FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 PROJECT Wellhead Control Panel for Salam Gas Plant FAT PROCEDURE Rev Date Description Prepared by Verified by Approved by 00 18-June-2023 Issued for Approval M. Fathy M. Shalaby A. Alaa 01 27-July-2023 Issued for Approval M. Fathy M. Shalaby A. Alaa Page 1 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 Key Information Customer : Khalda Petroleum Company Supplier : Giza Systems Project : Wellhead Control Panel for Salam Gas Plant CLIENT APPROVALS REVIEW CODE APPROVED BY □ WORK MAY PROCEED. Name: REVISE AND RESUBMIT. WORK MAY PROCEED SUBJECT TO INCORPORATION OF CHANGES INDICATED. Signature: Date: 1 □ 2 □ 3 REVISE AND RESUBMIT. WORK MAY NOT PROCEED. □ 4 REVIEW NOT REQUIRED. WORK MAY PROCEED. Page 2 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 TABLE OF CONTENTS 1. GENERAL ......................................................................................................................................... 5 1.1. Introduction ........................................................................................................................................ 5 1.2. Purpose ............................................................................................................................................. 5 1.1 2. Abbreviations ............................................................................................................................... 6 Overview ........................................................................................................................................... 7 2.1 Hardware and Standard Software Tests ....................................................................................... 7 2.2 Application Software Verification .................................................................................................. 7 3. Pre-Requisite ..................................................................................................................................... 8 3.1 System Equipment ....................................................................................................................... 8 3.2 Documentation ............................................................................................................................. 8 3.3 Inspection and Vendor Pre-FAT Testing ....................................................................................... 9 3.4 Test Equipment ............................................................................................................................ 9 4. Personnel Requirements .................................................................................................................. 10 4.1 VENDOR Responsibilities .......................................................................................................... 10 4.2 COMPANY Responsibilities ....................................................................................................... 10 5. Configuration ................................................................................................................................... 11 5.1 Management / Control ................................................................................................................ 11 5.2 System Configuration ................................................................................................................. 11 5.3 Test Configuration ...................................................................................................................... 11 5.4 Simulation .................................................................................................................................. 11 5.5 6. 6.1 5.4.1 Loop Testing ....................................................................................................................... 11 5.4.2 Logic Testing ....................................................................................................................... 11 Test Database............................................................................................................................ 11 Testing ............................................................................................................................................ 12 Structured Testing - WHCP ........................................................................................................ 12 6.1.1 Test Plan ............................................................................................................................. 12 6.1.1 Test Duration....................................................................................................................... 12 3-4 working days for 1st Skid, then 1-2 working days for the remaining Skids .................................... 12 6.1.2 Test Location....................................................................................................................... 12 6.1.3 Test Schedule ..................................................................................................................... 