VOLUME III
DIVISION 21 – FIRE SUPPRESSION
Section
Title
21 05 00
Common Work Results for Fire Protection
21 05 29
Hangers and Supports for Fire Protection Piping and Equipment
21 08 00
Commissioning of Fire Protection
21 10 00
Water-Based Fire Protection Systems
Pages Thru
21 05 00-08
21 05 29-05
21 08 00-10
21 10 00-08
DIVISION 22 - PLUMBING
Section
Title
22 05 00
Common Work Results for Plumbing
22 05 14
Plumbing Specialties
22 05 23
General Duty Valves for Plumbing Piping
22 05 29
Hangers and Supports for Plumbing Piping and Equipment
22 07 00
Plumbing Insulation
22 08 00
Commissioning of Plumbing
22 11 00
Facility Water Distribution
22 13 00
Facility Sanitary Sewerage
22 14 00
Facility Storm Drainage
22 42 00
Commercial Plumbing Fixtures
Pages Thru
22 05 00-08
22 05 14-03
22 05 23-03
22 05 29-05
22 07 00-06
22 08 00-34
22 11 00-08
22 13 00-06
22 14 00-07
22 42 00-03
DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING
Section
Title
23 05 00
Common Work Results for HVAC
23 05 15
Piping Specialties
23 05 23
General Duty Valves for HVAC
23 05 29
Hangers and Supports for HVAC Piping and Equipment
23 05 93
Testing, Adjusting and Balancing for HVAC
23 07 00
HVAC Insulation
23 08 00
Commissioning of HVAC
23 09 14
Pneumatic and Electric Instrumentation and Control Devices for HVAC
(Informational Purposes Only)
23 09 15
Direct Digital Control Input/Output Point Summary Tables
23 09 24
Direct Digital Control System for HVAC (Informational Purposes Only)
23 09 93
Sequence of Operation for HVAC Controls
23 21 13
Hydronic Piping
23 25 00
HVAC Water Treatment
23 31 00
HVAC Ducts and Casings
23 33 00
Air Duct Accessories
23 37 13
Diffusers, Registers and Grilles
23 41 00
Particulate Air Filtration
23 82 00
Heating and Cooling Terminal Units
DIVISION 26 - ELECTRICAL
Section
Title
26 05 00
Common Work Results for Electrical
26 05 02
Electrical Demolition for Remodeling
26 05 04
Cleaning, Inspection and Testing of Electrical Equipment
26 05 19
Low-Voltage Electrical Power Conductors and Cables
26 05 23
Control-Voltage Electrical Power Cables
26 05 26
Grounding and Bonding for Electrical Systems
26 05 29
Hangers and Supports for Electrical Systems
26 05 33
Raceway and Boxes for Electrical Systems
TC-1
Pages Thru
23 05 00-06
23 05 15-02
23 05 23-03
23 05 29-03
23 05 93-05
23 07 00-08
23 08 00-54
23 09 14-08
23 09 15-01
23 09 24-14
23 09 93-04
23 21 13-10
23 25 00-04
23 31 00-07
23 33 00-03
23 37 13-03
23 41 00-02
23 82 00-03
Pages Thru
26 05 00-07
26 05 02-03
26 05 04-02
26 05 19-04
26 05 23-03
26 05 26-03
26 05 29-04
26 05 33-09
26 05 53
26 08 00
26 24 16
26 27 02
26 27 26
26 51 13
Identification for Electrical Systems
Commissioning of Electrical
Panelboards
Equipment Wiring Systems
Wiring Devices
Interior Lighting Fixtures, Lamps, And Ballasts
26 05 53-03
26 08 00-32
26 24 16-03
26 27 02-03
26 27 26-07
26 51 13-07
DIVISION 27 - COMMUNICATIONS
Section
Title
27 05 53
Identification for Communication Systems
27 08 00
Commissioning of Communications
27 10 00
Structured Cabling
27 41 34
Wideband Video Distribution System
Pages Thru
27 05 53-03
27 08 00-16
27 10 00-19
27 41 34-05
