NEOM SFSP - TROJENA CAMP Fire Hydrant System Reports for NEOM Prepared By: MMH 3/31/2024 Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 2 Fire - Fire Sprinkler Hydraulics Calculation Program General Project Data Report General Data Project Title: Designed By: Code Reference: Client Name: Address: Company Name: Company Address: Phone: Building Name: Contact at Building: Address Of Building: NEOM SFSP - TROJENA CAMP HYDRANT..fiw 3/31/2024 NEOM NEOM SFSP - TROJENA CAMP Project File Name: MMH SBC-801, NFPA 14 NEOM Date: Approving Agency: Phone: City, State Zip Code: Representative: City And State: NEOM SFSP - TROJENA CAMP Building Owner: NEOM Phone at Building: City, State Zip Code: SAUDI ARABIA Project Data Description Of Hazard: Light Hazard Design Area Of Water Application: 1 ft² Default Hose K-Factor: 223.61 K Inside Hose Stream Allowance: 0.00 gpm In Rack Sprinkler Allowance: 0.00 gpm Hose Specifications Make: Size: Hose System Type: Wet Maximum Area Per Hose: 1 ft² Default Pipe Material: SCHED 40 WET STEEL Outside Hose Stream Allowance: 0.00 gpm Model: Temperature Rating: 155 F Water Supply Test Data Source Of Information: Test Hydrant ID: Hydrant Elevation: Test Flow Rate: Calculated System Flow Rate: Available Residual Pressure At System Flow: Date Of Test: 0 ft 1000.00 gpm 1000.01 gpm Static Pressure: Test Residual Pressure: Calculated Inflow Residual Pressure: 101.00 psi 87.00 psi 63.83 psi 87 psi Calculation Project Data Calculation Mode: HMD Minimum Residual Pressure: Number Of Active Nodes: Number Of Active Pipes: Number Of Active Hoses: Demand 20.00 psi 13 14 1 Minimum Desired Flow Density: Number Of Inactive Pipes: Number Of Inactive Hoses: 0.10 gpm/ft² 0 0 Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 3 Fire - Fire Sprinkler Hydraulics Calculation Program Fire Hose Input Data Node Input Data Area Group Branch Dia. (in) Hose KFactor (K) Branch Len. (ft) Pressure Estimate (psi) Branch Stnd Fittings Node Elev (ft) Branch NonStnd Fittings (ft) Fixed Flow (gpm) Branch Sprk KFactor (K) Hose ---- ---0.000 223.61 0.0 20.00 ---- 3.94 0.0 0.00 0.00 2 No Discharge ---- ---0.000 N/A 0.0 58.18 ---- -2.95 0.0 0.00 0.00 3 No Discharge ---- ---0.000 N/A 0.0 60.50 ---- -2.95 0.0 0.00 0.00 4 No Discharge ---- ---0.000 N/A 0.0 61.19 ---- -2.95 0.0 0.00 0.00 5 No Discharge ---- ---0.000 N/A 0.0 61.72 ---- -2.95 0.0 0.00 0.00 6 No Discharge ---- ---0.000 N/A 0.0 61.63 ---- -2.95 0.0 0.00 0.00 7 No Discharge ---- ---0.000 N/A 0.0 63.06 ---- -2.95 0.0 0.00 0.00 8 No Discharge ---- ---0.000 N/A 0.0 62.83 ---- -2.95 0.0 0.00 0.00 9 No Discharge ---- ---0.000 N/A 0.0 63.21 ---- -2.95 0.0 0.00 0.00 10 No Discharge ---- ---0.000 N/A 0.0 63.50 ---- -2.95 0.0 0.00 0.00 11 No Discharge ---- ---0.000 N/A 0.0 59.63 ---- 6.56 0.0 0.00 0.00 12 No Discharge ---- ---0.000 N/A 0.0 60.50 ---- 6.56 0.0 0.00 0.00 13 No Discharge ---- ---0.000 N/A 0.0 63.83 ---- 0.00 0.0 0.00 0.00 Node No. Node Description Branch Description 1 Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 4 Fire - Fire Sprinkler Hydraulics Calculation Program Fire Hose Input Data Pipe Input Data Nominal Diameter (inch) Type Group Fitting Data Nominal Length (feet) Fitting Length (feet) Total Length (feet) CFactor (gpm/inc h-psi) SCHED 40 WET STEEL 2.500 0 E 6.56 6.00 12.56 120 3 U/G HDPE 6.000 0 TG 32.81 33.00 65.81 150 3 4 U/G HDPE 8.000 0 E2T 290.35 88.00 378.35 150 4 5 U/G HDPE 8.000 0 2T 224.74 70.00 294.74 150 3 6 U/G HDPE 8.000 0 2E 291.99 36.00 327.99 150 5 6 U/G HDPE 8.000 0 2T 337.93 70.00 407.93 150 5 7 U/G HDPE 8.000 0 2FET 377.30 71.00 448.30 150 6 8 U/G HDPE 8.000 0 3FET 475.72 80.00 555.72 150 8 9 U/G HDPE 8.000 0 T 137.80 35.00 172.79 150 7 9 U/G HDPE 8.000 0 49.21 0.00 49.21 150 9 10 U/G HDPE 8.000 0 E 13.12 18.00 31.12 150 10 11 SCHED 40 WET STEEL 8.000 0 E 9.84 18.00 27.84 120 11 12 SCHED 40 WET STEEL 8.000 0 TGC 9.84 84.00 93.84 120 12 13 SCHED 40 WET