12 6.1.4 Mandatory Functional Tests................................................................................................. 12 6.1.5 Control Strategy Verification ................................................................................................ 12 6.2 Unstructured Testing .................................................................................................................. 12 6.3 Retest Method............................................................................................................................ 13 7. Test Documentation ......................................................................................................................... 14 7.1 Test Log..................................................................................................................................... 14 7.2 Test Result................................................................................................................................. 14 Page 3 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 7.3 8. Test Discrepancies..................................................................................................................... 14 Problem Resolution.......................................................................................................................... 15 8.1 Resolution during FAT................................................................................................................ 15 8.2 FAT Suspension / Resumption / Restart ..................................................................................... 15 9. Factory Acceptance Test Report ...................................................................................................... 16 10. FAT Certificate................................................................................................................................. 17 11. Test Forms and Record ................................................................................................................... 18 11.1 Bill of Materials Check ................................................................................................................ 18 11.2 Skid/Panels Hardware Checks ................................................................................................... 21 11.3 Laptop Hardware Check ............................................................................................................. 25 11.4 Functionality Check .................................................................................................................... 26 11.4.1 SKID-XX ............................................................................................................................. 26 11.4.1.1 Cables Megger Test ..................................................................................................... 29 11.4.1.2 Power Feeders Redundancy Check .............................................................................. 26 11.4.1.3 DCP Electrical/Mechanical Checks ............................................................................... 28 11.4.1.4 Hydraulic Panel Checks................................................................................................ 29 11.4.1.4.1. Pressure Check ............................................................................................................ 29 11.4.1.4.2. Equipment’s Checks ..................................................................................................... 30 11.5 Loop Check................................................................................................................................ 32 11.5.1 SKID-XX ............................................................................................................................. 32 12. 11.5.1.1 Analog Input ................................................................................................................. 32 11.5.1.2 Digital Input .................................................................................................................. 34 11.5.1.3 Digital Output ............................................................................................................... 35 Appendix 1 –HW IO Loop Check Record.......................................................................................... 36 13. Appendix 2 – HMI Display Check Record ......................................................................................... 36 14. Appendix 3 – Deficiency Log ............................................................................................................ 36 15. Appendix 4 – DCP Continuity Record ............................................................................................... 36 Page 4 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 1. GENERAL 1.1. Introduction Khalda Petroleum Company (KPC) is a joint venture between Apache Corp and the Egyptian General Petroleum Corporation (EGPC). Located in the Western Desert of Egypt. 