Choose all correct answers) The EIS Site-Audit is scheduled (*) Details about the project are identified and documented, for example, is this a single system installation or a complex, multi-product installation (*) System configuration details are documented. System delivery occurs, and the project commences Details about the customer are determined and documented (*) [Incorrect] 46. Incorrect! Please review the course content and try again. Who is involved in the Project Initiation phase? Mark for Review Points (Choose all correct answers) 3rd party Service Provider Oracle Financing contact Partner point of contact (*) Customer point of contact (*) Oracle Installation Coordinator or Project Manager (if applicable) (*) [Correct] Correct! 47. You are assigned to an installation project in France in February to install 5 new SPARC T5 servers. The servers, in their original packaging, are sitting in the customer’s loading dock with a temperature of 8 degrees C (46 degrees F). The customer’s data center is 20 degrees C (68 degrees F). What is the recommended next step in acclimating these systems? Mark for Review Points Move the systems (still packed) into a room with a similar environment to the data center (*) Unpack the servers and store in the data center Move the systems (still packed) into the data center Unpack the servers and store in the loading dock [Incorrect] Incorrect! Please review the course content and try again. 48. What should you do if you believe you have found an error in an EIS checklist? Review Mark for Points Follow the feedback method on the last page of every checklist: email SUPPORT-PARTNERQUESTIONS_WW_GRP@oracle.com (*) Email Larry Ellison and recommend changes Submit your concerns to My Oracle Support Assume that the EIS team is already aware and the next version of the checklist will be updated [Correct] Correct! 49. Which docs & tools need to be prepared before installing a PCA System? Review Points (Choose all correct answers) Slide Rail Kits Screwdrivers and wrenches (*) EIS Install Checklist for Private Cloud Appliance (*) Rack Installation Tools including Rack Door keys and side panel remove tool (*) Cage nuts and tools (*) Mark for [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 50. In a PCA deployment, both Ethernet and FC modules are configured in the PCA System. Before installing the PCA System, which preparations are mandatory to enable connectivity to data center fabrics? Mark for Review Points (Choose all correct answers) Cables to FC Modules and Ethernet Modules (*) DNS Servers in data center IP settings for dual Management Nodes and Management Cluster (*) Transceivers on FC Modules and Ethernet Modules NTP Servers in data center (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 51. Which components should be included inside the Server Upgrade Kits for Private Cloud Appliance? Mark for Review Points (Choose all correct answers) Rack mounting kits (*) Cable Management Arm (CMA) Power cords and network cables Installation manual and instructions (*) Oracle x86 server (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 52. Which statements about stabilizing and grounding a PCA System are correct? Review Mark for Points (Choose all correct answers) Grounding cable from racks is optional to provide extra safety. (*) Stabilizing with Mounting Brackets can make system more stable but has more restricted requirements to installation location. (*) For a fully loaded Private Cloud Appliance, only stabilizing with Mounting Brackets is allowed. If customers want to move a PCA System to different locations, the PCA System should be stabilized with Leveling Feet. (*) The PDUs in system racks can provide necessary grounding for the Private Cloud Appliance through power cords. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 53. Which statements about cabling a PCA System are correct? Mark for Review Points (Choose all correct answers) Power cords can be routed from top or bottom of each rack to work with different data center environment. (*) Before connecting network cables to the PCA System, the brackets at back of both Fabric Interconnect must be removed first. (*) Both 10Gb and GbE switches can be supported for Ethernet Connections. Power cords from PDUs are pre-loaded in the PCA System, however matched receptacles must be prepared by customer's data center. (*) Network cables from the PCA System should connect to network switches in data center. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 54. Which action are NOT correct when unpacking and moving a PCA System to installation location? Mark for Review Points Recycle packaging of the PCA System properly to protect environment Unpack racks at a location where is flat and can support total weight of the package Move racks from shipping pallet carefully to avoid rocking or tilting Push from both sides of racks to move it to installation location Throw away mounting brackets of racks because they are useless after installation (*) [Correct] 55. Correct! Which factors of a customer's data center need to be checked before deploying a PCA System? Mark for Review Points (Choose all correct answers) Installation Location (*) Environmental Conditions, including temperature, humidity and altitude (*) Security Requirements, including identifications and entry permission Power and Cooling facility (*) [Correct] Correct! 56. Please select the correct sequence of actions to install a new Compute Node into Private Cloud Appliance. Remove front & rear rack doors Remove filler panel of the RU to install the Compute Node Install rack doors Install the server on the rack Install Cable Management Arm 6. Connect pre-configured power cords and network cables Points 1, 2, 4, 5, 6, 3 (*) 1, 2, 4, 5, 3, 6 2, 1, 4, 5, 6, 3 Mark for Review 2, 1, 4, 5, 3, 6 [Correct] Correct! Connect external storage (Answer all questions in this section) 57. Which configuration rules are correct for connecting ZFS Storage Appliances with InfiniBand interfaces to a PCA System? Mark for Review Points (Choose all correct answers) IP settings for InfiniBand interfaces on ZFS Storage must be in a preserved range defined by the PCA System. (*) InfiniBand interfaces on storage controllers must connect to InfiniBand Switches in Base Rack of the PCA System. A PCA System can only connect to limited number of ZFS Storage Appliance with InfiniBand interfaces. (*) A Network Cloud must be created and provisioned to each Compute Node to enable connectivity to the ZFS Storage. ZFS Storage must be configured with dual controllers, which have a dual-port IB HCA on each controller. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 58. A new NAS storage is installed to provision resources for Guest VMs in a Tenant Group (TG1) which currently contains two servers ovcacn05r2, ovcacn06r2. Data Service Endpoint in the NAS storage is 10.1.10.12/24. IP addresses for NAS clients in Guest VMs must be in subnet 10.1.100.0/24, and gateway is 10.1.100.254. The ports (4:3) in IO Modules are selected as uplinks connecting the NAS storage. Which CLIs must be executed to configure vNICs for servers in the Tenant Group? Mark for Review Points (Choose all correct answers) # pca-admin create-network 'TG1_NAS_Network' external_network '4:3' (*) # pca-admin add network-to-tenant-group 'TG1_NAS_Network' 'TG1' (*) # pca-admin add network 'TG1_NAS_Network' ovcacn05r2; pca-admin add network 'TG1_NAS_Network' ovcacn06r2 # pca-admin create-network 'TG1_NAS_Network' host_network '4:3' 10.1.100 255.255.255.0 10.1.10.0/24 10.1.100.254 [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 59. When planning storage for a PCA deployment, which resources can be leveraged to store data for a production Oracle RAC solution in default Tenant Group? Mark for Review Points (Choose all correct answers) External FC LUNs which are provisioned to Compute Nodes in default Tenant Group (*) External iSCSI LUNs which are provisioned to Guest Domains that will host the Oracle RAC solution (*) OVM Repositories which are presented to the server pool by firmware An OVM Repository that is created from a NFS share which can be mounted on all server nodes in the PCA System External iSCSI LUNs which are provisioned to Management Nodes in the PCA System [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 60. To manage external storage devices from a PCA System, Admin Servers need to be configured in the Oracle VM solution. Compute Nodes can be picked from the following list: Rack1_ServerPool : ovcacn07r1, ovcacn08r1, ovcacn09r1, ovcacn10r1, ovcacn11r1, ovcacn12r1 Rack2_ServerPool : ovcacn07r2, ovcacn08r2, ovcacn09r2, ovcacn10r2, ovcacn11r2, ovcacn12r2 Unassigned Servers : ovcacn13r1, ovcacn14r1, ovcacn26r1, ovcacn27r1, ovcacn28r1 Which servers can be used as Admin Servers for the PCA solution? Mark for Review Points (Choose all correct answers) ovcacn07r1 ovcacn12r2, ovcacn28r1 (*) ovcacn07r1, ovcacn07r2 (*) ovcacn08r1, ovcacn09r1 All servers in Rack1_ServerPool [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 61. To leverage FC-SAN storage in data center, which sets of connections from a PCA System to external FC Switches (Switch 1, Switch 2) can establish a HA topology? Mark for Review Points (Choose all correct answers) Cloud C -> Switch 1, Cloud D -> Switch 2 (*) Cloud A -> Switch 1, Cloud B -> Switch 2 (*) Cloud C -> Switch 2, Cloud D -> Switch 2 Cloud A -> Switch 1, Cloud B -> Switch 1 [Correct] Corect! 62. To enable connectivity to Network Attached Storage (NAS) in data center, a Network Cloud is created with ports (4:2, 5:2) in Ethernet Modules. Which connections from the PCA System to external switches (Switch A, Switch B) can ensure HA of the topology? Mark for Review Points (Choose all correct answers) (4:2) in Fabric Connect A -> Switch B, (5:2) in Fabric Connect A -> Switch B; (4:2) in Fabric Connect B -> Switch A, (5:2) in Fabric Connect B -> Switch A (4:2) in Fabric Connect A -> Switch B, (5:2) in Fabric Connect A -> Switch A; (4:2) in Fabric Connect B -> Switch B, (5:2) in Fabric Connect B -> Switch A (4:2) in Fabric Connect A -> Switch A, (5:2) in Fabric Connect A -> Switch B; (4:2) in Fabric Connect B -> Switch A, (5:2) in Fabric Connect B -> Switch B (4:2) in Fabric Connect A -> Switch B, (5:2) in Fabric Connect A -> Switch A; (4:2) in Fabric Connect B -> Switch A, (5:2) in Fabric Connect B -> Switch B (*) (4:2) in Fabric Connect A -> Switch A, (5:2) in Fabric Connect A -> Switch A; (4:2) in Fabric Connect B -> Switch B, (5:2) in Fabric Connect B -> Switch B (4:2) in Fabric Connect A -> Switch A, (5:2) in Fabric Connect A -> Switch B; (4:2) in Fabric Connect B -> Switch B, (5:2) in Fabric Connect B -> Switch A (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 63. Which technologies can be leveraged to control resource access from a PCA System to external FC Storage? Mark for Review Points (Choose all correct answers) LUN Mask (*) Port-based FC Zoning (*) User-based Access Control WWN-based FC Zoning [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 64. In a PCA deployment, a new Network Attached Storage (NAS) will be used to expand storage capacity of the PCA System. Service endpoint of the NAS is 10.1.10.36/24. A Network Cloud is created as following for enabling network connections. # pca-admin create-network 'NAS_Network' host_network '10:1, 11:1' 10.1.100 255.255.255.0 However, some Compute Nodes in the PCA System can not discover storage resources in the NAS. Identify possible causes of the issue. Mark for Review Points (Choose all correct answers) Forgot to mark Storage Role of the datalinks in those Compute Nodes Forgot to add iSCSI initiators of those Compute Nodes into the LUN mask configuration of the NAS (*) The uplink (10:1) on Fabric Interconnect A in the PCA System is broken Mis-configuration of IP routing in those Compute Nodes (*) Forgot to provision the Network Cloud to those Compute Nodes (*) [Correct] Corect! 65. Identify storage devices that can be used as external storage resources for a Private Cloud Appliance deployment? Mark for Review Points (Choose all correct answers) Any storage array with QDR InfiniBand interfaces Any storage array with 10GB Ethernet interfaces (*) Any storage array with SAS-3 interfaces Any storage array with 1GB Ethernet interfaces (*) Any storage array with 16Gb Fibre Channel interfaces (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 66. A Network Cloud with ports (10:3, 11:3) is created dedicatedly to enable external NAS connectivity. Two external Ethernet Switches (Switch A, Switch B) are deployed to ensure redundancy. The port (10:3) in Fabric Connect A is connected to Switch A, which additional connections are required to enable HA of the topology? Mark for Review Points (Choose all correct answers) (11:3) in Fabric Connect B -> Switch A (*) (11:3) in Fabric Connect A -> Switch B (*) (10:3) in Fabric Connect B -> Switch A (10:3) in Fabric Connect B -> Switch B (*) (11:3) in Fabric Connect A -> Switch A (11:3) in Fabric Connect B -> Switch B [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 67. FC Modules are just installed into an existing PCA System to enable connectivity to external FC storage resources. Which CLIs need to be executed to provision Virtual HBAs to a Compute Nodes ovcacn32r1? Mark for Review Points (Choose all correct answers) # pca-admin add network "Cloud_A" ovcacn32r1 # pca-admin configure vhbas ovcacn32r1 (*) # pca-admin configure vhbas ovcamn05r1 ovcamn06r1 (*) # pca-admin create network "Cloud_A" [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 68. To manage an IB-based ZFS Storage Appliance from OVM Manager in a PCA System, which interface can be selected as backend of the management data link in the ZFS Storage? Mark for Review Points port0 in IB HCA NETMGMT SERMGT net0 (*) [Correct] Corect! 69. When connecting a PCA System to FC Switches (Switch 1, Switch 2) in data center, uplinks in Cloud A are connecting to Switch 1, which connections from other three Storage Clouds can ensure maximum reliability of the topology? Mark for Review Points (Choose all correct answers) Cloud B -> Switch 1, Cloud C -> Switch 1, Cloud D -> Switch 2 Cloud B -> Switch 1, Cloud C -> Switch 2, Cloud D -> Switch 2 Cloud B -> Switch 2, Cloud C -> Switch 1, Cloud D -> Switch 2 (*) Cloud B -> Switch 2, Cloud C -> Switch 2, Cloud D -> Switch 1 (*) Cloud B -> Switch 2, Cloud C -> Switch 1, Cloud D -> Switch 1 [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. 