PROCESS GROUPS INITIATING 4.1 4.2 INTEGRATION Develop Project Charter PRACTICE GUIDE PROCESSES FLOW STAKEHOLDER Identify Stakeholders Based on the Process Groups: A Practice Guide. Copyright: Project Management Institute, Inc., (2022). All rights reserved. PLANNING 5.2 SCOPE 5.6 Plan Scope Management 5.3 SCOPE 5.8 Sequence Activities 5.10 SCOPE 5.5 5.12 SCHEDULE 5.13 SCHEDULE 5.1 Create WBS EXECUTING Plan Procurement Management 6.5 RESOURCE Acquire Resources 6.3 5.16 COST 5.17 6.6 Manage Quality COMMUNICATIONS Plan Communications Management 5.19 RISK RISK Plan Risk Management Identify Risks RESOURCE Develop Team QUALITY 5.18 RESOURCE Estimate Activity Resources INTEGRATION PROCUREMENT RESOURCE Plan Resource Management Develop Project Management Plan 5.23 6.4 5.15 COST Determine Budget SCOPE QUALITY Plan Quality Management Estimate Costs Estimate Activity Durations Develop Schedule Define Scope 5.14 COST Plan Cost Management Define Activities 5.9 SCHEDULE 5.11 SCHEDULE Plan Schedule Management Collect Requirements 5.4 5.7 SCHEDULE 5.24 STAKEHOLDER Plan Stakeholder Engagement 5.20 5.21 RISK Perform Qualitative Risk Analysis RISK Perform Quantitative Risk Analysis RESOURCE 5.22 Manage Team RISK Plan Risk Responses 6.1 INTEGRATION Direct and Manage Project Work 6.2 MONITORING & CONTROLLING 7.3 INTEGRATION 7.12 6.7 STAKEHOLDER Manage Stakeholder Engagement COMMUNICATIONS Manage Communications PROCUREMENT 6.8 Conduct Procurements RISK Close Project or Phase PROCUREMENT RISK Monitor Risks CLOSING INTEGRATION Control Scope 7.5 STAKEHOLDER Control Procurements Implement Risk Responses 7.10 8.1 SCOPE Monitor Stakeholder Engagement 7.11 6.9 7.4 Validate Scope Manage Project Knowledge 6.10 SCOPE 7.9 SCHEDULE Control Schedule 7.1 INTEGRATION Monitor and Control Project Work 7.6 7.2 7.7 INTEGRATION Perform Integrated Change Control COMMUNICATIONS Monitor Communications COST Control Costs QUALITY Control Quality 7.8 RESOURCE Control Resources PROCESS GROUPS AND THEIR PROJECT MANAGEMENT PROCESSES Copyright: Process Groups: A Practice Guide, Project Management Institute, Inc., (2022). All rights reserved. Explanatory Note: This flow does not replace the need for reading the Process Group Practice Guide. The Practice Guide contains a deep explanation of all processes including Inputs, Tools & Techniques and Outputs that are listed in this flow. Adaptation: Ricardo Viana Vargas Ph.D. Graphic Design: Sérgio Alves Lima Jardim ricardo-vargas.com Download this processes flow at http://rvarg.as/processgroups Become a member of the Project Management Institute (PMI) and download the Practice Guide and other standards at: www.pmi.org