MCG MEP DEP. MECH SECTION MENTOR .CONSULTING GROUP. ABO-HOMOS Hospital Pressurization Unit Calculations أﺑﻮ ﺣﻤﺺ وع ﻣﺴ ﺸ ﻣ PIPE TAKE OFF HVAC‐HVAC PIPE TAKE OFF Supply , install , flushing and testing of ERW pipes schedule 40 , comply with ASTM A 53 for external piping works complete with fitting , joints , connection , network valves and accessoris , sleeves , expansion joint , supports , Identifications , painting, and including all items mentioned in Drawings , specifications and method of measurments . ITEM Size (mm) Length (m) Safety (%) Total Length (m) Chilled Water (Black Steel) Pipe Diameter 3/4'' Pipe Diameter 1'' Pipe Diameter 1 1/4'' Pipe Diameter 1 1/2'' Pipe Diameter 2'' Pipe Diameter 2 1/2'' Pipe Diameter 3'' Pipe Diameter 4'' Pipe Diameter 6'' Pipe Diameter 8'' Pipe Diameter 10'' Pipe Diameter 12'' Pipe Diameter 18'' Pipe Diameter 20'' ø20 ø25 ø32 ø40 ø50 ø65 ø80 ø100 ø150 ø200 ø250 ø300 ø450 ø500 1286.62 1542.28 927.53 725.18 814.17 489.45 672.50 468.39 248.41 59.76 245 20 100 118 20 20 20 20 20 20 20 20 20 20 20 20 20 20 1544 1851 1113 870 977 587 807 562 298 72 294 25 120 140 ø150 ø250 ø300 ø400 ø450 30.23 327.52 8.19 11.73 167.85 20 20 20 20 20 36 393 10 14 201 Total Volume (L) 485 909 895 1093 1918 1948 4056 4414 5266 2262 14431 1767 19085 27488 Chilled Water (Pre‐insulated burried) Pipe Diameter 6'' Pipe Diameter 10'' Pipe Diameter 12'' Pipe Diameter 16'' Pipe Diameter 18'' Total 636 19290 707 1760 31967 140377 Item Quantity 3 Total Total + 20% Chillers Unit Volume (L) Total Volume (L) 191 573.00 573.00 687.60 Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 2 43 Total Total + 20% AHU Total Volume (L) 47.74 11.58 23.3 14.1 23.3 71.53 30.25 30.22 100.86 15.75 38.13 58.41 11.58 58.41 41.99 50.29 58.37 66.53 19.68 19.68 41.97 41.97 14.1 11.58 19.03 58.37 20.54 20.54 20.54 19.68 19.68 41.97 47.74 19.03 47.74 47.74 11.58 21.92 58.41 72.62 11.58 11.58 11.58 1483.19 1779.83 Item Quantity 181 60 89 62 49 55 Total Total + 20% Item Total FCU Unit Volume (L) 1.87 2.26 3.19 4.3 4.75 6 Total Volume (L) 338.47 135.60 283.91 266.60 232.75 330.00 338.47 406.16 All System 143250.59 Design calculation sheet Project no. Date: Sheet no.: 1 of 1 Subject: Computed by: Checked by: Approved by: Diaphragm type Closed Expansion Tank sizing Sizing is based on ASHRAE 200 HVAC Sytems & Equipment, Chap 12, Hydronic Heating & Cooling System Design Vt VS Vt Vs t1 t2 Pa Pi P1 = = = = = = = Pmax P2 = = = = [( 2 1 ) 1] 3 T 1 ( P1 P2 ) Volume of expansion tank Volume of water in system Lower temperature Higher Temperature Atmospheric Pressure Initial Fill or minumium Pressure at tank Absolute Pressure at lower temperature (Pi + Pa ) Maximum System Allowable Pressure Absolute Pressure at higher temperature (Pmax + Pa ) Specific volume of water at lower temperature Specific volume of water at higher temperature (gal) (gal) (ºF) (ºF) (psia) (psig) (psia) = = = = = 37,842 42 88 14.7 76.5 91.2 (psig) (psia) = 125 139.7 (ft3/lb) = 0.01602 (ft3/lb) = 0.01609 = 1.004% ( 5.6 ºC) ( 31.2 ºC) ( 5.3 bars) ( 8.7 bars) = Linear Coefficient of thermal expansion for steel (in/in.ºF) = 6.5E-06 Vt = 37842 x [( 0.01609 / 0.01602) - 1 ] 1 ( ( 3 x 6.5E-06 91.2 / x ( 88 - 42 )) 139.7 ) Vt = 379 gal Selected Tank Capacity: = 1433 liters 1 Tank 2000 Note to user: Selection shall be based upon actual catalogue data as available from various. manufacturers. Liters