Method of Statement for Tie-in Joints Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Page 1 of 10 New Ethylene Supply Pipeline from SADARA to SIPCHEM Method of statement For Tie in Joints 0 Issue For Approval Rijo Johnson Jomin Kollanoor Ahmed Mohiuddin Rev. Description Origin by Check by Approve by Gas Arabian Services (GAS) Status Date SIPCHEM The contents of this document being the property of Gas Arabian Services (GAS) are confidential and shall not be disclosed to the others or reproduced in any manner without written consent of GAS. Method of Statement for Tie-in Joints Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Page 2 of 10 Table of Contents 1. Introduction……………………………………………………………………………………………………………3 2. Scope……………………………………………………………………………………………………………………..3 2.1 Pre-shutdown and shop activities…………………………………………………………………….3 2.2 Site activities……………………………………………………………………………………………………3 3. References…………………………………………………………………………………………………………….4 4. Responsibilities……………………………………………………………………………………………………..5 5. Review and approval of tie-in welds…….……………………………………………………………….5 6. Preparation and safety precautions………………………………………………………………………6 7. Inspection and records………………………………………………………………………………………….7 7.1 Fit-up and Inspection………………………………………………………………………………………7 7.2 Welding and Inspection………………………………………………………………………………….7 8. Risk Assessment…………………………………………………………………………………………………..8 Method of Statement for Tie-in Joints Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Page 3 of 10 1. Introduction In SIPCHEM, IPC receives ethylene from UNITED. Currently SADARA is having a 6” tie-in available on their ethylene header for future connection in the RC corridor approx. 5 kms away from SIPCHEM East park across the road 218/255. SIPCHEM is going to utilize this connection to import ethylene from SADARA 6” future tie-in on Ethylene header at RC corridor to SIPCHEM East park by constructing new 8” Ethylene supply line and its associated control system. This Method of Statement provides guidelines for the design and installation of piping tie-ins (4 Nos) by the method of Cold tap at SIPCHEM east park IUC U&O1 / IPC plant, Utility Area. 2. Scope The Scope include piping tie-in of 4 Nos by the method of Cold tap to the existing line during forth coming IPC shutdown. Shop and field activities are as below 2.1 Pre-shutdown and shop activities2.1.1 Field Verification to be done based on Shutdown Tie-in IFC drawings. 2.1.2 Develop Weld map and numbering of pipe spools prior to fabrication. 2.1.3 Ensure all materials test certificates are reviewed and approved by QA/QC. 2.1.4 Sandblasting, painting and coating of Pipe and Pipe fittings. 2.1.5 Cutting, grinding, beveling, DPT and fit-up of Pipe spools with reference to weld map and offer for fit-up inspection. 2.1.6 Joint welding of fit-up pipe spools. 2.1.7 NDT of Golden joints. 2.1.8 Hydrotest of Pipe spools and Valves. 2.1.9 Transportation of Valves and Pipe spools to Site and ensure proper storage inside site temporary storage facility. 2.2 Site activities Method of Statement for Tie-in Joints Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Page 4 of 10 2.2.1 Cutting, grinding, beveling, DPT and Fit-up of Tie-in point (TP-P-0062-001) and offer for Fit-up inspection 2.2.2 Cutting, grinding, beveling, DPT and Fit-up of Tie-in point HV-31401 and offer for Fit-up inspection 2.2.3 Joint welding of Tie-in point (TP-P-0062-001) 2.2.4 Joint welding of Tie-in point HV-31401 2.2.5 Cutting, grinding, bevelling , DPT and Fit-up of Tie-in point (TP-P-0062002/003/004) and offer for Fit-up inspection 2.2.6 Joint welding of TP-P-0062-002/003/004. 2.2.7 NDT(Golden Joints) at Tie in Point TP-P-0062-001 & HV – 31401 2.2.8 NDT(Golden Joint) at Tie in Point TP-P-0062-002, 003 & 004 2.2.9 Installation of Valve, pipe spool and End blind in TP-P-0062-001 by using Load bearing structure(Manual rigging) and Bolt torquing. 2.2.10 Installation of Valve and End blind in TP-P-0062-002 by using Load bearing structure(Manual rigging) and Bolt torquing. 2.2.11 Installation of temporary spool for HV -31402 by crane lifting and bolt torquing. 2.2.12 Installation of Jump over loop spool, gate Valve, check valve and spectacle blinds by crane lifting in Tie-in point (TP-P-0062-003 &004 ) and bolt torquing. 2.2.13 Final Visual inspection and touch up painting. 2.2.14 Close punch list items. 