Organisational Structure
& Professional
Consultants
Module 1
ORGANISATIONAL STRUCTURE AND
CONSULTANTS
LEARNING OUTCOMES
AT THE END OF THE LECTURE THE STUDENT MUST BE ABLE TO:
1. DESCRIBE AND DISCUSS THE ROLE PLAYERS IN THE CONSTRUCTION
INDUSTRY AND THEIR CONTRIBUTION
2. DESCRIBE AND EXPLAIN THE DESIGN TEAM W.R.T.
1. THE EMPLOYER
2. THE ARCHITECT
3. THE SURVEYOR
4. TOWN PLANNER
5. ENGINEERS ( STRUCTURAL CIVIL, MECHANICAL, ELECTRICAL, GEOTECHNICAL
6. QUANTITY SURVEYOR
7. BUILDING CONTROL OFFICER
BUILDING PROJECT ROLE PLAYERS
1. THE EMPLOYER / CLIENT
2. THE ARCHITECT
3. THE STRUCTURAL ENGINEER
4. THE STRUCTURAL SURVEYOR
5. MECHANICAL ENGINEER
6. ELECTRICAL ENGINEER
7. RESIDENT ENGINEER
8. CLERK OF WORKS
9. GEOTECHNICAL ENGINEER
10. QUANTITY SURVEYOR
11. CONTRACTOR AND SUB CONTRACTOR
12. LOCAL AUTHORITY/ MUNICIPAL BUILDING INSPECTOR
THE EMPLOYER / CLIENT
1. REFERS TO AN ORGANISATION OR INDIVIDUAL WHO DESIRES TO HAVE A
BUILDING ERECTED ( BUILT)
2. ASSUMES OWNERSHIP OF THE BUILDING UPON COMPLETION
DUTIES AND RESPONSIBILITIES
1. PAYMENT OF FEES TO THE DESIGN TEAM AND THE BUILDING FIRM
(CONTRACTOR)
2. LEGAL RESPONSIBILITIES IN CONSULTATION WITH PROPERTY LAWYERSPURCHASING OF LAND, TRANSFER OF OWNERSHIP, ENVIRONMENTAL ISSUES ETC
3. APPOINTING THE ARCHITECT AND THE CONSULTING TEAM
4. PROVIDING THE SCOPE OF WORK ( THE REQUIREMENTS) TO THE ARCHITECT.
THE SCOPE SHOULD INCLUDE:
1.
2.
3.
4.
LOCATION OF A SUITABLE SITE
SPACE REQUIREMENTS AND POSITION ON SITE
BUDGET
TIME LINES FOR DESIGN AND CONSTRUCTION
THE ARCHITECT
1. REFERS TO A PROFESSIONAL WHO CREATES
AN ARTISTIC IMPRESSION OF THE PROPOSED
BUILDING PROJECT TAKING INTO ACCOUNT
BOTH
AESTHETIC
AND
FUNCTIONAL
REQUIREMENTS
2. ASSUMES THE ROLE OF PROJECT TEAM COORDINATOR AND EMPLOYER AGENT
DUTIES AND RESPONSIBILITIES
1. PRODUCING
FULL
SET
OF
BUILDING
DOCUMENTS ( PLANS, ELEVATIONS, DETAILS
SECTIONS, MODEL)
2. MANAGING
THE
DESIGN
TEAM
OF
CONSULTING
ENGINEERS
AND
THE
CONTRACTOR.
ACT AS AN ARBITRATOR AND ENSURES THAT
QUIRIES & DISPUTES ARE SETTLED IN
ACCORDANCE TO TERM OF THE CONTRACT
THE ARCHITECT _ continued
PRE- CONTRACT DUTIES ( CONSTRUCTION STAGE)
1.
2.
3.
4.
5.
6.
APPOINTMENT
SELECTION OF CONSULTANTS- RECOMMENDING THE OF APPOINTING
CONSULTING ENGINEERS AND THE QUANTITY SURVEYOR
DESIGN BRIEF –
PREPARATION AND COLLECTION OF TENDER DOCUMENTS
CALLING FOR TENDERS
FINAL CONTRACT DOCUMENTS
CONTRACT PERIOD DUTIES
1.