1.2. Purpose This document defines the criteria and administrative details associated with the performance of the Factory Acceptance Test (FAT) that will be conducted as part of the project. This document describes the conditions, requirements, plans, procedures, success criteria and responsibilities for performance of the FAT. This document will be used to guide and control the performance of the FAT. It will also be used as the basis for monitoring progress and for determining satisfactory completion of the FAT. Page 5 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 1.1 Abbreviations RTU 2oo3 AC AI AI-R CAT 6 DC DCS DI DI-R DO DO-R DSA EMI FTE HART HDD HDPB HMI I/O IP IS LED NEMA Non-IS PC PCI PV RAID RAM RDIMM RH RTD SCADA STP TCP/IP UPS USB DCS FAT F&G HART HCF IOM SAT Remote Terminal Unit 2 out of 3 Alternating Current Analogue Input Analogue Input – Redundant Category 6 Direct Current Distributed Control System Digital Input Digital Input – Redundant Digital Output Digital Output – Redundant Distributed System Architecture Electromagnetic Interference Fault Tolerant Ethernet Highway Addressable Remote Transducer Hard Disk Drive Horizontal DC Power Bus bar Human Machine Interface Input/Output Ingress Protection or Internet Protocol Intrinsic Safety Light Emitting Diode National Electrical Manufacturers Association Non-Intrinsically Safe Personal Computer Peripheral Component Interconnect Process Variable Redundant Array of Independent Disks Random Access Memory Registered Dual Inline Memory Module Relative Humidity Resistance Temperature Detector Supervisory Control and Data Acquistion Shielded Twisted Pair Transmission Control Protocol / Internet Protocol Uninterruptable Power Supply Universal Serial Bus Distributed Control System Factory Acceptance Test Fire and Gas Highway Addressable Remote Transducer Protocol HART Communication Foundation Input/Output Module Site Acceptance Test Table 1 Abbreviation Table Page 6 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 2. Overview The Factory Acceptance Test consists of the following phases: 2.1 Hardware and Standard Software Tests • • • • Visual inspection of the Hardware for conformance to drawings, appearance of equipment and part numbers in accordance with Bill of Materials. Fault Recovery Tests will be conducted as defined in this document. Demonstration of the proper functioning of all hardware and standard software functions using functional tests defined in this document. Earthing and Power Up checks for all hardware. 2.2 Application Software Verification • • • • • • • Verification of the Network Configuration Point database Control Schemes Logics tests HMI Graphic Displays & Display Navigation Offline configuration database checks Page 7 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 3. Pre-Requisite 3.1 System Equipment The following equipment will be tested during the FAT: • Skid • RTU Panel including HMI • Engineering Laptops • DC panel • Hydraulic panel 3.2 Documentation The FAT will be conducted based on the following documents. Document Number Document Description 1. IDS0223-DWG-300 System Overview 2. IDS0223-ENG-200 RTU Bill of Materials and Datasheets 3. IDS0223-ENG-210 Hydraulic Bill of Materials and Datasheets 4. IDS0223-ENG-220 Solar Bill of Materials and Datasheets 5. IDS0223-CLC-400 Solar Calculations 6. IDS0223-CLC-410 Hydraulic System Calculations 7. IDS0223-ENG-210 Hydraulic Function diagram (P&ID) 8. IDS0223-DWG-310 Skid Layout 9. IDS0223-DWG-320 RTU Panel GA&IA drawings 10. IDS0223-DWG-330 Power Panel GA&IA drawings 11. IDS0223-PRC-500 FAT Procedure Page 8 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 3.3 Inspection and Vendor Pre-FAT Testing VENDOR will conduct Pre-FAT as per approved FAT procedure for Hardware and Software configuration. Pre-FAT will be trial run of the FAT. Deficiency Log will be generated and addressed if any deficiency found. Before commencing the FAT activities, the Skid/PLC/DCP/HP Panels will be installed with earth/grounding cables and communication cables connected, powered up and Pre-FAT tested. Inspection will be conducted before FAT as per COMPANY Inspection form. Pre-FAT records will be generated based on the test results. VENDOR will maintain the deficiency / action list until all items have been resolved. Pre-FAT results will be compiled and submitted at the time of SRR (System Readiness Review). SRR will be planned and conducted after completion of Pre-FAT and prior to FAT. SRR will be successfully completed after written confirmation from COMPANY on deficiency / action list. WHCP will be verified as being ready for formal testing as a requirement of the SRR. After inspection and successful completion of SRR, system will be ready for FAT. 3.4 Test Equipment During FAT, the following test equipment, calibrated in accordance with international standards, will be used to simulate the process variables or to measure output values. Equipment Quantity Digital Multi-meter 3 4-20 ma DC current source 3 Megger cables Tester 1 Table 2 List of Test Equipment Page 9 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 4. Personnel Requirements 4.1 VENDOR Responsibilities VENDOR will provide the personnel, documentation and approved test equipment