www.certfun.com PDF Essential Study Guide and Exam Questions to Ace the H12-461 Exam Here are all the essential details you need to pass the H12-461 exam on your first attempt. Eliminate all your worries and access everything you need—syllabus information, study guides, practice tests, books, and study materials—all in one place. With the right preparation for the Huawei H12-461 certification, you can strengthen your understanding of the syllabus domains, making it easier to earn the Huawei Certified ICT Expert-Data Center Facility Design certification. Certfun.com HCIE-Data Center Facility Design 1 www.certfun.com PDF How to Earn the H12-461 Huawei Certified ICT Expert-Data Center Facility Design Certification on Your First Attempt? Earning the Huawei H12-461 certification is a dream for many candidates. But, the preparation journey feels difficult to many of them. Here we have gathered all the necessary details like the syllabus and essential H12-461 sample questions to get to the Huawei Certified ICT Expert-Data Center Facility Design certification on the first attempt. HCIE-Data Center Facility Design 1 www.certfun.com PDF H12-461 HCIE-Data Center Facility Design Summary: Exam Name Huawei Certified ICT Expert-Data Center Facility Design Exam Code H12-461 Exam Price $300 (USD) Duration 90 mins Number of Questions 60 Passing Score 600/1000 Books / Training HCIE-Data Center Facility Design V1.0 Training Schedule Exam Pearson VUE Sample Questions Huawei HCIE-Data Center Facility Design Sample Questions Practice Exam Huawei H12-461 Certification Practice Exam Let’s Explore the Huawei H12-461 Exam Syllabus in Detail: Topic Data Center Infrastructure Consulting and Planning Guide Details Weights - Data Center planning process - Data Center evaluation model 15% - Site selection report - Feasibility study - Data Center power distribution system planning and Data Center Power design Distribution System - Requirement analysis of the Data Center power 7% Planning and Design distribution system Overview - Data Center power distribution system capacity statistics - Data Center UPS system components - Data Center UPS planning preparations Data Center UPS - UPS networking mode 7% System Planning - Single UPS capacity configuration - UPS device selection - Battery configuration - Components of the low-voltage power distribution system - Planning and preparations for the low-voltage power Data center lowdistribution system voltage power - Load classification 4% distribution system - Power Supply Solution Selection planning - Low-voltage electrical appliance selection - Power distribution cabinet configuration - Conductor selection Data Center D.G. - Components of the D.G. system 4% System Planning - Data Center D.G. system planning preparations HCIE-Data Center Facility Design 2 www.certfun.com Topic Data Center Power Supply and Distribution Architecture Case Analysis PDF Details - Selection of the D.G. networking mode - D.G set selection - D.G set capacity configuration - D.G fuel tank capacity configuration - Typical DC power distribution system solution - Analysis of typical power distribution system solutions Weights 7% - Reliability analysis of the Data Center power supply Data Center Power solution Supply Solution 5% - Data Center power supply solution optimization and Optimization Practice reconstruction - Data Center cooling system planning and design overview Data center cooling - Data Center cooling system planning process 6% system planning - Data Center cooling system requirement planning - Data Center cooling system planning - Load types and control requirements of the cooling system Configuration and - Calculating and estimating the cooling load Load Calculation of - IT Load calculation description and selection Air Conditioner - Configuration principles and selection of the cooling 10% Terminal System in system terminals Data Centers - Layout and planning of the cooling system terminals - Data Center cooling system planning - Air supply mode and selection of the cooling system - Chilled water air conditioner planning overview - Classification of chilled water systems for air conditioners Chilled Water Air - Calculation and selection of chilled water units Conditioner System - Calculation and selection of chilled water pumps 11% Configuration - Configuration of the air conditioner water system - Cooling water system overview - Cooling tower configuration selection - Cooling water pump configuration selection Energy-Saving - Configuration of the natural cooling solution Solution - Water-side natural cooling solution Configuration for the - Indirect evaporative cooling solution configuration 7% Cooling System of - Configuration of continuous cooling solution the Data Center - Configuration cases of the cooling system - Cooling load estimation method of the cooling Data center cooling system 3% system practice - Configuration principles of the terminal air HCIE-Data Center Facility Design 3 www.certfun.com Topic DCIM System Planning Overview DCIM Architecture and Functions DCIM System Planning PDF Details Weights conditioners - Output of the configuration solution of the terminal air conditioners - Selection and determination of chilled water system - Chilled water system device selection and solution optimization - DCIM overview - Relationship between the DCIM system and the power and environment system, BMS, and ITSM 3% - DCIM development trend - DCIM planning process - DCIM hardware architecture - Logical architecture and functions of the DCIM 6% - DCIM system performance and integration - DCIM planning requirement analysis - DCIM system architecture planning 5% - DCIM system function selection - DCIM hardware selection Experience the Actual Exam Structure with Huawei H12-461 Sample Questions: Before jumping into the actual exam, it is crucial to get familiar with the exam structure. For this purpose, we have designed real exam-like sample questions. Solving these questions is highly beneficial to getting an idea about the exam structure and question patterns. For more understanding of your preparation level, go through the H12-461 practice test questions. Find out the beneficial sample questions below - Answers for Huawei H12-461 Sample Questions 01. In the data center evaluation model, which metric is most indicative of a data center's energy efficiency? a) Uptime b) PUE (Power Usage Effectiveness) c) MTBF (Mean Time Between Failures) d) Latency HCIE-Data Center Facility Design Answer: b 4 www.certfun.com PDF 02. Considerations for selecting chilled water pumps include which of the following? (Choose Three) a) Pump efficiency b) Ability to match the data center's interior design c) Compatibility with the chiller capacity d) Durability and reliability e) Operational noise levels Answer: a, c, d 03. Why is it important to accurately calculate the load when selecting chilled water units? a) To minimize operational costs b) To ensure color uniformity c) To maximize noise output d) To comply with local fashion trends Answer: a 04. During the selection of a chilled water system, it is crucial to consider the __________ of the components. a) color b) brand c) reliability d) shape Answer: c 05. What are important considerations when selecting a cooling tower for a data center? (Choose Two) a) Color of the tower b) Thermal efficiency and capacity c) Integration with other cooling infrastructure d) Noise generation HCIE-Data Center Facility Design Answer: b, c 5 www.certfun.com PDF 06. When evaluating potential sites for a data center, which factor is most important for ensuring data security? a) Proximity to power sources b) Natural disaster risk assessment c) Availability of high-speed internet d) Local regulatory compliance Answer: d 07. How should a data center's cooling load be calculated? (Choose Two) a) Based on the maximum expected ambient temperature b) Based on the total floor area of the data center c) Based on the heat output of the IT equipment d) Based on the type of flooring used Answer: a, c 08. The cooling load estimation should be based on __________ data to ensure accuracy. a) theoretical b) estimated c) actual measured d) randomly selected Answer: d 09. What factors should be considered when selecting chilled water units for a data center? (Choose Three) a) Brand popularity b) Capacity and efficiency c) Compatibility with existing systems d) Noise levels e) Color of the units HCIE-Data Center Facility Design Answer: b, c, d 6 www.certfun.com PDF 10. Which of the following best describes the relationship between DCIM systems and IT Service Management (ITSM) systems? a) DCIM systems operate independently of ITSM systems with no overlap b) DCIM systems are a component of ITSM systems c) DCIM systems can integrate with ITSM systems to enhance overall IT operations and infrastructure management d) ITSM systems are generally phased out when DCIM is introduced Answer: c HCIE-Data Center Facility Design 7