Table 27 Spectacle blinds greater than 23 kg (50 lbs) ASME Class rating Size 150 DN 300 (NPS 12) and larger 300 DN 250 (NPS 10) and larger 600 DN 200 (NPS 8) and larger 900 DN 200 (NPS 8) and larger 1500 DN 150 (NPS 6) and larger 2500 DN 150 (NPS 6) and larger Spades weighing more than 23 kg (50 lbs) are shown in Table 28. Table 28 lb) Spades heavier than 23 kg (50 ASME Class rating Size 150 DN 350 (NPS 14) and larger 300 DN 300 (NPS 12) and larger 600 DN 250 (NPS 10) and larger 900 DN 200 (NPS 8) and larger 1500 DN 200 (NPS 8) and larger 2500 DN 150 (NPS 6) and larger As part of IM awareness session; some of the members have raised the concern on Date format to be used for project deliverables, including dwgs and documents. Some discipline are using DD-MM- YY and some are using DD-MM-YYYY; as per SP-2065 latest revision DD-MM-YYYY needs to be followed strictly in order to avoid any rejection during final submission. Separator Gas outlet line ultrosonic flow meter shall be kept at higher elevation (as per SOW) and 20D US and 7D DS shall be maintained as per mail from C&A and as per PR-1304 EMF straight length shall be optimized to 5D and 3D No straight length is required for CMF(Coriolis Mass Flow meter). 1) Maintain minimum 230 mm clearance for drain tapings ( bottom of flange to Grade). 2) Follow bare pipe support span for personal protection lines. 3) Walkways on packaged units or on vessel access platforms-700 mm (minimum). 4) Walkways other than on packaged units or vessel access platforms - 900 mm . 5) Head room clearance 2.1m 6) 460mm: Maximum horizontal reach distance (Shoulder center to vertical axis of valve stem/lever, Shoulder to front of valve handle). 7) Insulation thick ( personal protection) up to 8" 50mm thick 10" and above 100mm thick 8) PI PT , PG connection size- follow as per Piping spec. 9) PI PT , PG connection size - located on Pig trap and Pipeline -2” (follow as per PEFS). 10) PI PT connections- Use mono flange slim line DBB for 900# (Piping,Pigtrap and pipeline) , Use mono flange slim line SBB for 600# (Piping,Pigtrap and pipeline) , 11) TI connections – follow as per Piping spec. 12) Without insulation- Minimum distance between flange to Pipe /Pipe to Pipe – 75mm 13) With insulation- Minimum distance between flange to Pipe /Pipe to Pipe – 30mm 14) Use only welded shoes, don’t use clamped shoes. 15) Non slope lines- Use bearing plate for DSS lines and Simple rest for CS lines ( No bearing plate). 16) Non slope lines- use wear plate for CS, DSS & SS lines Axial stop locations. 17) Slope lines- CS lines- shoes without wear plate. 18) Slope lines- DSS/SS lines- shoes with wear pate. 19) Shoe height – we use 100mm height & 150mm height , please discuss while modelling. We have had a lesson learnt for the painting code requirement for valves coming under insulation. This is specifically applicable to PDO projects. But should be verified on other Contracts against other Client’s standards. The painting code for lines with insulation maybe different from the lines without insulation. Refer to SP-1246 for the same. Pl. note that for lines having wire-mesh type of personnel protection, the painting code will be considering uninsulated piping. If in doubt, ensure that the same is clarified with the Material and Corrosion personnel on the project. Accordingly ensure the below : 1. In the MTOs valves which are coming with insulation needs to be identified and the correct painiting code to be provided so that it is addressed in the PO and further checked during Vendor Document Review 2. The correct painting codes are identified in the linelist – for insulated/ traced lines 3. The correct painiting code is reflected in the isometrics. All DP type level transmitters- There is no scope for piping in the vent drain (Piping won't model and won’t take MTOs into consideration). LG – We are considering ¾" vent and drain in accordance with the piping specification, as confirmed by the process (this vent and drains are Piping scope). THERMOWELL CONNECTIONS 1. Flanged thermowells shall be designed in accordance with the following options: a. For run pipe DN 80 (NPS 3) and larger and shall be selected from Table 4: Table 4 Thermowell sizing ASME class ratings Schedule Thermowell size Standard Drawing 150-1500 160 and below DN 40 (NPS 1 ½) S 38.113 150-1500 XXS and above DN 50 (NPS 2) S 38.114 2500 DN 50 (NPS 2) S 38.114 RIEC Team MECPL Team Focal Point Lead Engineer Designer Piping Esakkiraj / Nikhil Ashok Santhosh Ramachandran Saravan C&A Muruganandham Vivek Sivaraj Balaji Kesavan Civil Arul / Loganathan Palani Bharaneedhar Loguprabhu Dept Electrical Muthukumaraswamy Balamurugan Project Vinod Kumar Uthayasankar Kalimuthu Process Masoud Pakizeh / Krishnamurthy Subburam keep Minimum 230mm vertical clearance between low point drain flange & soil Vertical clearance BOP 6M - Main road & railway 4M - Crane, Truck access 2.7M - Fork lift acccess 2.1M - Walkway, on Platform - The requirement of Insulating gaskets on Test Separator nozzles to be re-checked. As per latest KAIZEN PEFS (by RIEC), insulating gaskets are provided however Today forum was of the opinion that insulating gaskets are not required considering that the vessel is internally cladded. Re-confirm the requirement of Insulating gaskets with Material Team. - For size 8” (600#), RIEC is using spade / spacer; however this is challenged in today model review and proposed to go with spectacle blind. DES31 can be approached for more details. Same to be checked for 900# as well. - It is required to eliminate pocket/dead leg in the sample take off (oil and water) at the inlet to sample cabinet. - As per UEFM1, low capacity IA package capacity shall have horizontal IA receiver (not vertical). Check IA receiver arrangement in RMS Package 31 and 32 on piping drawings. - In Package 34, provision valve (SBB) to/from MWTU shall comply with the requirement of SPE/DPE. Valve tags are 34-VBL-00018/00020. - Maintain 10D upstream Test Separator inlet nozzle inline with the below Figure 21 from DEP informative (DEP 31.22.05.12-Gen). Note 2 in PEFS to be revised (PEFS: STD-31-104526PX-2365-00002-0001 / STD-32-104526-PX-2365-00002-0001) Energy institute guideline need to follow(bracing and other need to do) ; span will not work; when rhov square valve for mix phase more than 10k For gas single phase 50k Unit 31 ID - 1300 OD - 1422 Vess THK. 61 Insu - 50 Nozzle Projection 2" - 900# 911 3" - 900# 911 4" - 900# 936 8" - 900# 986 24"-900# 1131 Unit 32 ID - 1300 OD - 1378 Vess THK. 39 Insu - 50 Nozzle Projection 2" - 600# 864 3" - 600# 864 4" - 600# 936 8" - 600# 986 8" - 600# 1109 Mono flange ball type for PG and Slimline Mono flange for Pressure instruments (PI, PIS, PDI).