to conduct the Factory Acceptance Test. Technical personnel from the vendor’s engineering team will be responsible for running structured tests. The personnel shall be capable of determining and resolving the root cause of any technical problem encountered during FAT, within the scope of FAT. VENDOR Personnel: • Project Manager: Project Management • Team Leader: FAT Management • Engineering Team: Running tests and resolving problems • Technicians: Electrical wiring connections 4.2 COMPANY Responsibilities COMPANY will provide sufficient personnel familiar with the plant operations and instrumentation to witness tests performed by VENDOR in accordance with approved test procedures. The personnel made available must be authorized to sign acceptance at each stage of testing. COMPANY Personnel: • Responsible Test Witness Leader • Responsible Test Witness Engineers Page 10 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 5. Configuration 5.1 Management / Control The FAT will be conducted as per the approved FAT procedure. Each action will be performed as indicated in the test procedure. Results will be documented as an observation. For all successful tests, the test sheet will be marked as “OK”. Changes to hardware and software will be documented in the deficiency Log sheet. The deficiency log sheet will be attached to the test sheets and will comprise a complete record of all observation during FAT. 5.2 System Configuration The following equipment will be tested for complete Hardware and Software functionality: • Skids • RTU Panels • HMI • Hydraulic Panels • Power Panels 5.3 Test Configuration For any configuration change during FAT like Hardware/Software configuration deviation, operation and performance deviation will be documented in sufficient detail. The effect of each deviation and requirements will be described in detail. The following items will be included: • Hardware / Software Configuration deviation • Operational and performance deviations • Reason for each deviation and affected requirements 5.4 Simulation Since an entire set of actual field devices cannot be connected and used for process simulation during FAT, simulation equipment will be used for unconnected Hardwired IOs. 5.4.1 Loop Testing All I/Os will be tested using the following simulation equipment: • AI simulation: 4-20 mA generator • DI simulation: Jumper • DO simulation: Multi-meter 5.4.2 Logic Testing During logic testing, analogue and digital inputs/outputs will be simulated from the system. 5.5 Test Database The FAT will be conducted with the latest approved database from the COMPANY. Any database change during FAT will be documented with sufficient details. The effect of each deviation and requirement on system performance will be studied and described in details. This includes replacement / addition / deletion of tags / tag parameters. Page 11 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 6. Testing The system to be tested during FAT comprises of all Hardware and Software as per the approved Bill of Materials documents and approved configuration design from COMPANY. The equipment will be staged and integrated in accordance with the minimum system architecture requirements. 6.1 Structured Testing - WHCP Test Plan 6.1.1 The structured testing will be conducted as per test forms given in Appendix 01 to 5. 6.1.1 Test Duration 6.1.2 Test Location 10-15 working days The test shall be held at Giza Systems’ FAT Area located in Ismailia Free Zone, Ismailia, Egypt. Test Schedule 6.1.3 The daily FAT schedule shall be as follows: From 8:00 AM 8:30 AM 12:00 PM 1:00 PM 4:30 PM To 8:30 AM 12:00 PM 1:00 PM 4:30 PM 5:00 PM Activity Daily Activity Review Testing Lunch Break Testing Progress Review for the Day Table 3 Test Schedule 6.1.4 Mandatory Functional Tests The following will be the mandatory tests during the FAT: • • • • Visual Inspection Power supply redundancy test Loop Test Hydraulic panel functionality 6.1.5 Control Strategy Verification Control Strategy Verification will be performed by using simulation software. Simulation software will simulate field signals, to verify configuration of control strategies as per approved design input. 6.2 Unstructured Testing Any unstructured test or any test outside the approved FAT procedure will be conducted after FAT conclusion. The effect of any unstructured test on system performance will be studied and discussed before performing any such test. Page 12 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 6.3 Retest Method Any discrepancy found during testing, will be corrected by VENDOR Engineers. The retest will be conducted as per FAT procedure. Page 13 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 7. Test Documentation 7.1 Test Log All identified tests will be performed 100% to ensure the integrity of Hardware and Software. Each action will be performed as indicated in the test procedure with the result observed. The FAT Test Sheets will be marked “OK” for each successful test and will be marked “NOT OK” for any unsuccessful test and an entry will be made in the Deficiency Log Sheet. 