Saudi Electricity Company الشركة السعودية للكهرباء SEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02 DATE: November 2016 SDCS-02 CONSTRUCTION STANDARD FOR UNDERGROUND DISTRIBUTION NETWORK This specification is property of SEC and subject to change or modification without any notice الشركة السعودية للكهرباء Saudi Electricity Company SEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02 DATE: November 2016G PART 10 INSTALLATION OF 13.8 & 33 KV METERED RING MAIN UNIT SF6 ROOM SUBSTATIONS Page 2 of 10 الشركة السعودية للكهرباء Saudi Electricity Company SEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02 DATE: November 2016G TABLE OF CONTENTS Sr. No. DESCRIPTION PAGE NO. 13.8/33 KV METERED RING MAIN UNIT SF6 ROOM 1 INTRODUCTION 4 2 SERVICE CONDITIONS AND SERVICE PARAMETERS 4 3 REVISION AND ADDITIONS 4 4 DESIGN OF METER ROOM 4 5 CIVIL CONSTRUCTION REQUIREMENTS 5 6 DRAWINGS 6-10 Fig.1 Meter Room 6 Fig.2 Cable trench & Cover 7 Fig.3 Front elevation Fig.4 Lighting arrangement 8 Fig.5 Fig.6 Window Details 9 Fig.7 Foundation Plan Fig.8 Roof Slab Plan 10 Fig.9 Tie Beam Detail Fig.10 Roof Beams detail 10 Door Details Fig.11 Column and foundation detail 10 Page 3 of 10 Saudi Electricity Company SEC DISTRIBUTION CONSTRUCTION STANDARD 1 الشركة السعودية للكهرباء SDCS-02 DATE: November 2016G Introduction This construction standard specifies the construction design of 13.8 & 33 KV Metered Ring Main Unit SF6 Room Sub-station. This standard is intended to assist the field engineers and technicians to achieve unified standard in construction to ensure a satisfactory and economical level of service without operation restrictions so that the operational errors are minimized for safety and reliability of the system. 2 Service conditions and system parameters For construction and installation of Drawings, the service conditions and system requirements shall be as given in the latest revision of SEC general requirements for all Equipment/Material specification No. 01-SDMS-01 (latest revision). This SDMS shall also be read in conjunction with SEC Purchase Order (PO) requirements. 3 Revision and additions. This construction standard is subject to revision as new material and methods of construction are developed. The latest revision of existing Drawings shall be revised if feasible and new drawings needs to be developed involving work expansion / modification. 4 Design of Meter Room 4.1 The following points are required to be considered at site during the selection of Metered Ring Main Unit Room Design: 4.1.1 The minimum inner dimensions of the room shall be 5000mm x 4000mm to install Meter Ring Main Unit into on RMU’s inside the room. 4.1.2 Room should be easily accessible without any obstruction. 4.1.3 Meter Room shall not be located on the top of sewerage system or water tanks. However, in case if it is not possible to avoid such service the standard height of the room and trench depth must be maintained (as shown in drawing). 4.2 Door and Cable entry pipes: 4.2.1 Access to the room shall be from the front by means of hinged metal doors, fitted with a heavy-duty locking device to secure them at closed position and one stainless steel hasp set for separate SEC standard pad locking. 