Effective Date: 01 Aug 2023
SURCHARGES & TECHNICAL CHARGES INFORMATION
REF
ITEM
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
S12
S13
S14
S15
S16
S17
S18
S19
S20
S21
S22
S23
S24
S25
S26
S27
S28
S29
S30
S31
S32
TC1
TC2
TC3
TC4
TC5
TC6
TC7
TC8
TG9
TG10
TG11
TO12
TO13
TO14
TO15
TO16
TO17
TO18
TO19
TO20
TO21
TO22
TO23
TO24
TS25
TS26
TS27
TS28
TS29
TS30
TS31
TS32
TS33
TS34
TS35
Weekdays 3-6
Weekdays 6-4
Saturdays 6-12
Saturdays 12-4
Saturdays PM
Sunday / Public Holidays
Minimum Cartage
Diversion
Returned Concrete Handling Fee
Pump Mix
14mm Aggregate
10mm Aggregate
Accelerator
Accelerator
Accelerator
Weekdays
Saturdays
Sunday / Public Holidays
Stand By Fee
Cancellation
Waiting Time Normal Hours
Waiting Time Outside Normal Hours
Extra Distance
Additional Cement
Slump Increase
Administration Fee
Plant Mixing Fee
Manual Handling / Washout
Ice
Waterproofing - KIM Krystol
Waterproofing - Xypex C1000
Waterproofing - Xypex C5000
Standard Compression 3 Cyl Test
Standard Compression 4 Cyl Test
Standard Compression 5 Cyl Test
Minimum Test Charge
Additional Slump Test
Early Age Cylinder Crush
Additional Test – Extra Cylinder
Customer Supplied Cylinder
Grout Testing - Cube 75/50mm
Extra Cube - Cube 75/50mm
Extra Cube - Customer Supplied
Air Content & Concrete Yield
Wet Density Test
Chloride & Sulphate Test
Bleed Test
Volume Permeable Voids Test
Shrinkage Test
Shrinkage Test
Flexural 150mm2 Beams
Laboratory Trial Mix
Maturity Mix Calibration
Schmidt Hammer Test & Report
Fibre Steel Washout Test
Aggregate / Quarry Testing
Late Cancellation of Testing
Slow Testing Surcharge / Waiting Time
Laboratory Opening Fee
After Hours Callout Fee
After Hours Testing Surcharge
After Hours Testing Surcharge
Sunday / Public Holidays
Remote Area Delivery Charge
Inductions
Re-issue of test certificates
Re-printing of test certificates
DESCRIPTION
Extra over m³ rate 3pm - 6pm
Extra over m³ rate 6pm - 4am
Extra over m³ rate 6am - 12pm
Extra over m³ rate 12am - 6am & 12pm - 4pm
Extra over m³ rate 4pm - 12am
Extra over m³ rate
On loads < 3.4m³ up to 20Km calculated on the undelivered part of the load
Distance from initial site in km (charge per m³ based on a minimum of 3.4m³)
Per m³ - On any returned amount > 0.6m³
20MPa mixes only
Extra over 20mm rate
Extra over 20mm rate
Half Rate
Full Rate
Extreme Rate
Plant Opening Fee 6pm - 4am
Plant Opening Fee - Before 6am - After 2pm
Plant Opening Fee Opening Fee
Per Truck, Per Hour - Less than 12 hours' notice for changes to deliveries
Less than 24hr notice cancellation provided
Excess discharge time - normal hours (after 45 mins)
Excess discharge time - outside normal hours (after 45 mins)
For deliveries over 20Kms from nearest BGC plant (based on a minimum of 3.4m³)
Per Kg
Per 10mm increase
Per Copy - Printing of replacement invoices or delivery dockets
Per Load
Manual Handling or Washout Fibres/Oxides fee per load
Per Kg - Dose subject to required and ambient temperature
Extra over m³ rate
Extra over m³ rate
Extra over m³ rate
AS1012 - Set of 3 cylinders - 100mm GP GB
AS1012 - Set of 4 cylinders - 100mm
AS1012 - Set of 5 cylinders - 100mm >= 60MPa or Low Heat
Minimum Test Charge - when not already on site (Loads 2m³ or less)
AS1012.3 - Each additional slump test required
AS1012 - Cylinder report up to 2 days from site test
AS1012 - Each additional cylinder - 100mm
AS1012 - Each customer supplied & delivered cylinder - 100mm
AS1012.1; 5.3; 6; 12.1 - Grout Testing - Cube 75/50mm (Set of 3)
AS1012.1; 5.3; 6; 12.1 - Grout Testing - Cube 75/50mm (each)
AS1012.1; 5.3; 6; 12.1 - Grout Testing - Cube Customer Supplied (each)
AS1012.4&AS1012.5 - Only as additional to standard test
Wet Density Test
AS1012.20 - Acid Soluble Chloride & Sulphates Test
AS1012.6 - Includes site setup and first 3 hours – thereafter $60/hr