3. References 00-PI-00-SS-002 Piping Material Line Class and Index 00-PI-00-SS-011 Shop & Field Fabrication of Metallic Piping 00-PI-00-SS-012 Bolt Torquing Requirements 00-WE-00-SS-009 Welding and NDE Requirements for Pipe Fabrication Method of Statement for Tie-in Joints Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Page 00-PI-00-SS-011 5 of 10 Specification for Field Fabrication & Erection of Piping Systems ASME B31.3 - Chemical Plant and Petroleum Refinery Piping API Publication 2009 - Safe Welding and Cutting Practices in Refineries, Gas Plants, and Petrochemical Plants. ASME Section IX - Welding and Brazing Qualification ASME V - Non Destructive Examination 4. Responsibilities The Project manager shall ensure the work is completed on schedule and safely, meeting the specified quality standards. The Project Engineer and Construction Manager shall ensure that suitable and sufficient resources and contractual arrangements are in place to comply with this procedure. The HSE Manager shall ensure that safety assessment and suitable safety measurement on site have been done properly prior to tie-in. The QC Manager shall ensure that the persons carrying out inspections and witnessing in accordance with this procedure have appropriate skills, qualifications and information to undertake their tasks. The Piping Engineer shall provide information on the proposed Tie-in weld to the QC Welding controller and shall provide engineering support to ensure that all relevant design requirements are met in the finished joint. The Welding Inspector shall review the checklist in detail and ensure that the proposed welding and inspection processes clearly identified and are appropriate to the joint and the applicable codes. The GAS Welding Inspector shall carry out the inspections required in accordance with the Approved Tie-in Weld Inspection Record checklist. If in doubt they shall not approve Method of Statement for Tie-in Joints Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Page 6 of 10 or pass the inspection but shall raise the matter in the first instance to the QC Manager. 4. Review & Approval of Tie-in Weld Piping tie-ins shall be approved by Contractor (GAS) Lead Piping Engineer and SIPCHEM Representative before any work can be done to existing piping. The approved Tie-in List is mandatory prior to construction. The Piping Discipline Manager (Piping Construction Team) shall prepare a Checklist for the joint in question with details as follows; Allocate Tie-in Weld Number. Copy of relevant Tie-in List, isometrics, nozzle drawings, weld details and WPS. Reference to design pressure test requirements pressure and media. Proposed alternate/ reduced strength/ leak test for example sensitive or gross leak check. Joints/Spools which have no access to do pressure test will be follow golden joint requirements and it should be verified & approved by SIPCHEM. The piping Supervisor then passes the checklist to the Welding Inspector for review The Welding Inspector reviews the welding and inspection process in detail, updates the checklist and passes to QC Manager for Approval. The QC Manager approves the form and passes to SIPCHEM for review. SIPCHEM review and approve the checklist and return to GAS either approved, or with comments. The QC Manager distributes the checklist together with its associated information for the relevant action. 5. Preparation and Safety Precautions Tie-in work shall be done only at specified tie-in points Tie-in points shall be clearly marked with tie-in points numbers identical to tie-in list Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Method of Statement for Tie-in Joints Page 7 of 10 Each tie-in work area shall be prepared in accordance with SIPCHEM specifications, before tie-in work is performed. Drilling Hole or Cold Cutting (by use of hacksaw) is required with gas detection for the existing line with combustible or explosive service after system shut down. Valves in the line should be closed and locked out. The pipe should be disconnected and drained. The open end of the pipe sections not being worked on should be blanked off. Stress Analysis of the existing piping to be checked if required prior to start the activities. 6. Inspection & Records 6.1 Fit Up & Inspection The Piping Supervisor shall inform the piping team of the requirement to comply with the checklist. In particular the Piping Supervisor shall inform the QC Welding Inspector in good time to allow all required inspections to take place including those prior to fit up. Examples of such inspections include a) Weld Prep Visual Examination b) Weld Prep NDE c) Internal cleanliness, dry air purge check The Welding Inspector shall check and where appropriate measure the weld bevel preparation, to confirm that the bevels and internal pipe profile are according to the requirements on the WPS. The pipe work shall be thoroughly cleaned and visually inspected internally. Any other internal inspections, tests or treatments identified on the approved shall be completed. The joint shall then be fitted up and the fit-up visually inspected by the Welding Inspector. When the fit up inspection is completed the Welding Inspector shall sign off the Method of Statement for Tie-in Joints Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Page 8 of 10 relevant sections of the checklist and welding of the root pass may proceed. 