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
Section
Title
28 08 00
Commissioning of Electronic Safety and Security
28 31 00
Fire Detection and Alarm
Pages Thru
28 08 00-17
28 31 00-21
DRAWINGS - Bound Separately
GENERAL
Title
COVER SHEET
CODE, EGRESS PLAN, PARTITION TYPES
CONSTRUCTION SITE PLAN
Sheets Thru
T000
G000
G001
ASBESTOS ABATEMENT
Title
SECOND & THIRD FLOOR - ASBESTOS ABATEMENT / DEMOLITION PLAN
FOURTH FLOOR - ASBESTOS ABATEMENT / DEMOLITION PLAN
Sheets Thru
H000
H001
ARCHITECTURAL
Title
SECOND & THIRD FLOOR - DEMOLITION PLANS
FOURTH FLOOR - DEMOLITION PLAN
SECOND & THIRD FLOOR - PLANS & FINISHES
FOURTH FLOOR PLAN
FOURTH FLOOR - ENLARGED PLAN
SECOND & THIRD FLOOR - REFLECTED CEILING PLANS
FOURTH FLOOR - REFLECTED CEILING PLAN & DETAILS
BUILDING SECTIONS, EXTERIOR ELEVATION, DETAILS
INTERIOR ELEVATIONS
INTERIOR SECTIONS & DETAILS
INTERIOR SECTIONS & DETAILS
FINISH SCHEDULE
FOURTH FLOOR - FLOOR & WALL FINISH PLAN
FOURTH FLOOR - FURNITURE, FIXTURE & EQUIPMENT PLANS AND
EQUIPMENT SCHEDULE
DOOR AND FRAME SCHEDULE & DETAILS
TC-2
Sheets Thru
A000
A001
A100
A101
A102
A200
A201
A300
A700
A800
A801
A802
A900
A901
A902
FIRE PROTECTION
Title
SYMBOLS, ABBREVIATIONS, DETAILS, AND NOTES – FIRE PROTECTION
SECOND FLOOR DEMOLITION PLAN – FIRE PROTECTION
THIRD FLOOR DEMOLITION PLAN – FIRE PROTECTION
FOURTH FLOOR DEMOLITION PLAN – FIRE PROTECTION
SECOND FLOOR NEW WORK PLAN – FIRE PROTECTION
THIRD FLOOR NEW WORK PLAN – FIRE PROTECTION
FOURTH FLOOR NEW WORK PLAN – FIRE PROTECTION
Sheets Thru
F000
F100
F101
F102
F200
F201
F202
PLUMBING
Title
SYMBOLS, ABBREVIATIONS, DETAILS, AND SCHEDULES - PLUMBING
SECOND FLOOR DEMOLITION PLAN - PLUMBING
PARTIAL THIRD FLOOR DEMOLITION PLAN - PLUMBING
PARTIAL THIRD FLOOR DEMOLITION PLAN - PLUMBING
PARTIAL FOURTH FLOOR DEMOLITION PLAN – PLUMBING
PARTIAL FOURTH FLOOR DEMOLITION PLAN – PLUMBING
SECOND FLOOR NEW WORK PLAN - PLUMBING
PARTIAL THIRD FLOOR NEW WORK PLAN - PLUMBING
PARTIAL THIRD FLOOR NEW WORK PLAN - PLUMBING
PARTIAL FOURTH FLOOR NEW WORK PLAN – PLUMBING
PARTIAL FOURTH FLOOR NEW WORK PLAN – PLUMBING
WASTE AND VENT ISOMETRICS – PLUMBING
DOMESTIC WATER ISOMETRICS – PLUMBING
Sheets Thru
P000
P100
P101
P102
P103
P104
P200
P201
P202
P203
P204
P300
P301
HEATING, VENTILATING AND AIR CONDITIONING
Title
ABBREVIATIONS, SCHEDULES, AND SYMBOLS - HVAC
THIRD FLOOR DEMOLITION PLAN - HVAC
FOURTH FLOOR DEMOLITION PLAN - HVAC
THIRD FLOOR NEW WORK PLAN - HVAC
FOURTH FLOOR NEW WORK PLAN - HVAC
ENLARGED SCALE PLANS - HVAC
SECTIONS - HVAC
PIPING SCHEMATICS - HOT WATER - HVAC
PIPING SCHEMATICS - CHILLED WATER - HVAC
DUCT RISER DIAGRAM - HVAC
DETAILS - HVAC
Sheets Thru
M000
M101
M102
M201
M202
M300
M400
M500
M501
M502
M900
ELECTRICAL
Title
ABBREVIATIONS, SCHEDULES, AND SYMBOLS – ELECTRICAL
SECOND FLOOR DEMOLITION PLAN – ELECTRICAL
THIRD FLOOR DEMOLITION PLAN – ELECTRICAL
FOURTH FLOOR DEMOLITION PLAN – ELECTRICAL
SECOND FLOOR NEW WORK PLAN – ELECTRICAL
THIRD FLOOR NEW WORK PLAN – ELECTRICAL
FOURTH FLOOR NEW WORK PLAN – ELECTRICAL
PANEL SCHEDULES – ELECTRICAL
PANEL SCHEDULES – ELECTRICAL
DETAILS – ELECTRICAL
Sheets Thru
E000
E100
E101
E102
E200
E201
E202
E800
E801
E900
TC-3