Construction of six lane access-controlled Highway from DND Maharani Bagh to Junction with Jaitpur & Pushta Road Section of NH-148NA(Design Ch. 0+000 to 9+000) in the National Capital Territory of Delhi of Hybrid Annuity Mode under Bharat mala Pariyogna Pkg-1. Project Client : NATIONAL HIGHWAY AUTHORITY OF INDIA Consultant : ICT Pvt. Ltd. Contractor: :DRA Infracon Pvt. Ltd. STRESSING RECORD Span No :- P83-P84 Date :- 4/10/2023 Start Time :- 12:25PM Finish Time:- Tendon No: T04 22033956 Gauge No: Jack No: 2 12:50PM Tendon No: 22AA2454, 22AA2444 Jac No: T04' 22AA2370, 21CA3735 Gauge No: 22033955 Ram Reading (mm) Difference (mm) Cumulative Elongation (mm) 50 78 - - 30 100 108 30 30 60 150 136 28 58 Cumulative Elongation (mm) Pressure (kg/cm2) Pressure (kg/cm ) Ram Reading (mm) Difference (mm) 50 70 - - 100 100 30 150 130 30 200 160 30 90 200 165 29 87 Z/C - 30 120 Z/C - 29 116 200 33 - - 200 16 - - 250 56 23 143 250 43 27 143 300 85 29 172 300 73 30 173 350 112 27 199 350 100 27 200 385 134 22 221 385 112 12 212 390 115 3 215 30 Zero correction (mm) Zero correction (mm) 29.0 A. Ram reading @ 50kg/cm2 128 Ram reading @ 50kg/cm2 108 B. Commulative Elongation including zero correction (mm) 221 Commulative Elongation including zero correction (mm) 215 C. Slip at Stressing end (mm) 6 Slip at Stressing end (mm) 7 D. Slip at Dead end (mm) 3 Slip at Dead end (mm) 2 E. Net elongation =B-(C+D) (mm) 212 Net elongation =B-(C+D) (mm) 206 F. Slippage after 24 hrs. (mm) 0 Slippage after 24 hrs. (mm) 0 G. Percentage of elongation 104.05% Percentage of elongation 101.24% H. Percentage of pressure 100% Percentage of pressure 100% Checked by: Name: DRA Representative Name: Independent Engineer Representative's Name: Signature: Signature: Signature: Date: Date: Date: