FORM TECH-6B: ATTACHED CURRICULUM VITAE (CV) 1. Proposed Position: Quantity surveyor 2. Name of Firm: SMEC International Pty Ltd 3. Name of Expert: Aisa Aidyn 4. Current Residential Address: Telephone No.: Fax No.: E-Mail Address: 5. Date of Birth: 25/10/1991 6. Education: 7. Membership Professional Associations: Bachelor's degree in transport construction, specialty – “Construction of roads and airfields”, Kazakh Automobile and Road Institute n amed after L. B. Goncharov, Almaty2018-2020. Bachelor’s degree in civil construction, specialty – “Geodesy and cartography”, Eurasian National University named after L.N.Gumilyv, Nur-Sultan city, 2011-2016 Bachelor’s degree in economic and management , specialty – “Accounting and auditing”, Kyzylorda University named after Korkyt ata, Kyzylorda city, 2022-2024 N/A 8. Other Trainings: in Citizenship: Kazakhstan Almaty region +7 701 091 47 37 /// +7 777 290 18 32 n/a askar.amanbay@bureauveritas.com Aysa_ay@mail.ru Type of government ID 911025000063 and ID Number. Expert Certificate for carrying out expert work and engineering services No. KZ05VJE00071596: Technical Supervision for the facility of the second and third levels of responsibility - for bearing and enclosing structures, date of issue: 05.01.2022. English teaching centre «United World», «Interpress» – Certificate upper-intermidate level, 15.03.2013 – 24.02.2014г.(Astana) Confucius Institute Eurasian National University named after L.N. Gumilyov – Certificate of Chinese language (HSK 5, upper-intermidate level), 01.09.2013 – 01.07.2016. (Astana) 9. Countries of Work Experience: Kazakhstan 10. Languages: Reading Excellent Upper intermediate Native Upper intermediate Russian English Kazakh Chinese Speaking Excellent Upper intermediate Native Upper intermediate Writing Excellent Upper intermediate Native Upper intermediate 11. Employment Record Period, From – To 07.2024 present Employer ZTE Kazakhstan Positions held Head of design department 09/2023-06/2024 Quality control Engineer 04/2018 – 06/2023 Temelsu international engineering services Inc. M50 Consulting Group 09/2017 – 12/2017 Geoid – Semey Surveyor 06/2016 – 01/2017 06/2015 – 06/2016 Isker-T LLP BI Group Surveyor Surveyor’s assistant Quantity surveyor 12. Detailed Tasks Assigned: All the tasks assigned to Deputy Resident Engineer/Road Engineer as per TECH-6 and the TOR 13. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Construction of a base station for cellular communications of Beeline JSC Month and year: 07.2024 present Location: Turkistan, Akmola region Client: Beeline JSC Positions held: Head of design department Main project features: Implementation of projects for the development and construction of a transport network of fiber-optic communication lines, radio relay lines and station facilities for 2G, 3G, 4G communications of Beeline JSC Activities Analysis of the implementation of construction plans for communications projects and ensuring their effective implementation. Implementation and control over the performed: development of design and estimate documentation and accounting of issued documentation. Analysis of design and estimate documentation for communications projects. Organization and Verification of work on calculating the cost of construction, installation, repair and other services provided by third-party organizations based on the current estimate and regulatory framework and costing Name of assignment or project: IDB, FIDIC based Contract] Consultant services for the irrigation system Reconstruction Project “Rehabilitation of irrigation and drainage system” in Zhetisu region Month and year: 09/2023-06/2024 Location: Kazakhstan, Zhetisu Region Client: IDB/Committee for water resources of the Ministry of Positions held: Quality Control Engineer irrigation of the PK Main project Total irrigation system in Koksu district, irrigation systems with an area of about 29 000 ha with water intake from Koksu river is served by the massif is about 350 features: million m3 per year, with a head flow rate of up to 30 m3/s . As well as The project also provides for the construction 65 km of canals and 686 hydraulic structures. Central Asia Regional Economic Cooperation Corridors 1, 2, and 6 Connector Road (Kyzylorda– Zhezkazgan) Reconstruction Project Page 1 of 3 FORM TECH-6B: ATTACHED CURRICULUM VITAE (CV) Activities performed: Construction Supervision Consultant Services on irrigation system construction/reconstruction projects funded by IFI, monitoring the availability and correctness of asbuilt technical documentation by the contractor checking the quality of construction and installation works, materials used, products, structures and equipment, for compliance with their design documentation, technical conditions, requirements of technical regulations, the availability and correctness of documents confirming their quality (passports, certificates, test results). EBRD, FIDIC based Contract] Consultant services for the Road Reconstruction Project for the reconstruction of the “Kyzylorda-Pavlodar-Uspenka-RF border” road of republican significance, section “Kyzylorda-Zhezkazgan” km 12-216. Name of assignment or project: Month and year: 04/2018 – 06/2023 Client: EBRD/JSC "NC "KazAutoZhol" Location: Positions held: Kazakhstan, Kyzylorda Region Quantity surveyor Main project features: Reconstruction of the republican road A-17 "Kyzylorda-Pavlodar-Uspenka-gr.RF" section Kyzylorda-Zhezkazgan km 156-216, is financed jointly by the Government of the Republic of Kazakhstan (Government) through JSC "National Company" KazAvtoZhol "and the European Bank for Reconstruction and Development (EBRD). The project provides for the reconstruction of 60.00 km of the Kyzylorda-Zhezkazgan road, which connects the cities and administrative centers of the KyzylordaZhezkazgan regions. This road is also a key connector of international corridors. Activities Before start construction works, check drawing and bill of quantity, contractor's method of production works. After start construction works, control actual quantity of performed: contractor's work,executive documentation, work schedule, finincial