WBS S11045193 S11126433 kings park project EE316

advertisement
200 kW Solar Farm an Island
Consist of Five villages
A4
A12
B10
C10
A11
B9
C9
A10
B8
C8
A9
B7
C7
A8
B6
C6
A7
B5
A5
D10
D9
D8
D7
D6
A6
A3
B4
B3
C5
D5
C4
D4
C3
D3
A2
B2
C2
D2
D2
A1
B1
C1
D1
E10
E9
E8
E7
E6
E5
E4
E3
E2
g
E1
g
F10
F9
F8
F7
F6
F5
F4
F3
F2
g
F1
Glossary
A1 -. Team formation
A2 - Meet with Stakeholders to define the project requirements
A3 - Research on different type of solar farms
A4 - The study will be based on the reason for solar Farm
A5 - The study will be based on the reason for solar Farm
A6 - The study will be based on the finance/cost of solar farm
A7 - Compile of the research report
A8 - Develop the solar system requirements based on the report
A9 - Meet with the stakeholders to confirm the project requirements
A10 - Compile the project requirements
A11 - Presentation to the management, board on the project requirements
A12 - Project requirements
B1 - Site Selection and assessment (Land)
B2 - Resource assessment
B3 - Technology Selection
B4 - Determine the Autonomous days
B5 - System sizing (Solar sizing, Battery sizing,
inverter sizing, transformer sizing, size of wires)
B6 - Grid Connection – Meeting with Utility companies
for the utilization of transmission lines
B7 - Work on the electrical design, structural design
and grid connection
B8 - Environmental permit for construction
B9 - Lifespan Analysis and Optimization
B10 - Solar Farm Design
C1 - Identify Procurement needs
C2 - Develop procurement strategy
C3 - Market Research and supplier identification
C4 - Request for Proposal
C5 - Bid Evaluation and Supplier selection
C6 – Negotiation
C7 - Contract Award
C8 - Contract Administration
C9 - Monitor Supplier Performance
C10 – Procurement procedure
D1 - Mobilize team Members
D2 - Detail design meeting
D3 - Acquiring of materials
D4 - Site Preparation
D5 - Safety management
D6 – Solar Farm installation
D7 - Monitoring Progress
D8 - Quality assurance and control
D9 - Test and Commission of the solar Farm system
D10 – The complete solar Farm System
E1 - Preparing Solar Farm Components for Inspection
E2 - Safety inspection
E3 - Solar Panel inspection
E4 - Battery Inspection
E5 - Inverters inspection
E6 - Monitoring control Center inspection
E7 - Solar System load test
E8 - Analyzing data for the Solar System
E9 - Compile of the inspection report
E10 - The inspection Report
F1 - Monitoring of the Solar Farm
F2 - Inventory checklist
F3 - Providing information of Vendor Support
F4 - Electrical documentation
F5 - Civil documentation
F6 - Funding Records
F7 - Purchase Records
F8 - Electrical training for the electrician and engineers
F9 - Civil training to the technician looking after the plant
F10 - Project closure and handing over of the project documents