70. Two Admin Servers have been configured in a PCA System. Administrators can manage an external FC storage through OVM Manager. However one Admin Server can not discover physical LUNs created in the FC storage. Which statements can explain this phenomenon? Mark for Review Points (Choose all correct answers) vHBAs are not provisioned to the Admin Server. (*) FC uplinks from the PCA System are disconnected from external FC switches. Plugin component in the Admin Server is mis-configured. Management connection from the Admin Server to the FC storage is broken. LUN mask configuration in the FC storage prevent the server from accessing those storage resources. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Connect External Storage module and try again. Private Cloud Appliance Initial Configuration (Answer all questions in this section) 71. Which tab view in PCA Dashboard UI can be leveraged to monitor hardware components in Private Cloud Appliance? Mark for Review Points Monitoring Hardware View (*) Health System View [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 72. Which statements about Resetting Password best practices for Private Cloud Appliance are correct? Mark for Review Points (Choose all correct answers) Dashboard UI is the only tool to reset passwords for security services in Private Cloud Appliance. Must use identical password for same type of security service. (*) Should use different passwords for different security services. (*) Resetting passwords must be the first task during initial configuration. (*) Apply data center password policy to security services in Private Cloud Appliance. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 73. Which URLs can be used to access PCA Dashboard UI during initial configuration? for Review Points (Choose all correct answers) http://192.168.4.216/dashboard https://192.168.4.3:7002/dashboard (*) https://192.168.4.216:7002/dashboard (*) http://192.168.4.216/ (*) https://192.168.4.4:7002/dashboard Mark [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 74. Which statements about PCA Dashboard UI are correct? Mark for Review Points (Choose all correct answers) Role-based delegated administration is NOT supported by PCA Dashboard UI. (*) PCA Dashboard UI is the centralized tool for managing and monitoring a single Private Cloud Appliance deployment. (*) Same management functions as PCA Admin CLIs have been implemented in PCA Dashboard UI. PCA Dashboard UI is a service only runs on current master Management Node. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 75. Which credential is correct to login PCA Dashboard UI since firmware release 2.1.1? for Review Points admin/welcome1 ovcaadmin/welcome1 ovcaadmin/Welcome1 admin/Welcome1 (*) [Correct] Corect! Mark 76. Which sequence is correct to be performed by Field Engineers to power on a PCA System? Mark for Review Points Rack PDUs, Internal Storage, First Management Node (*) Rack PDUs, Internal Storage, First Management Node, Second Management Node, Compute Nodes Rack PDUs, Internal Storage, First Management Node, Second Management Node Rack PDUs, Fabric Interconnect, Internal Storage, First Management Node Rack PDUs, First Management Node, Internal Storage [Correct] Corect! 77. Which tasks are NOT expected to be performed during Private Cloud Appliance initial configuration? Mark for Review Points (Choose all correct answers) Reset passwords for Dashboard UI in Private Cloud Appliance Create additional physical LUNs in internal ZFS Storage Appliance (*) Assign external IP addresses for Private Cloud Appliance Upload ISO images and Templates into Oracle VM solution (*) Configure NTP client for Management Nodes in Private Cloud Appliance [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 78. Which network settings MUST be assigned during initial configuration? Mark for Review Points (Choose all correct answers) Hostname for management nodes External DNS Servers External NTP Provider (*) External IPs for both management nodes (*) Shared external IP for management cluster (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 79. Points Which credentials can be managed through Dashboard UI? Mark for Review (Choose all correct answers) Admin password of Dashboard UI (*) MySQL DB password of Oracle VM Manager deployment (*) root password of the Internal ZFS Storage Appliance (*) Password to protect SSL keystore of Oracle VM Manager ILOM root password of an individual Compute Node [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Installation module and try again. 80. Which components will be started by First Management Node in Private Cloud Appliance? Mark for Review Points (Choose all correct answers) Internal Switches Compute Nodes (*) Second Management Node (*) Internal Storage [Correct] Corect! Enable ASR Services (Answer all questions in this section) 81. Which component in ASR Architecture will monitor hardware component and generate Service Requests (SRs) when failure conditions are detected? Mark for Review Points ASR Manager (*) ASR Assets My Oracle Support ASR Infrastructure [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Configure ASR Service module and try again. 82. Points Which system component inside Private Cloud Appliance has an embedded ASR Manager inside? Mark for Review InfiniBand Switches ZFS Storage Appliance (*) PDUs in the Rack Server Nodes Fabric Interconnect [Correct] 83. Corect! Which folder in ASR Manager 5.x deployment should be moved to the shared internal storage? Mark for Review Points /var/opt/asrmanager (*) /usr/lib/asrmanager /var/log/asrmanager /opt/asrmanager [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Configure ASR Service module and try again. 84. To activate server nodes and switches nodes in Private Cloud Appliance as ASR assets, which IP address should be used as destination of ASR Manager service in the Management Nodes? Mark for Review Points External shared IP for the Management Cluster 192.168.4.3 192.168.4.4 192.168.4.216 (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Configure ASR Service module and try again. 85. Following is the snapshot of the configuration file of ovca service before registering ASR Manager as a additional managed service. [mgmt_init] [...] foundational_services: ovmm_mysql ovmm tinyproxy xms dhcpd [...] Which location in the "foundational_services" section is correct for the ASR Manager service to be registered? Mark for Review Points As the first service Any location in the service list (*) After tinyproxy service Before tinyproxy service After all existing services [Correct] 86. Corect! Which statements about Automatic Service Request are correct? Points (Choose all correct answers) Mark for Review ASR was initially created by Sun for Sun Hardware. It has been extended to support Oracle Engineered System. (*) The goal of ASR is to help to resolve hardware component failure in customers data center faster. (*) All hardware components in Private Cloud Appliance can be monitored with ASR solution. ASR is an integrated solution which includes hardware design, software services and backend support infrastructure at Oracle. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Configure ASR Service module and try again. 87. Which tasks are required after ASR Manager software is installed on Management Nodes in Private Cloud Appliance? Mark for Review Points (Choose all correct answers) Move configuration and log folder of ASR Manager service to a location in internal ZFS Storage Appliance. (*) Register ASR Manager as a managed service in ovca service. (*) Stop and disable ASR Manager service in both Management Nodes. (*) Start ASR Manager service in both Management Nodes. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Configure ASR Service module and try again. 88. Which statements about configuring ASR services for Private Cloud Appliance are correct? Mark for Review Points (Choose all correct answers) ASR services will be configured mostly by qualified field engineers from Oracle and partners but sometimes even allow customers do the configuration themselves. Configuring ASR services is recommended to be done when Private Cloud Appliance is first time installed for the customers. (*) Configuring ASR services for Private Cloud Appliance includes two steps which are deploying stand-alone ASR Manager in the Management Cluster and activating ASR Assets in PCA. (*) A direct Internet connection is the pre-requisite for configuring ASR services for Private Cloud Appliance. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Configure ASR Service module and try again. 89. Which statements about installing ASR Manager software for Private Cloud Appliance are correct? Mark for Review Points (Choose all correct answers) ASR Manager software package can be available from internal software repository or download from oracle.com. (*) ASR Manager software only needs to be installed on current master Management Node. ASR Manager software will be registered as a system service in Management Node. (*) ASR Manager software is a Java-based solution which requires at least Java Runtime release 7. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Configure ASR Service module and try again. 90. Identify correct pre-requisites that enable sending Service Requests (SRs) from embedded ASR Manager in internal ZFS Storage Appliance to service team at Oracle. Mark for Review Points (Choose all correct answers) A valid System Support Contract and MOS Account for Private Cloud Appliance (*) ASR Manager service in Management Nodes A SMTP daemon in data center is configured as relay for "phone-home" feature in internal ZFS Storage Appliance A Direct Internet Connection from internal ZFS Storage Appliance A light-weight HTTP proxy service (tinyproxy) in Management Nodes (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Configure ASR Service module and try again. 91. A guest VM need to communicate with services outside the PCA System over a defined VLAN. Which network interface can be used as the backend for the vNIC in the guest VM? Mark for Review Points bond4 (*) bond0 bond2 bond3 bond1 [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 92. If you want to manage the Compute Node ovcacn28r1 in a PCA System, which IP address can be used to access ILOM service of the Compute Node? Mark for Review Points 192.168.4.28 192.168.4.128 (*) 192.168.40.28 192.168.140.28 [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 93. Which bonding port in a Compute Node is NOT created over virtual IO devices provisioned from Fabric Interconnect? Mark for Review Points bond3 bond4 bond0 bond2 bond1 (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 94. Which statements about Oracle VM Server Configuration in a PCA System are correct? for Review Mark Points (Choose all correct answers) Virtual CPU and virtual memory in dom0 are pre-configured depending on hardware resources in the Compute Node. (*) Oracle VM Server software is provisioned and configured automatically by firmware. (*) Two disk partitions are created on local hard drive. The smaller one is for installing Oracle VM Server software, the larger one is for creating a local OVM repository. (*) Customers can update Oracle VM Server software with latest Oracle VM Server ISO image from Oracle Support website. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 95. Which statements about Management Cluster in Private Cloud Appliance are correct? for Review Mark Points (Choose all correct answers) All shared files are stored in an OCFS2 file system which is mounted onto both Management Nodes. Management Cluster is setup by using OCFS2 DLM mechanism. (*) Only a single Management Node is active and run management services and cluster virtual IPs. (*) Two Management Nodes are configured with identical services. (*) First Management Node will take over the master role when it rejoins the cluster. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 96. Which file must be modified if a system service in Management Nodes need to be registered as a managed service in the Bootstrap Service? Mark for Review Points /etc/ovca.conf /var/lib/ovca/ovca-system.conf (*) /etc/pca.conf /var/lib/pca/pca-system.conf [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 97. Which network devices in a Management Node are provisioned from Fabric Interconnect? Mark for Review Points (Choose all correct answers) ib0, ib1 eth4, eth4B (*) eth0 eth5, eth5B (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 98. Which statements about Oracle VM Storage Resource Configuration in Private Cloud Appliance are correct? Mark for Review Points (Choose all correct answers) Resource provisioning of the internal ZFS Storage is differentiated by types of server nodes. (*) An iSCSI LUN is provisioned automatically in the internal ZFS Storage when a new Tenant Group is created. (*) All Compute Nodes in a PCA System are automatically provisioned with two repositories when discovered. An active-standby cluster is configured with dual controllers in the internal ZFS Storage. (*) Internal ZFS Storage is registered as an iSCSI Storage. ZFS-specific plugin is used to enable central management from OVM Manager. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 99. Which network interface in storage controllers can be leveraged to access ILOM service of the internal ZFS Storage? Mark for Review Points net2 NETMGMT net1 net0 (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 100. Which statements about IO Clouds and PVI Clouds in Private Cloud Appliance are correct? Mark for Review Points (Choose all correct answers) IO Clouds and PVI Clouds are pre-configured in Private Cloud Appliance. Customers are NOT allowed to make any manual modification. Network Cloud and Storage Cloud are two supported IO Clouds which can be differentiated by type of IO Modules in the definition. (*) Both IO Clouds and PVI Clouds support vNIC and vHBA devices. PVI Clouds are created for defining virtual IO devices in a private fabric. A PVI Cloud must be defined against an IB subnet in a SDN environment. (*) IO Clouds are created for defining virtual IO devices that can connect to external fabrics. Uplinks from IO Modules must be selected in an IO Cloud definition. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 101. Which statements about Oracle VM Server Pool Configuration in Private Cloud Appliance are correct? Mark for Review Points (Choose all correct answers) Every Compute Node will be added into a server pool when discovered by Node Automation Service. A default server pool is pre-configured in a PCA System. Administrators can not delete or rename the default server pool. (*) A server pool is uniquely mapped to a Tenant Group in the PCA System. (*) Server pools and server membership of any server pool can only be managed with PCA Admin CLI tool. (*) PCA System enforces that all Compute Nodes in a server pool must be with same model. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 102. Which IO Module Configuration in Fabric Interconnect are valid in a PCA deployment? for Review Mark Points (Choose all correct answers) Upper F1-15 (2*Quad 10G Ethernet Module), Lower F1-15 (2*Quad 10G Ethernet Module) Upper F1-15 (4*Quad 10G Ethernet Module), Lower F1-15 (4*Quad 10G Ethernet Module) (*) Upper F1-15 (4*Quad 10G Ethernet Module), Lower F1-15 (4*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module) Upper F1-15 (2*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module), Lower F1-15 (2*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module) Upper F1-15 (4*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module), Lower F1-15 (4*Quad 10G Ethernet Module, 2*Dual 8Gb FC Module) (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: System Configuration module and try again. 103. Which statements about the benefits of Oracle's Converged Infrastructure are correct? Mark for Review Points (Choose all correct answers) Built-in system management & orchestration services (*) Single-call support for the whole system (*) Lower initial purchase cost of the system Apply best practice at all levels (*) Reduce deployment time and cost with integrated design (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Introduction 104. Which statements correctly describe the fact of Private Cloud Appliance? Review Mark for Points (Choose all correct answers) Out-of-box private cloud solution with easy Enterprise Manager Cloud Control integration (*) An Oracle Engineered System which implements optimized general-purpose Oracle VM platform (*) Enable Rapid Application Deployment (RAD) with pre-built templates (*) Previously known as Virtual Compute Appliance which has been evolving for generations (*) Fully virtualized system with built-in software defined networking (SDN) for ultimate flexibility (*) [Incorrect] module and try again 105. Sorry, that's not correct. Please review the Oracle Private Cloud : Introduction Which scenario is best fit for Private Cloud Appliance solution? Mark for Review Points Consolidation of ISV or home grown applications running on Linux and Windows (*) Consolidation of multiple mission critical applications that demand highest reliability and extreme performance Consolidation of multiple Oracle Database instances Consolidation of multiple applications deployed on Oracle WebLogic Server 12c [Incorrect] module and try again 106. Sorry, that's not correct. Please review the Oracle Private Cloud : Introduction Which features of Private Cloud Appliance can help to reduce overall cost for customers? Mark for Review Points (Choose all correct answers) System can be upgraded with most recent firmware release (*) Allow to manage all software licenses by virtual cpus allocated to guest VMs Converged infrastructure to reduce cost in integration, management and support (*) Great IO Flexibility with built-in Oracle Virtual Networking solution Can leverage existing external network and storage resources (*) [Incorrect] module and try again 107. Sorry, that's not correct. Please review the Oracle Private Cloud : Introduction Which statements correctly describe that Private Cloud Appliance is an integrated platform? Mark for Review Points (Choose all correct answers) System firmware can be refreshed with a single package from Oracle Support website. (*) Software components are implemented as the system firmware which drives bootstrap and configuration of a PCA System. (*) All system components must be pre-installed at factory and shipped to customer's data center as a single system. Hardware components including Rack, Server, Storage and Switch are selected and configured carefully. (*) [Incorrect] module and try again 108. Sorry, that's not correct. Please review the Oracle Private Cloud : Introduction Which features can help to reduce deployment complexities of Private Cloud Appliance solution? Mark for Review Points (Choose all correct answers) Allow external connectivity to existing network and storage resources One hour from power-on to production (*) Single point of contact for support (*) Ability to grow computing capacity on business demand Offers centralized, productivity tool for management and orchestration (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Introduction 109. You are delivering PCA firmware upgrade services, the CLI # pca-admin update appliance get_image is successfully launched. Which CLI should be executed next? Mark for Review Points (Choose all correct answers) # pca-admin show task (*) # pca-admin backup # pca-admin delete lock all_provisioning (*) # pca-admin update compute-node # pca-admin update appliance install_image (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 110. Which statements about upgrading a PCA System are correct? Mark for Review Points (Choose all correct answers) Upgrading a PCA System will refresh software components in firmware. (*) Built-in tool enables upgrading all software components together in a single step. It is recommended to upgrade a PCA System immediately after initial configuration. (*) There will be little impact to the running guests during the upgrade process. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 111. Which tasks must be performed before upgrading a Compute Node in a PCA System? for Review Mark Points (Choose all correct answers) Execute the CLI: # pca-admin remove server <node name> <tenant group name> from current master Management Node Unpresent all repositories from the Compute Node Backup OS configuration of dom0 in the Compute Node (*) Migrate all running guests to other Compute Nodes (*) Configure a YUM repository by administrators [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 112. Which statements about upgrading firmware for a PCA System are correct? Review Mark for Points (Choose all correct answers) Management activities will be prohibited when firmware upgrade task is running. (*) After firmware patch is uploaded into a Management Node, it is extracted into software repository in the internal ZFS Storage. (*) For the Management Cluster, current master node will be upgraded first then current backup node. Firmware upgrade will refresh management services in the management cluster and sometimes firmware of system components. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 113. Which tasks must be performed after a Compute Node in a PCA System is upgraded? for Review Points (Choose all correct answers) Present repositories previously assigned to the Compute Node Migrate unassigned guest VMs to the Compute Node (*) Perform health check of the Compute Node (*) Clear maintenance mode of the Compute Node (*) Execute the CLI: # pca-admin add server <node name> <tenant group name> Mark [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 114. When delivering PCA firmware upgrade services for a customer, after executing the CLI # pcaadmin update appliance install_image, you notice that the current master Management Node is rebooted automatically. What can be implied from this phenomenon? Mark for Review Points (Choose all correct answers) The current backup Management Node has been updated successfully. (*) The current backup Management Node is now the new master Management Node. (*) The current master Management Node will boot from network device net0. (*) The current master Management Node will retake the master role after the upgrade completes successfully. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 115. A Compute Node in an Expansion Rack can not boot properly after upgrade. An OS reprovisioning has to be done to restore the server. Which tasks must be performed to put the server back to work? Mark for Review Points (Choose all correct answers) Present repositories previously assigned to the Compute Node (*) Restore previous customization, including virtual IO devices and OS tuning, for dom0 of the Compute Node (*) Migrate some running guest VMs to the Compute Node Clear maintenance mode of the Compute Node Execute the CLI: # pca-admin add server <node name> <tenant group name> (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 116. Which statements about firmware patches for Private Cloud Appliance are correct? for Review Mark Points (Choose all correct answers) Firmware patches must be uploaded into an external HTTP or FTP site that can be accessed from Management Nodes directly. Customers can download firmware patches from Oracle Support website after signing the PCA System Support contract. (*) Firmware patches need to be downloaded for a PCA System is firmware dependent. (*) Firmware patches will be released in a single ISO file. All new software components for Private Cloud Appliance will be included. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 117. Which guidelines should be followed when performing Compute Nodes upgrade for a PCA System? Mark for Review Points (Choose all correct answers) Upgrade only a single Compute Node in a server pool at any time (*) Only upgrade Compute Nodes in a PCA System when firmware upgrade is done (*) Put Compute Node back to work after it is successfully upgraded (*) Backup configuration and running Guest VMs on a Compute Node before upgrade Upgrade a Compute Node immediately after it is added into a PCA System [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Upgrade module and try again. 118. Which CLIs can be leveraged to check current firmware release of a PCA System? for Review Points (Choose all correct answers) # cat /etc/redhat-release # /usr/sbin/pca-diag version (*) # /usr/sbin/pca-admin show version (*) # /usr/sbin/pca-admin diagnose software Mark [Correct] Corect! Private Cloud Appliance Management Tools (Answer all questions in this section) 119. Which statements about System Diagnostic for Private Cloud Appliance are correct? for Review Mark Points (Choose all correct answers) Both stand-alone Appliance Diagnostic tool and Health Check function in PCA Admin CLI can be leveraged. (*) System Diagnostics for Private Cloud Appliance are used for troubleshooting and support purposes. (*) Stand-alone Appliance Diagnostic tool will collect diagnostics data from Private Cloud Appliance. (*) Both stand-alone diagnostic tool and Health Check function in PCA Admin CLI will generate report as files that can be sent to Oracle Support Engineers for troubleshooting. Health Check function in PCA Admin CLI will run test against various aspects in Private Cloud Appliance. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 120. Which URLs are valid management service endpoints of Oracle VM Manager in a Private Cloud Appliance deployment which external IP for the Management Cluster is 10.11.2.116? Mark for Review Points (Choose all correct answers) ssh://10.11.2.116 https://192.168.4.216:7002/ovm/console (*) https://10.11.2.116:7002/core/ovm/soap (*) https://10.11.2.116:7002/dashboard [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 121. Which statements about Managed Objects in Oracle VM Manager are correct? Review Mark for Points (Choose all correct answers) All management and monitoring functions in Oracle VM Manager are implemented based on objects. (*) Oracle VM Manager defines all manageable targets as objects. Different object types have special attributes and operations. (*) Each object is uniquely identified by an internal ID in Oracle VM Manager. Also a human readable name can be assigned for each object. (*) All objects including metadata are stored centrally in Oracle VM Manager Repository. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 122. When performing backup for Private Cloud Appliance, you can leverage following CLIs: # pca-admin list task # pca-admin show task # pca-admin list config-error # pca-admin rerun config-task # pca-admin delete config-error # pca-admin backup which CLI sequences will possibly lead to a confirmed successful backup? Points (Choose all correct answers) 6,1,6,2 (*) Mark for Review 6,2,3,5 6,2 (*) 6,2,3,4,1,5 6,1,3,4,5 (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 123. You are installing Private Cloud Appliance for one of your customers. During installation a Compute Node (ovcacn08r1) shown in the Dashboard UI has never been successfully discovered by the OVM Manager. Choose the CLIs to find possible reasons and to fix the issue in case of whole server need to be replaced. # pca-admin diag software # pca-admin show compute-node ovcacn08r1 # pca-diag vmpinfo servers='ovcacn08r1' # pca-node-db delete name=ovcacn08r1 5. # pca-admin reprovision compute-node ovcacn08r1" Mark for Review Points 2,3,5 1,2,4 2,3,4 (*) 1,2,3,4,5 [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 124. Which statements about object-based management and monitoring in Oracle VM Manager are correct? Mark for Review Points (Choose all correct answers) All management tasks in Oracle VM Manager must be wrapped as jobs. A single job can group multiple management actions. (*) An event can be recorded by Oracle VM Manager when state of an object is changed. The severity will be used to mark the importance of the event. (*) A job defines transaction boundary for all contained actions. The state of job can indicate running or completion status of the job. (*) Objects in Oracle VM Manager can be monitored based on event or performance. (*) Performance monitoring is only available for Oracle VM Server object. You can define rules to determine health status for Oracle VM deployment. [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 125. Which statements about PCA Management CLIs are correct? Mark for Review Points (Choose all correct answers) PCA Admin CLI can run on both Management Nodes with identical functions. PCA Admin CLI provides more comprehensive management functions than those available in Dashboard UI. (*) Administrators can execute a single management command in Linux shell or multiple management commands in an interactive session with PCA Admin CLI. (*) PCA Management CLIs are firmware release dependent. Since firmware release 2.1.1, most previous single-function tools are consolidated into PCA Admin CLI tool. (*) PCA Management CLIs are collection of scripts deployed on both Management Nodes. Those scripts implement system management capabilities for Private Cloud Appliance. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 126. Which CLI can be used if you want to see detail information of the Compute Node (ovcacn30r1) in Private Cloud Appliance? Mark for Review Points # pca-admin list compute-node --filter-column "Compute_Node" --filter "ovcacn30r1" # pca-admin show compute-node ovcacn30r1 (*) # pca-admin list compute-node ovcacn30r1 # pca-admin show compute-node --filter-column "Compute_Node" --filter "ovcacn30r1" [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 127. In case you want to create a new VM network (myNetwork_s5p2) for all configured Compute Nodes by leveraging unused port 2 on Ethernet Modules at slot 5, which of the following CLIs combined can help you to implement the task? Mark for Review Points (Choose all correct answers) # pca-admin add-network myNetwork_s5p2 external_network '5:2' # pca-admin add-network myNetwork_s5p2 <node name> (*) # pca-admin create-network myNetwork_s5p2 <node name> # pca-admin list compute-node (*) # pca-admin create-network myNetwork_s5p2 external_network '5:2' (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. 128. Which statements about OVM Manager CLI in Private Cloud Appliance are correct? for Review Mark Points (Choose all correct answers) OVM Manager CLI can work seamlessly with OVM Manager UI because they both run on same core services. (*) OVM Manager CLI implements a customized interactive shell and need to install a special client on administrators' workstation. OVM Manager CLI is a bundled management service in Oracle VM Manager so that Oracle will provide official support. (*) OVM Manager CLI service can be customized to enable password and key based authentication. (*) [Incorrect] Sorry, that's not correct. Please review the Oracle Private Cloud Appliance: Management Tools module and try again. Private Cloud Appliance Architecture (Answer all questions in this section) 129. Which components are building blocks of Oracle Fabric Interconnect? Mark for Review Points (Choose all correct answers) Management Module (*) Fabric Board (*) Network Express Module IO Module (*) Mid-plane (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 130. Which statements about dom0 in Oracle VM Server for x86 are correct? Mark for Review Points (Choose all correct answers) Dom0 has privileges to control all physical resources from bare-metal server. Dom0 is a customized Oracle Linux instance. (*) Oracle VM Agent daemon running inside Dom0 enables centralized management from Oracle VM Manager. (*) Dom0 implements management services that control virtual resources and life-cycle of all guest domains (domUs). (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 131. Which statements about Fabric Interconnect in Oracle Virtual Networking Solution are correct? Mark for Review Points (Choose all correct answers) Mid-plane connects all components in Fabric Interconnect together through built-in connectors and grids. (*) Management Module enables external management from CLI or Fabric Manager. (*) Fabric Board in Fabric Interconnect provides IB switching capability for connected server nodes and configured IO Modules. (*) Fabric Interconnect is core of Oracle Virtual Networking solution. One or more such devices form Oracle SDN Environment. (*) IO Modules have uplinks which can be used to enable external connectivity. Customers can order any type of IO Module at any time. [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 132. Which statements about Oracle VM Server for x86 in a PCA System are correct? Mark for Review Points (Choose all correct answers) Oracle VM Server for x86 is deployed in all server nodes in a PCA System. Oracle VM Server for x86 is rooted from open-source Xen community. (*) DomUs in Oracle VM Server for x86 are domains running real workload for customers. (*) Dom0 in Oracle VM Server for x86 is a special domain installed and launched with the hypervisor. (*) Hypervisor in Oracle VM Server for x86 virtualizes critical resources including CPU, Memory and IO for all domains. [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 133. Which network interfaces in system components are used to enable integrated management architecture of a PCA System? Mark for Review Points (Choose all correct answers) ib0, ib1 in Storage Controllers SERIAL MGMT in Fabric Interconnect NETMGT in Rack PDUs (*) ib0, ib1 in Compute Nodes (*) net0 in Management Nodes (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 134. Which statements about server node deployment in a PCA System are correct? Mark for Review Points (Choose all correct answers) All Compute Nodes inside same rack must be configured with identical model. Customers can expand memory capacity of a Compute Node with Memory Upgrade Kits. (*) Management Nodes are pre-installed at factory, however all Compute Nodes can be installed at customer's site. Dual Management Nodes are identically configured in Base Rack to deploy management services in firmware. (*) Compute Nodes can be deployed in any rack to provide pooling virtual resources for guest domains. (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 135. Which statements about management tools in PCA system firmware are correct? for Review Mark Points (Choose all correct answers) Management tools are deployed in both Management Nodes, however can only be executed from current active Management Node. Common libraries and configuration databases are implemented for management tools. (*) Management tools consume all management services on each system component via the Ethernetbased internal management fabric. Management tools are designed to manage Private Cloud Appliance as an integrated platform. (*) Web-based and CLI-based tools are available, both provide identical functions. [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 136. Which statements about Software-Defined IO Device feature in Oracle Virtual Networking solution are correct? Mark for Review Points (Choose all correct answers) Two backend implementations are supported in Fabric Interconnect. Both implementations support vNIC and vHBA devices. Frontend of virtual IO device instances are powered by a special kernel driver in a supported OS. (*) Backend of virtual IO device instances are implemented in Fabric Interconnect. (*) Software-Defined IO Device implementations in Oracle Virtual Networking use a split-device model. (*) Communications between frontend and backend of a virtual IO device are wrapped inside IB packets. (*) [Incorrect] module and try again 137. Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture Which statements about system racks in a PCA System are correct? Mark for Review Points (Choose all correct answers) All racks in a PCA System use uniform Sun Rack II 1242 cabinet. However customers can choose among different PDU options for their needs. (*) Base Rack is always required in a PCA system to deploy critical system components. (*) Power cords and network cables are pre-loaded for those populated nodes only. Expansion Racks are optional to add more computing and storage capacity to an existing PCA system. All system components are installed at fixed position, and unpopulated RUs are installed with fillerpanels. (*) [Incorrect] module and try again 138. Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture Which statements about data fabric in a PCA System are correct? Mark for Review Points (Choose all correct answers) Uplinks from InfiniBand Switches in each Expansion Rack are reserved to maximize throughput. (*) InfiniBand Switches in each Expansion Rack need to connect with InfiniBand Switches in Base Rack to extend the fabric. The fabric is configured with end-to-end fully-redundant topology. (*) Server and Storage nodes in each rack connect to InfiniBand Switches in same rack. (*) The fabric enables communications between Server and Storage nodes. (*) [Incorrect] module and try again 139. Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture Which statements about internal storage in a PCA System are correct? Mark for Review Points (Choose all correct answers) The storage inside Private Cloud Appliance can attach disk enclosures in Expansion Racks to expand storage capacity. The storage inside Private Cloud Appliance is a customized ZFS Storage Appliance for Oracle Engineered Systems. (*) The storage inside Private Cloud Appliance is fully-redundant for high reliability. (*) The storage inside Private Cloud Appliance is used as the "system" disk and not recommended for storing guest VM's data. (*) The storage inside Private Cloud Appliance can provide data services via both 10G Ethernet and QDR InfiniBand interfaces. [Correct] Correct! 140. Which statements about Virtualization Runtime in a PCA System are correct? Review Mark for Points (Choose all correct answers) All virtualization solutions are configured automatically by system firmware. (*) Virtualization Runtime can be managed with PCA Admin CLI tool in firmware. (*) Virtualization Runtime contains Server Virtualization, Network Virtualization and Storage Virtualization solutions. Virtualization Runtime in Private Cloud Appliance will provision virtual resources directly to Guest VMs. [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 141. Which statements about Oracle VM Manager in Oracle VM solution are correct? Mark for Review Points (Choose all correct answers) Management Server in Oracle VM Manager implements core management logic and various management services. (*) Oracle VM Manager Repository in Oracle VM Manager uses a MySQL DB instance deployed either locally or remotely. Oracle VM Manager is a JavaEE-based application solution that can be used to manage one or more server pools. (*) Management Server in Oracle VM Manager is deployed in an Oracle WebLogic Server instance. (*) Oracle VM Manager Repository in Oracle VM Manager stores metadata of objects in Management Server. (*) [Incorrect] module and try again 142. Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture Which statements about Node Automation Service in Private Cloud Appliance are correct? Mark for Review Points (Choose all correct answers) A set of utilities in Management Nodes will be leveraged to configure Compute Nodes. (*) Node DB is a central repository to store state and other information of discovered Compute Nodes. (*) After a Compute Node is powered on, it can be discovered, provisioned and configured automatically by Node Automation Service. Node Automation Service is a group of customized system services that interact with Compute Nodes to implement automation. (*) Node Manager is a component created to drive the automation process based on defined State Machine for Compute Nodes. (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 143. Which statements about Software-Defined Fabric feature in Oracle Virtual Networking solution are correct? Mark for Review Points (Choose all correct answers) External switches in customers data center can help to route network traffic across multiple PVIs. A PVI creates a software domain which isolates network configuration and switching. (*) Software-Defined Fabric is ideal for cloud deployment with the isolation nature. (*) Software-Defined Fabric, aka. Private Interconnect (PVI), is based on the virtual IO device implementation that terminates in a Fabric Board. (*) PVI implementation does not use any existing network protocol like VxLAN so that can simplify network planning. (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture 144. Which statements about switch node deployment in a PCA System are correct? Mark for Review Points (Choose all correct answers) Network connections to components inside same rack are pre-cabled at factory. (*) All Switch Nodes are installed at the top of each rack for optimized cabling and easy maintenance. Three types of Switch Nodes, Ethernet, IB and Fabric Interconnect, are configured in Private Cloud Appliance. (*) Switch Nodes are configured identically in all racks of a PCA System. All Switch Nodes are configured in pair to improve reliability. (*) [Incorrect] module and try again 145. Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture Which statements about management & provisioning fabric in a PCA System are correct? Mark for Review Points (Choose all correct answers) The fabric enables automatic discovery, provisioning and configuration for Compute Nodes. (*) Ethernet Switches in each Expansion Rack need to connect with Ethernet Switches in Base Rack directly to extend the fabric. (*) The fabric allows to manage and monitor all system components from bare-metal. (*) Dual Ethernet Switches in each rack are interconnected to build a single fully-redundant switch. Forward and Reverse Supply Chain [Incorrect] module and try again 146. Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture Which statements about System Bootstrap Service in Private Cloud Appliance are correct? Mark for Review Points (Choose all correct answers) System Bootstrap Service is installed and configured in both Management Nodes at factory. System Bootstrap Service is implemented as a system service in Management Nodes. (*) System Bootstrap Service will setup Management Cluster with discovered system resources at initial power on. (*) System Bootstrap Service will start Management Nodes automatically. Administrator has to power on Compute Nodes manually. System Bootstrap Service will launch required system services at every power on. (*) [Incorrect] module and try again Sorry, that's not correct. Please review the Oracle Private Cloud : Architecture