Uploaded by Blessing Muskwe

week 2 evaluation

advertisement
Week 2
WEEK 2
Monday
SUBJECTY AND CLASS
GRADE 4 VPA
STRENGTHS
WEEKNESS
WAYFOWARD
Week 2
Tuesday
SUBJECTY AND CLASS
STRENGTHS
WEEKNESS
WAYFOWARD
GRADE 4 VPA
The lesson was successfully taught as
learners managed to demonstrate the doted
notes on the stave. This was made possible by
the effective use of media by the facilitator
The facilitator failed to manage time for the
lesson as this led to the disturbance of other
lesson.
The facilitator will be time conscious next
time
GRADE 1 VPA
A good rapport was observed between the
facilitator and the learners. Therefore, this
made it easier for the learners to be solving
movement problems doing eurhythmics.
Media was adequate
The lesson was successfully taught as
learners managed to name and identify
computer software. This was made possible
by the effective use of media by the facilitator
Some learners were over excited that they
were not focusing on the main agenda of the
lesson.
The facilitator will have to monitor the
learners extra carefully during group
discussions
Learners were making a lot of noise during
group discussions which ended consuming
time
The facilitator will have to monitor the
learners extra carefully during group
discussions
Most of the learners did well as there were
able to produce patterns using elements of
design. Learners were enjoying the lesson ,
therefore making it easier for them to grasp
the concept
Some few learners were having challenges at
first. However they were later assisted by the
facilitator
The facilitator will have to exercise bringing
different media to the lesson that will suit
every learner
GRADE 3 ICT
GRADE 2 VPA
Week 2
Wednesday
SUBJECTY AND CLASS
STRENGTHS
WEEKNESS
WAYFOWARD
GRADE 4 VPA
The concept on creative processes and
performance in music was conducted
learners managed to identify rests and simple
time signatures. Learners managed to use
rests and time signatures as explained by the
facilitator
The lesson on musical instruments was done
learners managed to compose two bar
melodies with dotted notes and rest and time
signatures as well
Some of the learners were failing to
understand the duration in which they were
supposed to rest they were thought the
crotchet rest is the only rest
The facilitator will make use of percussion
songs and percussion instruments so that the
learners will fully grasp the concept
Some of the learners were not articulating
the beat well on musical instruments because
they did not grasp the concept well
The facilitator will engage the learners that
did not fully grasp the concept in games rile
rhythm clapping so that they will fully grasp
The lesson on computer software was done.
Learners managed to use a computer
keyboard to type their names. The objectives
of the lesson were met as learners managed
to use caps lock and backspace
The lesson on movement to rhymes was
successfully taught as learners managed to
use their bodies in response to the beat. This
was made possible by the effective use of
media by the facilitator
The facilitator did not manage time well as
learners ended extending time to finish their
project
The facilitator will start the project on time so
that learners will keep editing until they make
final product to print
Learners were making a lot of noise during
group dancing which ended consuming time
The facilitator will have to monitor the
learners extra carefully during group
discussions
GRADE 3 VPA
GRADE 1 ICT
GRADE 2 VPA
Week 2
Thursday
SUBJECTY AND CLASS
STRENGTHS
WEEKNESS
WAYFOWARD
GRADE 4 VPA
A good rapport was observed between the
facilitator and the learners. Therefore, this
made it easier for the learners to be able to
draw indigenous musical instrument. Media
was adequate
A good rapport was observed between the
facilitator and the learners. Therefore, this
made it easier for the learners to be solving
movement problems doing eurhythmics.
Media was adequate
The lesson was successfully taught as
learners managed to name and identify
computer software. This was made possible
by the effective use of media by the facilitator
Some learners were over excited that they
were not focusing on the main agenda of the
lesson.
The facilitator will have to monitor the
learners extra carefully during group
discussions
Some learners were over excited that they
were not focusing on the main agenda of the
lesson.
The facilitator will have to monitor the
learners extra carefully during group
discussions
Learners were making a lot of noise during
group discussions which ended consuming
time
The facilitator will have to monitor the
learners extra carefully during group
discussions
Most of the learners did well as there were
able to produce patterns using elements of
design. Learners were enjoying the lesson ,
therefore making it easier for them to grasp
the concept
Some few learners were having challenges at
first. However they were later assisted by the
facilitator
The facilitator will have to exercise bringing
different media to the lesson that will suit
every learner
GRADE 1 VPA
GRADE 3 ICT
GRADE 2 VPA
Week 2
Friday
SUBJECTY AND CLASS
STRENGTHS
WEEKNESS
WAYFOWARD
GRADE 4 VPA
The lesson on musical instruments was done
learners managed to play simple pressure
melodies using dotted notes and rest and
time signatures as well
Some of the learners were not articulating
the beat well on musical instruments because
they did not grasp the concept well
The facilitator will engage the learners that
did not fully grasp the concept in games rile
rhythm clapping so that they will fully grasp
GRADE 4 ICT
The lesson on computer software was done.
Learners managed to create mother’s day
cards. The objectives of the lesson were met
as learners managed to print their mothers
day cards
The lesson on computer software was done.
Learners managed to use a computer
keyboard to type their names. The objectives
of the lesson were met as learners managed
to use caps lock and backspace
The lesson on movement to rhymes was
successfully taught as learners managed to
use their bodies in response to the beat. This
was made possible by the effective use of
media by the facilitator
The facilitator did not manage time well as
learners ended extending time to finish their
project
The facilitator will start the project on time so
that learners will keep editing until they make
final product to print
The facilitator did not manage time well as
learners ended extending time to finish their
project
The facilitator will start the project on time so
that learners will keep editing until they make
final product to print
Learners were making a lot of noise during
group dancing which ended consuming time
The facilitator will have to monitor the
learners extra carefully during group
discussions
GRADE 1 ICT
GRADE 2 VPA
Download