Uploaded by AYUSH CHOUDHARY

P2A2015020XC esp

advertisement
CABLE /
CONDUIT
NUMBER
LOAD
HP
OR
KVA
SERVICE
PC-00381
POWER (ESP MOTOR)
PC-00382
500HP
POWER (ESP MOTOR)
PC-00383
500HP
POWER (ESP MOTOR)
PC-00384
500HP
POWER (ESP MOTOR)
PC-00385
VOLTS
2400
2400
500HP
"FROM"
END
CMP 2.5"
63PX2K
TMCX7247
2400
480
POWER (ESP MOTOR)
PC-00386
GLAND TYPE
-
3(CMP 2"
63SPX2K)
RUN
" TO "
END
FROM
CMP 2.5"
63PX2K
POWER (ESP MOTOR)
PC-00388
500HP
POWER (ESP MOTOR)
PC-00389
500HP
POWER (ESP MOTOR)
PC-00390
500HP
POWER (ESP MOTOR)
PC-00391
2400
500HP
CMP 2.5"
63PX2K
TMCX7247
2400
480
POWER (ESP MOTOR)
PC-00392
2400
-
3(CMP 2"
63SPX2K)
POWER (ESP MOTOR)
PC-00394
500HP
POWER (ESP MOTOR)
PC-00395
500HP
POWER (ESP MOTOR)
PC-00396
500HP
POWER (ESP MOTOR)
PC-00397
2400
500HP
CMP 2.5"
63PX2K
TMCX7247
2400
480
POWER (ESP MOTOR)
PC-00398
2400
-
3(CMP 2"
63SPX2K)
POWER (ESP MOTOR)
PC-00400
500HP
POWER (ESP MOTOR)
500HP
2400
2400
CMP 2.5"
63PX2K
TMCX7247
G
1/C 35mm2)
ESP JUNCTION BOX
WELLHEAD CONNECTION
P
3/C 35mm2
JB-2007
JUNCTION BOX JB-2017
G
1/C 16mm2)
WELLHEAD CONNECTION
ESP MOTOR
P
-
JUNCTION BOX JB-2017
GM-0714 (WELL #TBA
MAIN DISTRIBUTION PANEL
PHASE SHIFT TRANSFORMER
P
3-(3/C 185mm
MDP-0001
XFR-0009
G
1/C 35mm )
PHASE SHIFT TRANSFORMER
AFD CONTROLLER
P
XFR-0009
AFD-0009
AFD CONTROLLER
STEP-UP TRANSFORMER
AFD-0009
XFR(T)-1009
STEP-UP TRANSFORMER
ESP JUNCTION BOX
P
(3/C 120mm2
XFR(T)-1009
JB-2009
G
1/C 35mm2)
ESP JUNCTION BOX
WELLHEAD CONNECTION
P
3/C 35mm2
JB-2009
JUNCTION BOX JB-2019
G
1/C 16mm2)
WELLHEAD CONNECTION
ESP MOTOR
P
-
JUNCTION BOX JB-2019
GM-0914 (WELL #TBA
MAIN DISTRIBUTION PANEL
PHASE SHIFT TRANSFORMER
P
3-(3/C 185mm
MDP-0002
XFR-0002
G
1/C 35mm )
PHASE SHIFT TRANSFORMER
AFD CONTROLLER
P
XFR-0002
AFD-0002
AFD CONTROLLER
STEP-UP TRANSFORMER
AFD-0002
XFR(T)-1002
STEP-UP TRANSFORMER
ESP JUNCTION BOX
P
(3/C 120mm2
XFR(T)-1002
JB-2002
G
1/C 35mm2)
ESP JUNCTION BOX
WELLHEAD CONNECTION
P
3/C 35mm2
JB-2002
JUNCTION BOX JB-2012
G
1/C 16mm2)
WELLHEAD CONNECTION
ESP MOTOR
P
-
JUNCTION BOX JB-2012
GM-0214 (WELL #64
MAIN DISTRIBUTION PANEL
PHASE SHIFT TRANSFORMER
P
3-(3/C 185mm
MDP-0002
XFR-0004
G
1/C 35mm )
PHASE SHIFT TRANSFORMER
AFD CONTROLLER
P
XFR-0004
AFD-0004
AFD CONTROLLER
STEP-UP TRANSFORMER
AFD-0004
XFR(T)-1004
STEP-UP TRANSFORMER
ESP JUNCTION BOX
P
(3/C 120mm2
XFR(T)-1004
JB-2004
G
1/C 35mm2)
ESP JUNCTION BOX
WELLHEAD CONNECTION
P
3/C 35mm2
JB-2004
JUNCTION BOX JB-2014
G
1/C 16mm2)
CMP 2.5"
63PX2K
TMCX7247
-
3(CMP 2"
63SPX2K)
CMP 2.5"
63PX2K
TMCX7247
-
3(CMP 2"
63SPX2K)
CMP 2.5"
63PX2K
TMCX7247
2. CABLE TAG INCLUDES DESTINATION EQUIPMENT TAG NUMBER.
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
PC - Power Cable (Per SAES-P-104)
3. CABLE SIZES AND LENGHTS ARE PRELIMINARY. CONTRACTOR SHALL PERFORM ACTUAL
FJD
TAR
LMM
FJD
TAR
KXM
A
APR-24
ISSUED FOR DISCIPLINE CHECK
FJD
TAR
KXM
INTERNAL
REVISION
DATE
DESCRIPTION
DSND CHKD APPR
BY
BY
BY
WORLEYPARSONS MPP REVISION CONTROL
THIS STICKER IS USED FOR PROJECT TRACKING ONLY
AND WILL BE REMOVED AT ISSUED FOR CONSTRUCTION.
