Essential Study Guide and Exam Questions to Ace the H12-461 Exam

advertisement
www.certfun.com
PDF
Essential Study Guide and Exam
Questions to Ace the H12-461
Exam
Here are all the essential details you need to pass the H12-461 exam on your first attempt.
Eliminate all your worries and access everything you need—syllabus information, study guides,
practice tests, books, and study materials—all in one place. With the right preparation for the
Huawei H12-461 certification, you can strengthen your understanding of the syllabus domains,
making it easier to earn the Huawei Certified ICT Expert-Data Center Facility Design
certification.
Certfun.com
HCIE-Data Center Facility Design
1
www.certfun.com
PDF
How to Earn the H12-461 Huawei
Certified ICT Expert-Data Center Facility
Design Certification on Your First
Attempt?
Earning the Huawei H12-461 certification is a dream for many candidates. But,
the preparation journey feels difficult to many of them. Here we have gathered all
the necessary details like the syllabus and essential H12-461 sample questions
to get to the Huawei Certified ICT Expert-Data Center Facility Design certification
on the first attempt.
HCIE-Data Center Facility Design
1
www.certfun.com
PDF
H12-461 HCIE-Data Center Facility Design Summary:
Exam Name
Huawei Certified ICT Expert-Data Center Facility Design
Exam Code
H12-461
Exam Price
$300 (USD)
Duration
90 mins
Number of Questions 60
Passing Score
600/1000
Books / Training
HCIE-Data Center Facility Design V1.0 Training
Schedule Exam
Pearson VUE
Sample Questions
Huawei HCIE-Data Center Facility Design Sample Questions
Practice Exam
Huawei H12-461 Certification Practice Exam
Let’s Explore the Huawei H12-461 Exam Syllabus in Detail:
Topic
Data Center
Infrastructure
Consulting and
Planning Guide
Details
Weights
- Data Center planning process
- Data Center evaluation model
15%
- Site selection report
- Feasibility study
- Data Center power distribution system planning and
Data Center Power design
Distribution System - Requirement analysis of the Data Center power
7%
Planning and Design distribution system
Overview
- Data Center power distribution system capacity
statistics
- Data Center UPS system components
- Data Center UPS planning preparations
Data Center UPS
- UPS networking mode
7%
System Planning
- Single UPS capacity configuration
- UPS device selection
- Battery configuration
- Components of the low-voltage power distribution
system
- Planning and preparations for the low-voltage power
Data center lowdistribution system
voltage power
- Load classification
4%
distribution system
- Power Supply Solution Selection
planning
- Low-voltage electrical appliance selection
- Power distribution cabinet configuration
- Conductor selection
Data Center D.G.
- Components of the D.G. system
4%
System Planning
- Data Center D.G. system planning preparations
HCIE-Data Center Facility Design
2
www.certfun.com
Topic
Data Center Power
Supply and
Distribution
Architecture Case
Analysis
PDF
Details
- Selection of the D.G. networking mode
- D.G set selection
- D.G set capacity configuration
- D.G fuel tank capacity configuration
- Typical DC power distribution system solution
- Analysis of typical power distribution system
solutions
Weights
7%
- Reliability analysis of the Data Center power supply
Data Center Power
solution
Supply Solution
5%
- Data Center power supply solution optimization and
Optimization Practice
reconstruction
- Data Center cooling system planning and design
overview
Data center cooling
- Data Center cooling system planning process
6%
system planning
- Data Center cooling system requirement planning
- Data Center cooling system planning
- Load types and control requirements of the cooling
system
Configuration and
- Calculating and estimating the cooling load
Load Calculation of - IT Load calculation description and selection
Air Conditioner
- Configuration principles and selection of the cooling 10%
Terminal System in system terminals
Data Centers
- Layout and planning of the cooling system terminals
- Data Center cooling system planning
- Air supply mode and selection of the cooling system
- Chilled water air conditioner planning overview
- Classification of chilled water systems for air
conditioners
Chilled Water Air
- Calculation and selection of chilled water units
Conditioner System - Calculation and selection of chilled water pumps
11%
Configuration
- Configuration of the air conditioner water system
- Cooling water system overview
- Cooling tower configuration selection
- Cooling water pump configuration selection
Energy-Saving
- Configuration of the natural cooling solution
Solution
- Water-side natural cooling solution
Configuration for the - Indirect evaporative cooling solution configuration 7%
Cooling System of
- Configuration of continuous cooling solution
the Data Center
- Configuration cases of the cooling system
- Cooling load estimation method of the cooling
Data center cooling
system
3%
system practice
- Configuration principles of the terminal air
HCIE-Data Center Facility Design
3
www.certfun.com
Topic
DCIM System
Planning Overview
DCIM Architecture
and Functions
DCIM System
Planning
PDF
Details
Weights
conditioners
- Output of the configuration solution of the terminal
air conditioners
- Selection and determination of chilled water system
- Chilled water system device selection and solution
optimization
- DCIM overview
- Relationship between the DCIM system and the
power and environment system, BMS, and ITSM
3%
- DCIM development trend
- DCIM planning process
- DCIM hardware architecture
- Logical architecture and functions of the DCIM
6%
- DCIM system performance and integration
- DCIM planning requirement analysis
- DCIM system architecture planning
5%
- DCIM system function selection
- DCIM hardware selection
Experience the Actual Exam Structure with Huawei H12-461
Sample Questions:
Before jumping into the actual exam, it is crucial to get familiar with the exam
structure. For this purpose, we have designed real exam-like sample questions.
Solving these questions is highly beneficial to getting an idea about the exam
structure and question patterns. For more understanding of your preparation
level, go through the H12-461 practice test questions. Find out the beneficial
sample questions below -
Answers for Huawei H12-461 Sample Questions
01. In the data center evaluation model, which metric is most indicative of a data
center's energy efficiency?
a) Uptime
b) PUE (Power Usage Effectiveness)
c) MTBF (Mean Time Between Failures)
d) Latency
HCIE-Data Center Facility Design
Answer: b
4
www.certfun.com
PDF
02. Considerations for selecting chilled water pumps include which of the
following? (Choose Three)
a) Pump efficiency
b) Ability to match the data center's interior design
c) Compatibility with the chiller capacity
d) Durability and reliability
e) Operational noise levels
Answer: a, c, d
03. Why is it important to accurately calculate the load when selecting chilled
water units?
a) To minimize operational costs
b) To ensure color uniformity
c) To maximize noise output
d) To comply with local fashion trends
Answer: a
04. During the selection of a chilled water system, it is crucial to consider the
__________ of the components.
a) color
b) brand
c) reliability
d) shape
Answer: c
05. What are important considerations when selecting a cooling tower for a data
center? (Choose Two)
a) Color of the tower
b) Thermal efficiency and capacity
c) Integration with other cooling infrastructure
d) Noise generation
HCIE-Data Center Facility Design
Answer: b, c
5
www.certfun.com
PDF
06. When evaluating potential sites for a data center, which factor is most
important for ensuring data security?
a) Proximity to power sources
b) Natural disaster risk assessment
c) Availability of high-speed internet
d) Local regulatory compliance
Answer: d
07. How should a data center's cooling load be calculated? (Choose Two)
a) Based on the maximum expected ambient temperature
b) Based on the total floor area of the data center
c) Based on the heat output of the IT equipment
d) Based on the type of flooring used
Answer: a, c
08. The cooling load estimation should be based on __________ data to ensure
accuracy.
a) theoretical
b) estimated
c) actual measured
d) randomly selected
Answer: d
09. What factors should be considered when selecting chilled water units for a
data center? (Choose Three)
a) Brand popularity
b) Capacity and efficiency
c) Compatibility with existing systems
d) Noise levels
e) Color of the units
HCIE-Data Center Facility Design
Answer: b, c, d
6
www.certfun.com
PDF
10. Which of the following best describes the relationship between DCIM systems
and IT Service Management (ITSM) systems?
a) DCIM systems operate independently of ITSM systems with no overlap
b) DCIM systems are a component of ITSM systems
c) DCIM systems can integrate with ITSM systems to enhance overall IT operations and
infrastructure management
d) ITSM systems are generally phased out when DCIM is introduced
Answer: c
HCIE-Data Center Facility Design
7