AS1012.21 - Permeable voids
AS1012.13 - Set of 3 prisms, manufacture only
AS1012.13 - Set of 3 prisms, manufacture and test
AS1012.11 - Flexural Strength
Laboratory Trial Mix (inc. Air; Yield; up to 6 cylinders)
Maturity Mix Calibration
Schmidt Hammer Test & Report
Fibre Steel Washout Test
Aggregate / Quarry Testing by application
Testing cancellation with less than 4 hours notice
Testing over 30 minutes per test - additional time required
Laboratory Opening Fee - Outside normal working hours
After Hours Callout Fee - outside normal hours extra over testing surcharges
4pm to 6pm Monday to Saturday
6pm to 6am Monday to Saturday
Anytime on Sunday or Public Holiday
Distance > 40kms from GPO
Inductions
Plus additional charge per certificate
Reprinting costs per page
UOM
per m³
per m³
per m³
per m³
per m³
per m³
per m³
per km per m³
per m³
per m³
per m³
per m³
per m³
per m³
per m³
per event
per event
per event
per trk per hr
per event
per minute
per minute
per km per m³
per kg
per 10mm
per copy
per load
per load
per kg
per m³
per m³
per m³
per test
per test
per test
per test
per slump
per cylinder
per cylinder
per cylinder
per test
per cube
per cube
per test
per test
per test
per test
per test
per test
per test
per test
per test
per test
per report
per test
per test
per event
per hour or part thereof
per event
per event
per hour
per hour
per hour
per km
per person per hour or part thereof
admin fee
per page
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
EXC. GST
10.00
40.00
NO CHARGE
40.00
60.00
80.00
40.00
2.00
220.00
4.00
6.00
10.00
5.00
10.00
20.00
3,000.00
3,000.00
3,000.00
400.00
1,000.00
3.00
6.00
2.00
0.30
3.00
5.50
40.00
50.00
2.00
75.00
110.00
120.00
185.00
235.00
285.00
285.00
50.00
80.00
50.00
60.00
180.00
60.00
55.00
250.00
150.00
300.00
300.00
400.00
450.00
900.00
500.00
2,000.00
POA
200.00
500.00
POA
185.00
60.00
1,200.00
500.00
100.00
200.00
300.00
2.00
150.00
10.00
5.50
SPECIAL CONDITIONS OF SALE
Delivery notice requirement for non-standard mixes
• Non-standard mixes may require a notice period of 72 hours for supply subject to the availability of inclusions. Eg: Steel fibres, colours, waterproofing admixtures.
• No claims shall be accepted due to insufficient notice being provided for trial mixes or the issue of mix design information.
Waterproof Concrete
• BGC Concrete does not guarantee the performance of waterproofing additives. Please refer directly to individual suppliers for application and suitability of their product's waterproofing performance.
Contract Documents
• BGC Concrete's 'Terms and Condi ons of Sale' take precedence over any contractual documenta on unless agreed to by BGC Concrete and its Client prior to delivery to site.
Payment Terms and GST
• COD - Payment required prior to delivery.
• Account sales strictly 30 days.
• Payment by account customers using VISA or MasterCard Credit Cards will attract a 1.5% surcharge.
• BGC Concrete does not accept payment by AMEX.
Testing
• Sampling - A random sampling procedure will be adopted and no assurance is given that the first truck will be tested unless otherwise agreed in writing.
• Samples will not be collected on Sundays or Public Holidays, unless requested and agreed to in writing.
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
INC. GST
11.00
44.00
NO CHARGE
44.00
66.00
88.00
44.00
2.20
242.00
4.40
6.60
11.00
5.50
11.00
22.00
3,300.00
3,300.00
3,300.00
440.00
1,100.00
3.30
6.60
2.20
0.33
3.30
6.05
44.00
55.00
2.20
82.50
121.00
132.00
203.50
258.50
313.50
313.50
55.00
88.00
55.00
66.00
198.00
66.00
60.50
275.00
165.00
330.00
330.00
440.00
495.00
990.00
550.00
2,200.00
POA
220.00
550.00
POA
203.50
66.00
1,320.00
550.00
110.00
220.00
330.00
2.20
165.00
11.00
6.05
Download