7.2 Test Result At the end of the FAT, the hardcopy of Deficiency Logs & Test Sheets will be generated as a FAT record. All test results / records will be signed by VENDOR and COMPANY representatives. 7.3 Test Discrepancies FAT discrepancies will be documented in the form of FAT Deficiency Log Sheet. The Deficiency Log will note the date of occurrence of a problem, problem report number, description of problem, action taken to correct the problem, status of resolution, and date of resolution. Deficiency log will also record all changes to hardware and software. Copy of deficiency log will be included in Final FAT document. The format of the deficiency log sheet will be provided at the time of FAT. Page 14 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 8. Problem Resolution 8.1 Resolution during FAT The FAT will be performed as per approved FAT procedure. Test discrepancy observed during the test will be logged in Deficiency Log Sheet. If the deficiency is due to VENDOR, VENDOR engineer will rectify the fault. Status will be updated to COMPANY to enable them to repeat the test. Acceptance of deficiency rectification will be signed by COMPANY and VENDOR authorized representatives. If the above mentioned re-test fails, then this test will be rescheduled at a later time. On successful completion of a test, the test sheet will be marked as “OK”. If the deficiency is due to new requirements from the COMPANY, it will be recorded in the log sheet as ‘Not in Scope’. If VENDOR accepts to implement the same, it will be recorded as ‘Accepted’, and if not accepted, the same will be recorded as ‘Not Accepted’. For such additional customer requirement, a formal Change Order Log will be raised, as defined in contract, to identify the time impact and cost impact wherever applicable. All parties will agree the Deficiency Logs and Change Order Log and depending upon the scale of the change it will either be implemented before the end of the FAT, or completed on site 8.2 FAT Suspension / Resumption / Restart If it is seemed impossible to continue the test, the test will be terminated. If, on the contrary, it is possible to continue, a new test date will be scheduled. If the test is not acceptable, the test sheet will not be signed off. Page 15 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 9. Factory Acceptance Test Report Upon successful completion of all tests, COMPANY and VENDOR authorized representatives will sign an Acceptance Certificate. The Deficiency Log will be attached to the test sheets and will comprise a complete record of all faults discovered during the FAT. The following records will be generated during the FAT: • FAT Certificate • Deficiency Log • Test Sheets • Final FAT meeting MOM • Copy of Markups Page 16 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 10. FAT Certificate Giza Systems FACTORY ACCEPTANCE TEST CERTIFICATE THE UNDERSIGNED HAS INSPECTED AND TESTED THE WELL HEAD CONTROL PANEL AND ACCEPTS THAT THE RTU MANUFACTURED FOR WELLHEAD RTU FOR SALAM PLANT HAS BEEN BUILT TO THE AGREED SPECIFICATIONS, VARIATIONS AND IS FULLY FUNCTIONING TO MEET THE REQUIREMENTS OF CUSTOMER P.O NO. 85798 FAT LOCATION : Giza Systems Free Zone (Ismailia) Start Date End Date -------------- ------------ For For KPC Giza Systems Title: Title: Date: Date: Page 17 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11. Test Forms and Record 11.1 Bill of Materials Check Skid/Hydraulic Panel Bill Of Materials Purpose The purpose of this test is To verify that all Hardware ordered for the project is available installed Pre-requisite Approved Bill Of Materials Document shall be available Reference Document System Architecture Skid Layout RTU Bill of Materials Hydraulic Panel Bill of Materials DCP/Solar System Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 Detail Test Item OK OK with Comments NOK RTST OK Visually examine of all materials in accordance with Bill of Material document. Upon visual inspection the verified items will be marked in the BOM document Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 18 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 Power Panel & Solar System Bill Of Materials Purpose The purpose of this test is To verify that all Hardware ordered for the project is available installed Pre-requisite Approved Bill Of Materials Document shall be available Reference Document System Architecture Skid Layout RTU Bill of Materials Hydraulic Panel Bill of Materials DCP/Solar System Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 Detail Test Item OK OK with Comments NOK RTST OK Visually examine of all materials in accordance with Bill of Material document. Upon visual inspection the verified items will be marked in the BOM document Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 19 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 RTU Panel and Laptops Bill Of Materials Purpose The purpose of this test is To verify that all Hardware ordered for the project is available installed Pre-requisite Approved Bill Of Materials Document shall be available Reference Document System Architecture Skid Layout RTU Bill of Materials Hydraulic Panel Bill of Materials DCP/Solar System Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 Detail Test Item OK OK with Comments NOK RTST OK Visually examine of all materials in accordance with Bill of Material document. Upon visual inspection the verified items will be marked in the BOM document Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 20 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.2 Skid/Panels Hardware Checks Skid -- of 26 Purpose To verify that the skid including the Hydraulic, DCP, and PLC panels are built as per approved skid layout and GA&IA drawings and components are configured and supplied in accordance with the hardware manufacturing specifications. Pre-requisite Hardware and Approved drawings issued for construction shall be available Reference Document System Architecture Skid Layout RTU Panels drawings Power Panel Drawing Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 1.2 Detail Test Item OK OK with Comments NOK RTST OK Verify Skid Hardware and design is as per approved Drawings Verify Bill of Material (BOM) 1.3 Verify Skid Exterior free of significant marks/scratches 1.4 Verify proper opening and closing of doors and handle Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 21 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 RTU -- of 26 Purpose The purpose of this test is to verify and document that all the Hardware are installed Pre-requisite Hardware and Approved drawings issued for construction shall be available Reference Document System Architecture RTU Panels drawings Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 1.2 1.3 1.4 1.5 1.6 Detail Test Item OK OK with Comments NOK RTST OK Verify Panel Hardware and design is as per approved Panel Drawings Verify Bill of Material (BOM) Verify Panel Exterior free of significant marks/scratches Verify proper opening and closing of doors and handle locks Verify Panel and all components are correctly labelled Check the distribution of System Power (12V DC) and (24V DC) Power Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 22 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 Power Panel -- of 26 Purpose The purpose of this test is to verify and document that all the Hardware are installed Pre-requisite Hardware and Approved drawings issued for construction shall be available Reference Document System Architecture Power Panels drawings Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 1.2 1.3 1.4 1.5 1.6 Detail Test Item OK OK with Comments NOK RTST OK Verify Panel Hardware and design is as per approved Panel Drawings Verify Bill of Material (BOM) Verify Panel Exterior free of significant marks/scratches Verify proper opening and closing of doors and handle locks Verify Panel and all components are correctly labelled Check the distribution of System Power (24V DC) Power Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 23 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 Hydraulic -- of 26 Purpose The purpose of this test is to verify and document that all the Hardware are installed Pre-requisite Hardware and Approved drawings issued for construction shall be available Reference Document System Architecture Skid Layout Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 1.2 Detail Test Item OK OK with Comments NOK RTST OK Verify Panel Hardware and design is as per approved Panel Drawings Verify Bill of Material (BOM) 1.3 Verify Panel Exterior free of significant marks/scratches 1.4 Verify proper opening and closing of doors and handle locks 1.5 Verify Panel and all components are correctly labelled Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 24 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.3 Laptop Hardware Check EWS- -- of 4 Purpose The purpose of this test is to verify and document that all the Work station PC/Laptop Hardware are installed, configured and working properly Pre-requisite Windows 10 Operating System must be loaded on all the Work station PC’s/Laptops Reference Document System Architecture Bill of Materials Test Procedure Required TEST Result No. Test# 1 1.1 Verify Manufacture , Model no SIMATIC Field PG M6 Comfort 1.2 Verify Hard disk Capacity and specifications 512 MB 1.3 1.4 1.5 Detail Test Item Verify RAM details Verify presence of DVD Drive Verify operating system OK OK with Comments NOK RTST OK 8GB Win 10 Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 25 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.4 Functionality Check 11.4.1 SKID-XX 11.4.1.1 Cables Megger Test Skid – of 26 Purpose The purpose of this test is to verify that all cables (power and control cables) insulation is working properly. Pre-requisite Power Panel Drawing and RTU Panels drawings shall be available. Reference Document System Architecture Power Panel Drawing RTU Panels drawings Test Procedure TEST Result No. Test# 1 1.1 1.2 1.3 1.4 1.5 Detail Test Item OK OK with Comments NOK RTST OK Disconnect the cable wires from both ends. Connect one of the megger’s leads to a ground connection. Connect the other megger lead to the cable conductor. Apply the required voltage. Record the ohm reading appears in the megger device. Apply this test for all cables. 