4.2.2 Door shall be opened to outside the room either to the right or left hand side. It shall be provided with door stoppers and locking at open position to protect from swinging in order to protect the energy meter box to be fixed on the right side of the front wall as well as to avoid accidents. 4.2.3 All door hinges and its fixing bolts & nuts shall be concealed and made of rigid material. 4.2.4 Locking shall be as follows: Handle shall be high grade stainless steel. Page 4 of 10 Saudi Electricity Company SEC DISTRIBUTION CONSTRUCTION STANDARD الشركة السعودية للكهرباء SDCS-02 DATE: November 2016G Shall be operated by Central handle lock by using SEC standard key or pad lock according to SEC specification SEC-02-02 latest revision. 4.2.5 The door shall be made of steel 2500mm wide and 3498mm high excluding the door frame. 4.2.6 Ventilation louvers shall be shall be provided as shown in figure 5. 4.2.7 Door shall be bonded to any metal framework by a bolted removable 35 mm2 tinned copper braid. 4.3 For the entry & exit of SEC Cable in to and out of the meter room shall be 4 PVC pipes of 150mm diameter in compliance with latest revision of relevant SEC Specification shall be provided. 4.4 Reinforced Concrete Cable Trench: 4.4.1 Reinforced Concrete Cable Trench 15cm thick shall be provided in the room as shown in figure 1 & 2. The Trench shall be 600mm wide and 1300mm deep as covered by removable Checkered steel plate. 4.4.2 Steel reinforcement 10mm diameter 20cm C/C on both directions to be provided as reinforcement for concrete trench walls and bottom. 4.4.3 Steel angel LS to be fixed on the Concrete trench edge. 4.4.4 Lean Concrete 10cm thick to be placed under the trench. 4.4.5 The upper edge of the Cable trench shall be 50mm wider than the standard width of the trench to form a grove of 25x10mm all around the trench for fixing of the Trench Cover as shown in Fig.2. 4.4.6 Finishing Color The interior of the meter room shall be adequately protected against weather changes and painted with pure white Color with a smooth surface finish as per SEC Specification 01-SDMS-01 latest revision as refer to (Civil Work Requirements). 4.4.7 The room shall have minimum 2 Lead lamp light as shown in Fig.4. 5 Civil Construction Requirements: All Civil Work shall be done according to SEC Unified (Civil Work Requirement) latest revision. 6 Drawings Fig.1 Fig.3 Fig.5 Fig.7 Fig.9 Fig.11 Meter Room Fig.2 Cable trench & Cover Front elevation Fig.4 Lighting arrangement Door Details. Fig.6 Window Details Foundation Plan Fig.8 Roof Slab Plan Tie Beam Detail Fig.10 Roof Beams detail Column and foundation detail. Page 5 of 10 Saudi Electricity Company SDCS-02 SEC DISTRIBUTION CONSTRUCTION STANDARD DATE: November 2016G B 6200 5000 200 450 GROUND ROD AT EACH CORNER (COPPERWELD, 16mm DIA.) 81 R1 600 G M.R.M.U COMPRESSION CONNECTOR CABLE SCREEN G 81 R1 A CABLE TRENCH DEPTH 1300mm COVERED BY 8mm THICKNESS TRENCH COVER HIGH VOLTAGE ROOM C 450 4000 150 2500x3500mm DOOR OPENING 400 4400 CABLE TRENCH DEPTH 1300mm COVERED BY 8mm THICKNESS TRENCH COVER 3500 200 A 600 81 70mm sq. Ground Conductor 600 R1 150 4000 1000 600 COVERED BY END CAPS COVERED BY END CAPS 200 400 200 1250 200 2500 1250 5400 6200 FIG: 1 - 13.8 / 33KV METERED RING MAIN UNIT (SF-6) ROOM SIZE 5000mm x 4000mm 5200 400 200 2400x1000mm WINDOW WITH VENTILATION COMPRESSION CONNECTOR 5200 400 1300 400 2400 1300 200 200 4400 