Download valid H19-105_V2.0-ENU exam dumps for best preparation Exam : H19-105_V2.0-ENU Title : HCSA-Sales-Data Center Facility V2.0 https://www.passcert.com/H19-105_V2.0-ENU.html 1two NUMPAGES Download valid H19-105_V2.0-ENU exam dumps for best preparation 1. UPS5000 -A 30~120kVA can support wall installation. A. True B. False Answer: B 2. UPS2000-G monitors the entire parallel system with one card. The parallel system only needs one communication option card to monitor the entire parallel system. A. True B. False Answer: A 3. FusionModule1000A V2R3 version uses Huawei UPS5000E as IT load power supply A. True B. False Answer: B 4. Fire extinguishing measures that can be adopted in Class A computer rooms include () A. Gas fire extinguishing system B. Water mist fire extinguishing system C. Automatic sprinkler system D. All of the above Answer: A 5. The water inlet slope of the fan coil condensate tray should be no less than? A. 0.01 B. 0.02 C. 0.05 D. 0.1 Answer: A 6.FusionModule2000 integrated UPS has two models: 50K/125K. A. True B. False Answer: A 7.UPS2000-G adopts high power density design, 6k/10k is only 2U high, 15K/20K is only 3U high, reducing installation space. A. True B. False Answer: A 8.The UPS5000-E power module adopts a fan fault-tolerant design. When two of the fans fail, how much load can the power module still carry? A. 0.2 2two NUMPAGES Download valid H19-105_V2.0-ENU exam dumps for best preparation B. 0.3 C. 0.5 D. 0.6 Answer: B 9.What is the total IT load power of the FusionModule1000A V2R3 version 40-foot IT solution? A. 52kW B. 55kW C. 70kW D. 72kW Answer: A 10. The EC fan brand used in the NetCol5000-A025H half-cabinet row-level variable-frequency air-cooled precision air-conditioning indoor unit is Xerox Bai. A. True B. False Answer: B 11. Three-proof paint coating can significantly reduce the failure rate of UPS in harsh environments such as salt spray, dust, high temperature and humidity, ensuring its service life in harsh environments. A. True B. False Answer: A 12.FusionModule1000A V2R3 version 40-foot CT solution can install 8 CT cabinets A. True B. False Answer: A 13. Which of the following models can be equipped with an external large-capacity battery charger for fast recharging? A. UPS5000-A B. UPS5000-E C. UPS2000-A 6/10K Professional Edition Standard D. UPS2000-G 6K long-term Answer: C 14. The basic principles of refrigeration for air-cooled and water-cooled air conditioners are the same A. True B. False Answer: A 15. The fans of NetCol5000-C030H row-level chilled water precision air conditioners can be maintained online, and a separate power-off switch can be provided for each fan to avoid safety hazards caused by 3two NUMPAGES Download valid H19-105_V2.0-ENU exam dumps for best preparation direct live maintenance. A. True B. False Answer: A 16.UPS5000-E (50kVA power module) has a single cabinet capacity of 300kVA and can support 8 racks in parallel. A. True B. False Answer: A 17. In FusionModule2000, when the columns occupy the closed channel space in the column-surrounding scene, how should the skylight be adapted? A. Custom tempered glass flip skylight B. On-site processing with control skylight C. On-site cutting of adjustable skylights made of plexiglass D. Seal with an adjustable cover plate for skylight Answer: D 18. The capacity management module of the NetEco management system can manage the resource capacity information in the computer room. Which of the following capacity factors falls within the management scope of NetEco? A. Network port B. Network bandwidth C. CPU utilization D. None of the above Answer: D 19.Which of the typical configurations of FusionModule800 are optional? A. Temperature and humidity, door magnet, water immersion, smoke sensor, mobile phone APP B. Smoke sensor, door sensor, water flooding, SMS alarm, pad C. Water immersion, door sensor, video, backup power, ibattery Answer: B 20. The NetEco management system can provide a temperature cloud map function to monitor the temperature distribution in the computer room and quickly identify hot spots in the computer room. A. True B. False Answer: A 21. The backup time of UPS system is generally within 30 minutes, so it is more reasonable to use constant current method to calculate battery capacity. A. True B. False 4two NUMPAGES Download valid H19-105_V2.0-ENU exam dumps for best preparation Answer: B 22. Configure a modular redundant UPS system. As long as the number of modules meets the basic requirements, there is no need to consider the distribution of UPS modules on different racks. A. True B. False Answer: B 23. The air conditioning water system includes the cooling water system, the chilled water system and the condensing water system. A. True B. False Answer: A 24. Huawei precision air conditioners have RS485 communication interfaces for remote inspection and parameter setting of the system: Modbus open protocol is provided to access the computer room environment monitoring system to reduce service costs. A. True B. False Answer: A 25. In UPS5000-A system, which of the following battery configuration is unreasonable? A. 32 12V batteries B. 37 12V batteries C. 40 12V batteries D. 42 12V batteries Answer: B 26.FusionModule1000A V2R3 version IT solution comes standard with cabinet spring damping device A. True B. False Answer: A 27.The power module efficiency of UPS5000-E (25-75kVA) is 96%. A. True B. False Answer: A 5two NUMPAGES