1.6 Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 26 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.4.1.2 Power Feeders Redundancy Check RTU – of 26 Purpose Pre-requisite Reference Document The purpose of this test is to verify that the Power supply redundancy is working properly Controller & Station must be Energized. Test Procedure No. Test# 1 1.1 TEST Result Detail Test Item OK OK with Comments NOK RTST OK In the System Panel, verify that the power LED of Controller is healthy. 1.2 Switch off the Primary Power feeder and verify that system is healthy and still working 1.3 Note the power supply failure alarm. 1.4 Repeat above steps for Redundant Power Supply. 1.5 Repeat above steps for Redundant Power Supply. 1.6 Switch off both the power feeders. Observe that the Controller configuration is retained by the Memory Backup. Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 27 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.4.1.3 DCP Electrical/Mechanical Checks DCP -- of 26 Purpose The purpose of this test is to verify that the electrical data of the low voltage panel as per design Pre-requisite Two Temporary feeders to be connected (24 Vdc and 220Vac) Reference Document Power Panel Drawings Power Panel/Solar System Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 1.2 1.3 2 Detail Test Item OK OK with Comments NOK RTST OK Visual Tests Labels Inspection Wiring and connections inspection As per attachment -5 Bus-bars and cables sizes inspection Mechanical Test 2.1 2.2 Check Circuit Breakers Operation –ON, OFF and Manual TRIP Check Power Terminal and Auxiliary Contact 3 Electrical Function Test Electrical test function of all switching devices. Function test of measuring meters and protection devices 3.3 Test control, tripping, closing, Manual/Auto transfer Purpose: Overall acceptance of this module by Customer 3.1 3.2 Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 28 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.4.1.4 11.4.1.4.1. Hydraulic Panel Checks Pressure Check Hydraulic Panel – of 26 Purpose The purpose of this Test is to make sure that there is no leakage from any connection. Pre-requisite Temporary feeders to be connected (24 Vdc) Reference Document WHCP Function diagram Accumulators sizing calculation Hydraulic Panel Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 Detail Test Item OK OK with Comments NOK RTST OK Blind all the outlet pressure connections to the wellhead valves. 1.2 Fill the panel reservoir with about 20-gallon of the suitable hydraulic oil while observing both Level transmitters reading. 1.3 Make sure that all isolating valves are opened. 1.4 Make sure that the circulation valve is closed. 1.5 Put the Motor A-O-M manual switch on OFF Position. 1.6 Connect the supply power to the pump motor. 1.7 Start the pump (Manually & Automatically) and observe the increasing in the hydraulic pressure and make sure that there is no leakage from any connection. Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 29 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.4.1.4.2. Equipment’s Checks HP-01 Purpose The purpose of this Test is to check the function of the valves, pressure transmitters, Accumulators and pumps. Pre-requisite Temporary feeders to be connected (24 Vdc) Reference Document WHCP Function diagram Hydraulic Panel Drawings Accumulators sizing calculation Hydraulic Panel Bill of Materials Test Procedure TEST Result No. Test# 1 1.1 1.2 Detail Test Item Clear all PSD or ESD from the PLC panel. At the starting duty pump will automatically start according to the action of the Low Low-pressure set point. 1.3 Pump should stop when the pressure reach the High pressure set point. 1.4 Decrease the pressure till the Low pressure set point, Duty pump should start. 1.5 After increasing the pressure again, slowly open venting point and observe the performance of the accumulators for compensating the hydraulic pressure leakage. 1.6 Adjust the medium pressure regulators at 3000 PSI (one by one) while observing both Pressure transmitter & Gauge reading. Leave only one regulator in service & isolate the other one by closing its inlet & outlet valves. 1.7 Adjust the Logic pressure regulators at 80 PSI (one by one) while observing both Pressure transmitter & Gauge reading. Leave only one regulator in service & isolate the other one by closing its inlet & outlet valves. 1.8 Charge the fusible loop by pushing the Push to charge pilot valve and observe both pressure transmitter & Gauge reading. 1.9 Open all of SCSSV , SSV & Wing by pulling its pilot valve and observe its pressure transmitter & Gauge reading and adjust the hydraulic timer. 1.10 Simulate the different remote shutdown signals to the panel and observe the hydraulic pressure to Wing , SSV and SCSSV accordingly. 1.11 Try to increase the hydraulic pressure again by using the hand pumps test both safety valves. 