XLPE
XLPE
-
PP-2A2000
PP-2A2002
ELEC ONE LINE DIAGRAM 13.8KV SWGR SG-3011
PP-2A2003
ELECTRICAL ONE LINE DIAGRAM 480V POWER DISTRIBUTION
PP-2A2005
6
DSTA (DC-015-003-33)
7
PART OF CABLE
8
VENDOR SUPPLIED
9
CABLES & GLANDS
10
BY VENDOR (BY OTHERS)
11
55
2
6/10kV
(12kV)
27
XLPE
DSTA (DC-015-007-35)
13
PART OF CABLE
14
CABLE TYPE MC
15
SUPPLIED BY PUMP VENDOR
16
SUPPLIED BY PUMP VENDOR
17
(H/U SCOPE)
18
DSTA (DC-015-003-33)
19
PART OF CABLE
20
VENDOR SUPPLIED
21
CABLES & GLANDS
22
BY VENDOR (BY OTHERS)
23
6/10kV
(12kV)
-
600
70
2
600
XLPE
XLPE
-
2
6/10kV
(12kV)
27
25
PART OF CABLE
26
CABLE TYPE MC
27
SUPPLIED BY PUMP VENDOR
28
SUPPLIED BY PUMP VENDOR
29
(H/U SCOPE)
30
DSTA (DC-015-003-33)
31
PART OF CABLE
32
VENDOR SUPPLIED
33
CABLES & GLANDS
34
BY VENDOR (BY OTHERS)
35
6/10kV
(12kV)
-
XLPE
DSTA (DC-015-007-35)
-
600
85
2
600
XLPE
XLPE
6/10kV
(12kV)
27
DSTA (DC-015-007-35)
37
PART OF CABLE
38
CABLE TYPE MC
39
SUPPLIED BY PUMP VENDOR
40
6/10kV
(12kV)
SAUDI ARABIAN OIL COMPANY
IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
CERT. BY/DATE
REVIEW FOR KEY DRAWINGS
REQUIRED
CONST. AGENCY/DATE
REV. NO.
DATE
OTHER
(SAUDI ARAMCO)
OPERATIONS/DATE
DWG. TYPE
NUMBER
PC-00381
BY/DATE
JOB ORDER / EWO NO.
10-14850-0001
REVISION DESCRIPTION
THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION UNTIL
CERTIFIED AND DATED
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
L:\403011-10152\02 CAD\2.1Drawing\FEL-3\FZ133\P\06_IFB\NATIVE\P2A2015020XC.xls
5
(H/U SCOPE)
CABLE & CONDUIT SCHEDULE
ENGG./DATE
ELECTRICAL ONE LINE DIAGRAM OVERALL POWER SYSTEM
600
-
CCS
THROUGH
PC-00400
ZULF 63/68
REFERENCE DRAWING
DWG CONTROL FOR J.O. 10-14850-0001
4
SUPPLIED BY PUMP VENDOR
600
REVISION VALIDATION
DESIGN CERTIFICATION
(DESIGN AGENCY)
ISSUED FOR SQUAD CHECK
-
2
CABLE SIZING DURING DETAIL DESIGN BASED ON ACTUAL VENDOR DATA.
ISSUED FOR BID
3
SUPPLIED BY PUMP VENDOR
36
CC - Electrical Control (Per SAES-P-104)
APR-24
2
CABLE TYPE MC
6/10kV
(12kV)
-
XLPE
1
PART OF CABLE
P
THIS REVISION NO.
APR-24
2
DSTA (DC-015-007-35)
24
1. PROVIDE GREEN PVC SLEEVE ON CONDUCTOR USED AS GROUND.
B
-
27
P
C
C
XLPE
VOLTS
6/10kV
(12kV)
12
Note
IC - Instrument Cable (Per SAES-J-902)
XLPE
P
LEGEND :
- Conduit (Per SAES-P-104)
TYPE
JB-2007
POWER (ESP MOTOR)
PC-00399
NO. & SIZE
XFR(T)-1007
3(CMP 2"
63SPX2K)
480
BENDS
REMARKS
FEET
METER
INSULATION
(3/C 120mm2
POWER (ESP MOTOR)
PC-00393
SIZE
LENGTH
Ft / m
TOTAL
QTY
POWER (P) - CONTROL (C);
GROUND (G) - INSTRUMENT (I)
P
-
480
TO
T
Y
P
E
ESP JUNCTION BOX
POWER (ESP MOTOR)
PC-00387
T
Y
P
E
CONDUCTORS
STEP-UP TRANSFORMER
TMCX7247
480
CONDUITS
FIBER (F) ; STEEL (S) STL PVC
COATED (SP)
PVC (P), FLEXIBLE (FX)
SAUDI ARABIA
ZULUF
PLANT NO.
INDEX
DRAWING NUMBER
SHEET NO.
408
P
PP-2A2015
020
REV. NO.
Saudi Aramco 2864-ENG (11/10)'D' SIZE
EXCEL