6.2 Welding & Inspection The Welding Inspector shall retain a copy of the approved checklist at the Joint and shall witness the whole process of executing the Tie-in weld and shall sign off the applicable section of the checklist only if the welding process is acceptable. If not acceptable the Welding Inspector shall place the work on “HOLD” and shall report immediately to the QC Manager who shall decide the follow up actions. In all cases such failure and the approval of remedial actions shall be recorded and retained with the original checklist. Throughout the welding of the root pass the concavity shall be visually checked and where relevant the purge quality assessed. The root pass shall be checked for cracks after cleaning by means of PT by SEG ASNT level II/Third party NDT technician . The Welding Inspector shall then sign off the relevant section of the check list. The weld shall be completed. The welding inspector shall monitor the following items where relevant: Inter-pass temperature filler material and position Inter-pass appearance and cleaning stop start overlaps & positions for socket welds When the weld is completed the Welding Inspector shall sign-off the relevant sections for in-process examination and shall complete and sign off the visual examination of the weld The completed weld shall be subjected to NDE after heat treatment. NDE shall include: Other Examination as required by design requirements. When all above inspections have been completed satisfactorily and all records collected together and verified by the Welding Inspector and it will be signed off by GAS/SIPCHEM Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Method of Statement for Tie-in Joints Page 9 of 10 7. Risk Assessment The Safety Manager shall ensure that the requirements of the project Health and Safety plan, Job Safety analysis and task risk assessment are carried out in respect of Cutting existing pipe, welding and inspection. The provision of a Tie-in weld inspection form and approval for welding does not relieve the piping supervisor of the requirement to specifically assess the risks associated with Tie-in welds: Asphyxiation, Explosion, Fire, Engulfment and Unplanned release of energy (pressure) and taking all necessary measures. The Piping supervisor shall ensure that the Hot Work Permits is followed, including the permit requirements for radiography. The Piping Supervisor shall ensure that only persons appropriately trained and competent to undertake the work described in this procedure shall be allowed to do so and that proper means of access are provided for all activities. Supervisors Name: Activity: Tie-in activity on pipeline Company: GAS Work Team: Job Steps / Date: Hazards (see attached list) Persons at Risk(1) L(2) S(2 =R( Controls ) 3) Activities Gas Test Perso n Respo Fire or explosive due to remaining H2 in the pipeline Burning Injury 1 2 2 nsibe Conduct gas testing prior start the activity. Supervisor and Gas The gas monitor shall be inspected by The tester Third Party. Only competent gas tester shall conduct gas testing. Fire extinguishers shall be in place. Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Method of Statement for Tie-in Joints Page 10 All tools and Equipments shall be met with Client specification Tools& Ensure all tools& equipments are inspected and color coded by competent personal before use, and remove damage tools& equipment from the site. Equipme nt preparati of 10 Equipment & tool Mechanical failure Injury 2 1 2 Safety Officer Maintain the tools and equipments in good condition on Prepare fire extinguisher closed by Put fire-proof blanket to protect flammable goods Take away all the flammable objectives or trashes Ensure good connection between hose and cylinder without any gas leakage. Hot work Fire due to Burning welding and torch, Injury burned 1 2 2 Install fire flashback arrest for oxygen and Fire Watcher acetylene cylinders. Wear appropriate PPE to avoid burning by spunk Assign full time fire watcher to monitor the hot work. And the fire watcher should be trained. Proper scaffold should be provided for elevated activity. The scaffold should be inspected by competent scaffold inspector. Only green and yellow tagged scaffold can be used. Red tagged scaffold cannot be used. Work at height Falling hazard Falling Injury 1 2 2 Working at height training should be conducted to involved personals. 100% tie-off compliance (full body harness with twin shock absorbing lanyards) Provide adequate safety awareness signs. Maintain good housekeeping on the working platform to avoid falling objects. Supervis or and Safety officer Method of Statement for Tie-in Joints Project No 7600000314 Doc. No. SSEK(EPC)-CO-00-MOS-001 Rev01 Rev. No. 0 Date January 19, 2025 Page Notes 11 (1) Include inexperienced persons, under 18s and new (within 6 months) and of 10 Completed by expectant mothers (2) Severity 3 = Permanent (e.g., loss of 3 limb, occupational illness) or fatality 3 6 9 2 2 4 6 Severity 2 = Serious (e.g., fractures, major cuts or burns) Severity 1 = Significant (e.g. minor sprain/strain, irritation, trivial cuts/burns) (3) The residual risk is to be calculated using the table. Risk figures above 3 are not acceptable and work must not continue until the risks are reduced. 1 1 2 3 Date