plan. Preparation interim payment certificat of contractor, Variation order, monthly progress report. Consult to contractor implemantation of project in accordance with FIDIC. Name of ADB, FIDIC based Contract] Consultant services for the Road Reconstruction Project connecting Corridor 1 and Corridor 6 of CAREC (Aktobe – Makat) (section km assignment or 156-330) project: Month and year: 04/2018 – 06/2023 Location: Kazakhstan, Aktobe Region Client: Committee for Roads of the MIID PK Positions held: Quantity surveyor Main project features: The project involves the reconstruction of 299 km of the Aktobe-Makat road, which connects the cities and regional capital of Aktobe and Artyrau. This road is also a key connector of international corridors. Activities Before start construction works, check drawing and bill of quantity, contractor's method of production works. After restart construction works, control actual quantity performed: of contractor's work,executive documentation, work schedule, finincial plan. Preparation interim payment certificat of contractor, Variation order, monthly progress report. Consult to contractor implemantation of project in accordance with FIDIC. Name of Creation of a geo-information portal for overhead and underground utilities within the city of Atyrau assignment or project: Month and year: 09/2017 – 12/2017 Location: Kazakhstan, Atyrau Region Client: JSC KazGeoCosmos Surveyor Positions held: Main project features: Activities performed: Creation of a geo-information portal for overhead and underground utilities within the city of Atyrau Geodetic works on binding of underground and overhead utilities. Work with Leica GS14 and Trimple GNSS R8 GPS systems, work with LeicaTC805, TS06, Trimble DR M3 total stations, RIDGID SR24 search equipment; Detailing of wells, depth measurement, clarification of information on underground laying, diameter, depth, material, direction; Preliminary processing of field material for its subsequent transfer to the cameral department of completion report, coordination of drawings. Name of Republican Budget funded] Almaty-Taldykorgan Road Reconstruction Project, section km 231–251 assignment or project: Month and year: Kazakhstan, Almaty Region 06/2016 – 01/2017 Location: Client: JSC KazGeoCosmos Main project features: Activities performed: Positions held: Surveyor The project involves the reconstruction of 265 km of the Almaty-Taldykorgan road, which connects the cities and regional capital of Almaty and Taldykorgan. This road is also a key connector of international corridors Implementation of a complex of geodetic works, ensuring exact compliance with the design of geometric parameters, coordinates and elevations of road structures during construction. Receipt from the Employer of the geodetic control network and execution of location survey in the process of road construction. Carrying out asbuilt surveys during the construction of road structures, with preparation of the necessary as-built documentation, which is used when handing-over the completed construction sites. Republican Budget funded] Centre- East Corridor “Astana-Pavlodar-Kalbatau- Ust-kamenogorsk” reconstruction project, section “Astana-Ereymentau-Shiderty” km 36 – 58 Name of assignment or project: Month and year: Kazakhstan, Akmola Region 06/2015 – 06/2016 Location: Client: BI Group Positions held: Surveyor’s assistant Main project features: Project involves the reconstruction of 948 km of the Astana- Ust-Kamenogorsk road, which connects the cities and regional capital of Astana and East Kazakhstan. This road is also a key connector of international corridors. Activities performed: Conduction of instrumental survey, calculations, Geodetic support of the facility, construction and installation works, Preparation of working documentation. 14. Certification: (i) (ii) (iii) (iv) I, the undersigned, certify to the best of my knowledge and belief that This CV correctly describes my qualifications and experience; I am not a current employee of the Executing or the Implementing Agency; In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form TECH-6 provided team mobilization takes place within the validity of this proposal; I was not part of the team who wrote the terms of reference for this consulting services assignment; Central Asia Regional Economic Cooperation Corridors 1, 2, and 6 Connector Road (Kyzylorda– Zhezkazgan) Reconstruction Project Page 2 of 3 FORM TECH-6B: ATTACHED CURRICULUM VITAE (CV) (v) (vi) (vii) I do not have conflict of interest in accordance with ITC 3.0; I am not subject to any national or international sanctions, temporary suspension or debarment by ADB or other multilateral development banks (MDB); I certify that I have been informed by the firm that it is including my CV in the Proposal for the [Central Asia Regional Economic Cooperation Corridors 1, 2, and 6 Connector Road (Kyzylorda–Zhezkazgan) Reconstruction Project. Loan/Grant No. and Title: P51264-KAZ]. I confirm that I will be available to carry out the assignment for which my CV has been submitted in accordance with the implementation arrangements and schedule set out in the Proposal. (viii) I have not been found guilty or convicted of any violation of law that is not a minor traffic violation. (ix) I can accept payments through the international banking system or otherwise discharge ADB’s obligation upon initiation of wire transfer. (x) I understand that it is my obligation to notify the Client and ADB should I become subject to any national or international sanction, including becoming ineligible to work with ADB or other MDBs, cannot accept payments through the international banking system, should integrity issues including conflict of interest arise and/or should we or the proposed consultant be convicted of an offence excluding minor traffic violations. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged. Date: EXPERT’S NAME SURNAME Day/Month/Year Full name of authorized representative Date: KAWA BAHA Day/Month/Year Central Asia Regional Economic Cooperation Corridors 1, 2, and 6 Connector Road (Kyzylorda– Zhezkazgan) Reconstruction Project Page 3 of 3