400 200 400 TRENCH COVER 10 8 TRENCH COVER 8mm THICK (STEEL) FIG 2: CABLE TRENCH & COVER 25 650 ALL PIECES CUT TO EQUAL LENGTH LIFTING HOOK SEC DISTRIBUTION CONSTRUCTION STANDARD 1300 SECTION C 600 650 Saudi Electricity Company SDCS-02 DATE: November 2016G 3500 ASHPALT LEVEL 0.00 METER BOX 600 3500 SCALE 1:100 FRONT ELEVATION 2 STEP-UP Compacted Backfill 2500 600 500 1300 1500 1300 ASHPALT LEVEL 0.00 500 1450 500 1450 ASHPALT LEVEL 0.00 2400 400 400 2500x3500mm DOOR OPENING LED LAMP LIGHT 500x500mm EXHAUST FAN WITH OUTSIDE LOUVERS 1:100 FIG: 4 LIGHTING ARRANGEMENT 500x500mm EXHAUST FAN WITH OUTSIDE LOUVERS LED LAMP LIGHT 5000 FIG: 3 ELEVATION & SECTION 1:100 1:100 SCALE Compacted Backfill SECTION B-B 400 Compacted Backfill 4000 2000 x 3500mm FULLY LOUVERED DOOR 2mm FLY MESH IN ALUMINUM FRAME SCALE ASHPALT LEVEL 0.00 2400 x 1000mm STEEL WINDOW 1400 1200 3500 ASHPALT LEVEL 0.00 FINISH FLOOR LEVEL +50 SEC DISTRIBUTION CONSTRUCTION STANDARD SCALE ASHPALT LEVEL 0.00 400 3600 SECTION A-A 600 600 2 STEP-UP Compacted Backfill 2400 x 1000mm WINDOW WITH STEEL FLY MESH 1300 400 1000 1300 3500 500 1450 500 1450 3600 500 400 4000 1250 150 1250 Saudi Electricity Company SDCS-02 DATE: November 2016G 100 500 400 Saudi Electricity Company SDCS-02 SEC DISTRIBUTION CONSTRUCTION STANDARD 200 10x10x1 ANGULAR BAR (DOOR FRAME) 200 200 200 2mm FLY MESH IN ALUMINUM FRAME 2336 2mm GAP DATE: November 2016G 2mm GAP 2mm GAP PLAN 2500 200 10x10x1 ANGULAR BAR DOOR FRAME 80 80 4-20cm HINGES 2400 80 2 IN ALUMINUM FRAME 50x5mm STEEL SIRIP 2mm FLY MESH 2mm LOUVER 1350 2mm THK. LOUVERS ANGULAR BAR 50x50x5mm PLAN 2mm LOUVER SECTION E-E 2500 SECTION D-D FRONT VIEW FIG: 5 DOOR DETAILS SCALE 1:50 50 1000 2mm FLY MESH IN ALUMINUM FRAME 1000 1200 2mm GAP 1300 646 1000 3500 3498 50 50x5mm STEEL SIRIP 50 2400 50 FRONT VIEW FIG: 6 WINDOWS DETAILS SCALE 1:50 1400 A F1 TB1 C1 400 200 1200 C1 1400 400 200 RB1 1200 1200 450 450 1200 TB2 TB2 1400 1200 B RB2 5000 B SCALE: /m 1000 (TYPICAL) NTS F1 NTS C1 1200 200 400 A GROUND ROD AT EACH CORNER (COPPERWELD, 16mm DIA.) 200 400 1200 C1 1400 TB1 F1 150 400 C1 200 C1 200 400 20 200 RB1 20 400 450 C1 150 200 C1 450 1200 1000 200 RB2 1000 TIE BEAM (TB1) 3500 Y 1000 1200 SCALE: 4000 5000 NTS SCALE: NTS SECTION A-A SCALE: SECTION B-B NTS FIG: 10 ROOF BEAMS DETAIL ROOF BEAM (RB1) 3500 @150mm C.C. 200 1200 C1 400 C1 450 C1 200 Z Z 450 5000 Y Y1 ROOF BEAM (RB2) @150mm C.C. NTS FIG: 9 TIE BEAMS DETAIL SCALE: Y1 C1 TIE BEAM (TB2) @150mm C.C. 200 Z1 5000 10cm THK. LEAN CONCRETE 10cm THK. LEAN CONCRETE 200 10cm THK. LEAN CONCRETE 1200 400 200 RB2 400 SCALE: 200 RB1 400 SECTION Y-Y 200 SECTION Z-Z 200 Depth Varies as per site 1400 1200 300 @ 150mm C.C. @ 150mm C.C. 10cm THK. LEAN CONCRETE SECTION X-X (F1/C1) 300 1050 200 PLAN (F1/C1) 120 200 1400 370 1200 SPECIAL NOTE: REINFORCEMENT COVER WITHIN CONCRETE SHALL BE: SLABS-20mm FOOTINGS-75mm COLUMNS :-40mm OTHERS-40mm NTS FIG: 11 COLUMN AND FOOTING DETAIL 10cm THK. LEAN CONCRETE SECTION Y1-Y1 200 SECTION Z1-Z1 1400 100 Z1 SEC DISTRIBUTION CONSTRUCTION STANDARD FIG: 8 ROOF SLAB PLAN /m RB2 SCALE: FIG: 7 FOUNDATION PLAN 5000 Alternate bend up bars /m F1 RB1 1400 200 400 4000 400 200 450 3500 1200 450 450 500 500 1400 120 400 450 500 1400 /m 200 400 4000 400 200 400 300 @150mm C.C. Saudi Electricity Company SDCS-02 DATE: September 2016G