2.
3.
4.
5.
6.
7.
SUPERVISOR – TAKES RESPONSIBILITY OF THE CONTRACT UNDER HIS
DIRECTION
DISPUTE RESOLUTION – ARBITRATION
SUB-CONTRACTS – APPOINTS NOMINATED
SUB-CONTRACTORS/
SUPPLIERS FOR SPECIALISED WORK
CHANGES- ISSUES VARIATION ORDERS
PAYMENTS- ISSUES INTERIM PAYMENT CERTIFICATES AND CONTRACTORS
ARE PAID ACCORDING TO THE VALUE OF WORK MEASURED BY THE QS
PROGRESS REPORT
SITE MEETINGS- CHAIRS REGULAR SITE MEETINGS TO COORDINATE SITE
WORK
THE ARCHITECT _ continued
POST- CONTRACT DUTIES ( COMPLETION)
1. PROJECT HAND OVER TO CLIENT
2. COMPILING THE SNAG LIST
3. ISSUING CERTIFICATE OF COMPLETION
4. ISSUING THE FINAL CERTIFICATE – ENSURES THAT THE CONTRACTOR IS
PAID ALL OUTSTANDING
THE LAND SURVEYOR & TOWN PLANNER
THE LAND SURVEYOR
1. ENGAGED EARLY DURING THE PRECONTRACT STAGE AND WILL BE
RESPONSIBLE FOR PRODUCING SITE
MAPS AND TOPOGRAPHICAL MAPS
THE TOWN PLANNER
1. IS RESPONSIBLE FOR DEVELOPING
LAYOUT PLANS FOR TOWNS AND
SUBURBS
2. IS CONSULTED TO GIVE ADVISE ON
AESTHETIC GUIDELINES TO WHAT IS
ALLOWED IN A PARTICULAR AREA
CONSULTING
ENGINEERS
1.
THEY ARE RESPONSIBLE FOR DESIGNING “BUILDING SERVICES”
AND ENSURE THE SAFETY OF A BUILDING
2. THEY ARE RESPONSIBLE FOR DESIGNING THE FOLLOWING
1.
2.
3.
4.
5.
THE POWER AND LIGHTING LAYOUT (ELECTRICAL ENGINEERS)
SANITARY PLUMBING (HOT AND COLD WATER SUPPLY),
DRAINAGE, HVAC, FIRE SUPPRESSION SYSTEM, ESCALATORS,
ELEVATORS ( MECHANICAL ENGINEERS)
LOADS ON THE BUILDING AND THE DESIGN OF BEAMS,
COLUMNS, TRUSSES, FRAMES ( WIND, DEAD LIVE LOADS ETC)
(STRUCTURAL ENGINEERS)
FOUNDATIONS AND BUILDING SUPPORT ( GEOTECHNICAL
ENGINEER)
REINFORCED CONCRETE, ROADS, WATER SUPPLY
TO THE
PROPERTY AND DRAINAGE OFF THE SITE ( CIVIL ENGINEER)
THEY DESIGN THE ABOVE STATED BUILDING SERVICES AND IN THE
PROCESS CARRY OUT CALCULATIONS , AND PRODUCE DRAWINGS
FOR CONSTRUCTION
THEY TAKE RESPONSIBILITY OF THEIR DESIGNS ( BOUND BY CODE
OF PRACTICE)
THE QUANTITY SURVEYOR
1. IS A PROFESSIONAL RESPONSIBLE FOR PROJECT FINICAL
MATTERS (CONSTRUCTION ACCOUNTANT)
2. THEY ARE RESPONSIBLE FOR ESTABLISHING CONSTRUCTION
COST BASED ON ARCHITECTURAL PLANS AND CONSTRUCTION
DRAWINGS ISSUED BY CONSULTING ENGINEERS
3. IS KNOWLEDGEABLE ABOUT CONSTRUCTION METHODS AND
MATERIALS AND THEREFORE CAN GIVE GUIDANCE ON COST
SAVING
4. QS DUTIES CAN BE DIVIDED INTO
1. PRE-CONTRACT DUTIES
2. CONTRACT DUTIES
3. POST CONTRACT DUTIES
THE QUANTITY SURVEYOR _ CONTINUED
PRE-CONTRACT STAGE (DESIGN STAGE)
1. PREPARE ESTIMATES(B.O.Q) FROM ARCHITECT’S SKETCHES
2. ADVISES THE EMPLOYER ON WAYS TO SAVE COST BASED ON
THE EMPLOYERS BUDGET
3. CONSOLIDATES THE B.O.Q FROM CONSULTING ENGINEERS
WITH HIS ESTIMATES AND ISSUES BLANK B.O.Q TO THE
ARCHITECT TO BE USED BY BIDDERS FOR TENDERING
PURPOSES
4. PERFORMS ARITHMETIC CHECKS ON THE SUBMITTED BIDS
THE QUANTITY SURVEYOR _ CONTINUED
CONTRACT STAGE (CONSTRUCTION STAGE)
• PERFORMS MONTHLY VALUATIONS WHICH FORMS THE BASIS FOR
ISSUING INTERIM PAYMENT CERTIFICATE
•
RESPONSIBLE FOR COST CONTROL (WARNS THE CLIENT AND
ARCHITECT OF ANY BUDGET VARIATIONS)
•
MEASUREMENT OF VARIATION ORDERS TO DETERMINE THE COST OF
VARIATIONS TO BE INCLUDED IN THE FINAL ACCOUNT
THE QUANTITY SURVEYOR _ CONTINUED
POST-CONTRACT STAGE (COMPLETION OF WORKS)
• PREPARATION OF THE FINAL ACCOUNT WHICH INCLUDES
VARIATIONS MEASURED AS DAYS WORK
• THE TOTAL FINAL ACCOUNT WILL BE THE OUTSTANDING
AMOUNT LESS PREVIOUS INTERIM PAYMENTS
• THE FINAL ACCOUNT ISSUED BY THE QS ENABLES THE
ARCHITECH TO ISSUE THE FINAL CERTIFICATE
FINAL
PAYMENT TO THE CONTRACTOR
THE BUILDING INSPECTOR
REFERS TO A MUNICIPAL REPRESENTATIVE WHOSE ROLE IS INSPECT A BUILDING
FOR COMPLIANCE WITH LOCAL AND NATIONAL BUILDING REGULATIONS
1.
2.
HAS DUAL OBLIGATION TO PROMOTE PUBLIC INTEREST ON SAFETY AND ALSO
SAFEGUARDING THE INTERESTS OF THE EMPLOYER ( ensuring quality standards
are maintained)
INSPECTS THE BUILDING AT VARIOUS STAGES AND SIGNS OFF, AUTHORISING
THE CONTRACTOR TO CONTINUE WITH THE PROJECT
THE CLERK OF WORKS
1.
2.
3.
4.
5.
6.
7.
8.
9.
IS A REPRESENTATIVE OF THE EMPLOYER AND THE ARCHITECT ON SITE AND
APPOINTED BY THE EMPLOYER
ACTS AS LIAISON BETWEEN THE EMPLOYER, ARCHITECT AND THE CONTRACTORS
USUALLY KNOWLEDGEABLE ABOUT CONSTRUCTION, BUILDING REGULATIONS AND
CONTRACT DOCUMENTS.
IS RESPONSIBLE FOR PERFORMANCE TERMS OF CONTRACT ON SITE AND ENSURE
GOOD WORKMANSHIP ( QUALITY CONTROLLER)
ASSIST THE CONTRACTOR IN THE INTERPRETATION OF CONTRACTS,
SPECIFICATIONS , DRG’S AND B.O.Q’S
KEEPS RECORD OF ALL DEVIATIONS FROM CONTRACT DOCUMENTS
MAINTAINS A DAY-TO-DAY DIARY AND AN INSTRUCTION BOOK
SUBMITS TO THE ARCHITECT WEEKLY REPORTS ON PROGRESS OF WORK,
MATERIALS, CONDITION OF PLANT & EQUIPMENT ETC.
ATTENDS SITE MEETINGS AND TAKES MINUTES, BUT ALSO CHAIRS SITE MEETINGS
OF THE ARCHITECT IS NOT AVAILABLE.