1.12 Make sure that the pumps can started / stopped manually. Purpose: Overall acceptance of this module by Customer Page 30 of 36 OK OK with Comments NOK RTST OK FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 31 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.5 Loop Check 11.5.1 SKID-XX 11.5.1.1 Analog Input Analog Input Loop Check Purpose Pre-requisite Reference Document No Test# The purpose of this test is to verify that each Analog input is configured and working properly. The Station must be Open. KPC Hardwired I/O List Interconnection Cable Schedule MTU/RTU Internal Wiring Appendix 1 –HW IO Loop Check Record Test Procedure TEST Result Detail Test Item Pre-FAT OK 1 1.1 Open the graphic display in both Machine and HMI for desired Analog Input in the station. 1.2 Check the reading on the other side (Hydraulic, DCP, RTU panel) or Connect the signal simulator to the terminals corresponding to the selected Analog Input signals as per the wiring details. 1.3 Disconnect the knife edge and Verify and record values of the alarm that appear on the alarm summary (tag, priority and alarm value). The following steps in case of connecting the simulator 1.4 Supply a 4mA signal input with the current source to simulate the 0% value of the input range. Verify that the point value is equal to the Expected Value at 0% and the correct units are displayed. 1.5 Repeat above step with 8, 12, 16 and 20mA signals. 1.6 Simulate a signal that will cause the value of the point to rise above the high alarm limit (if applicable) by 5%. Verify and record values of the alarm that appear on the alarm summary (tag, priority and alarm value). Simulate as per above step for low alarms. 1.7 Check the related alarms and events in the alarm/event window 1.8 Repeat above steps for all Analog Inputs. Purpose: Overall acceptance of this module by Customer Page 32 of 36 NOK FAT RTST OK OK NOK RTST OK FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 Comments: …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 33 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.5.1.2 Digital Input Digital Input Loop Check Purpose The purpose of this test is to verify that each Digital input is configured and working properly. The Station must be Open. Pre-requisite Reference Document No. Test# KPC Hardwired I/O List Interconnection Cable Schedule MTU/RTU Internal Wiring Appendix 1 –HW IO Loop Check Record Test Procedure Detail Test Item OK 1 TEST Result Pre-FAT NOK FAT RTST OK OK NOK 1.1 Open the graphic display in both Machine and HMI for desired Digital Input in the station. 1.2 Check the position of the DI on the other side (Hydraulic, DCP, RTU panel) or Connect a jumper to the terminals corresponding to the selected Digital Input signals as per the wiring details. 1.3 At this point the digital input is set to CLOSE. Verify that the observed status is equal to the expected. Record the status displayed on the form. 1.4 Disconnect the jumper from the terminals. At this point the digital input is set to OPEN. Verify that the observed status is equal to the expected. Record the status displayed on the form. 1.5 Verify alarms, if the digital input is configured for alarms as required. 1.6 Check the related alarms and events in the alarm/event window 1.7 Repeat the above steps for all the Digital inputs Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 34 of 36 RTST OK FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 11.5.1.3 Digital Output Digital Output Loop Check Purpose The purpose of this test is to verify that each Digital output is configured and working properly. The Station must be Open. Pre-requisite Reference Document KPC Hardwired I/O List Interconnection Cable Schedule MTU/RTU Internal Wiring Appendix 1 –HW IO Loop Check Record Test Procedure TEST Result No. Test# Detail Test Item Pre-FAT FAT RTST RTST OK NOK OK NOK OK OK 1 1.1 Open the graphic display in both Machine and HMI for desired Digital Output in the station. 1.2 Check the status of the DO on the other side (Hydraulic, DCP, RTU panel) or Connect a Multimeter to the terminals corresponding to the selected Digital Output signals as per the wiring details. 1.3 Open the corresponding Control Module point detail display for the selected Digital output point. 1.4 Force the output signal to ON. Verify that the observed value is 24V DC. Record the value displayed on the digital Multi-meter on the form. 1.5 Repeat above step with output signal as OFF. Verify that the observed value is 0V DC. Record the value displayed on the digital Multi-meter on the form. 1.6 Repeat the above steps for all the Digital outputs Purpose: Overall acceptance of this module by Customer Comments: …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………… Signatures: KPC : ………………………………………………………………………………………………………… Giza Systems : ………………………………………………………………………………………………………… Date : ………………………………………………………………………………………………………… Page 35 of 36 FAT PROCEDURE Customer: Khalda Petroleum Company Giza Project No.: GSFZP01126 Customer PO NO.: 85798 Document No.: IDS0223-PRC-500 Project Title: Wellhead Control Panel for Salam Gas Plant Revision: 1 12. Appendix 1 –HW IO Loop Check Record The detail list will be provided during FAT. 13. Appendix 2 – HMI Display Check Record The detail list will be provided during FAT. 14. Appendix 3 – Deficiency Log 15. Appendix 4 – DCP Continuity Record The detail list will be provided during FAT. Page 36 of 36