STEEL 8.000 0 GC 3.28 49.00 52.28 120 Beg. Node End. Node Pipe Description 1 2 2 Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 5 Fire - Fire Sprinkler Hydraulics Calculation Program Fire Hose Output Data Overall Node Groupings Output Data Pipe Segment Beg. End. Node Node Pipe Type Group Pipe Flow Rate (gpm) Hose Flow At Beg. Node (gpm) Fixed Flow Out (+) In (-) (gpm) (gpm) Beg. Node Residual Pressure (psi) Imbalance Flow At Beg. Node (gpm) 1 2 0 -1000.01 1000.01 0.00 0.00 20.00 2 2 1 3 0 0 1000.01 -1000.01 0.00 0.00 0.00 58.18 0.00082 3 3 3 2 4 6 0 0 0 1000.01 -413.73 -586.29 0.00 0.00 0.00 60.50 -0.00006 4 4 3 5 0 0 413.73 -413.73 0.00 0.00 0.00 61.19 -0.00001 5 5 5 4 6 7 0 0 0 413.73 130.07 -543.80 0.00 0.00 0.00 61.72 0.00005 6 6 6 3 5 8 0 0 0 586.29 -130.07 -456.22 0.00 0.00 0.00 61.63 -0.00002 7 7 5 9 0 0 543.80 -543.80 0.00 0.00 0.00 63.06 -0.00008 8 8 6 9 0 0 456.22 -456.22 0.00 0.00 0.00 62.83 -0.00003 9 9 9 7 8 10 0 0 0 543.80 456.22 -1000.01 0.00 0.00 0.00 63.21 0.00002 10 10 9 11 0 0 1000.01 -1000.01 0.00 0.00 0.00 63.50 -0.00001 11 11 10 12 0 0 1000.01 -1000.01 0.00 0.00 0.00 59.63 0.00008 12 12 11 13 0 0 1000.01 -1000.01 0.00 0.00 0.00 60.50 -0.00004 13 12 0 1000.01 0.00 0.00 -1000.01 63.83 Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 6 Fire - Fire Sprinkler Hydraulics Calculation Program Fire Hose Output Data Overall Pipe Output Data Beg. End. Node 1 2 Nodal KFactor (K) Hose/Fix Elevation Discharge (feet) (gpm) 223.61 3.94 1000.01 0.00 -2.95 0.00 SCHED 40 WET STEEL Residual Nom. Dia. Pressure Inside Dia. (psi) C-Value q (gpm) Q (gpm) Velocity (fps) F. L./ft (psi/ft) Fittings Type-Grp Pipe-Len. Fit-Len. Tot-Len. (ft) PF-(psi) PE-(psi) PT-(psi) 20.00 58.18 6.00 2.469 120 1000.01 1000.01 7.01 2.80222 E 0 6.56 6.00 12.56 35.202 2.983 38.185 2 3 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 58.18 60.50 6.00 6.065 150 0.00 1000.01 4.11 0.03521 TG 0 32.81 33.00 65.81 2.317 0.000 2.317 3 4 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 60.50 61.19 8.00 7.981 150 413.73 413.73 2.65 0.00181 E2T 0 290.35 88.00 378.35 0.684 0.000 0.684 4 5 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 61.19 61.72 8.00 7.981 150 0.00 413.73 2.65 0.00181 2T 0 224.74 70.00 294.74 0.533 0.000 0.533 5 6 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 61.72 61.63 8.00 7.981 150 130.07 130.07 0.83 0.00021 2T 0 337.93 70.00 407.93 0.087 0.000 0.087 3 6 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 60.50 61.63 8.00 7.981 150 586.29 586.29 3.76 0.00344 2E 0 292.00 36.00 327.99 1.130 0.000 1.130 5 7 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 61.72 63.06 8.00 7.981 150 0.00 543.80 3.49 0.00300 2FET 0 377.30 71.00 448.30 1.343 0.000 1.343 6 8 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 61.63 62.83 8.00 7.981 150 456.22 456.22 2.93 0.00217 3FET 0 475.72 80.00 555.72 1.203 0.000 1.203 7 9 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 63.06 63.21 8.00 7.981 150 0.00 543.80 3.49 0.00300 ----0 49.21 0.00 49.21 0.147 0.000 0.147 8 9 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 62.83 63.21 8.00 7.981 150 0.00 456.22 2.93 0.00217 T 0 137.80 35.00 172.79 0.374 0.000 0.374 9 10 0.00 -2.95 0.00 -2.95 U/G HDPE 0.00 0.00 63.21 63.50 8.00 7.981 150 0.00 1000.01 6.41 0.00925 E 0 13.12 18.00 31.12 0.288 0.000 0.288 10 11 0.00 -2.95 0.00 0.00 6.56 0.00 SCHED 40 WET STEEL 63.50 59.63 8.00 7.981 120 0.00 1000.01 6.41 0.00925 E 0 9.84 18.00 27.84 0.257 -4.120 -3.862 Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 7 Fire - Fire Sprinkler Hydraulics Calculation Program Fire Hose Output Data Overall Pipe Output Data (cont'd) Beg. End. Node Nodal KFactor (K) Hose/Fix Elevation Discharge (feet) (gpm) Residual Nom. Dia. Pressure Inside Dia. (psi) C-Value q (gpm) Q (gpm) Velocity (fps) F. L./ft (psi/ft) Fittings Type-Grp Pipe-Len. Fit-Len. Tot-Len. (ft) PF-(psi) PE-(psi) PT-(psi) 11 12 0.00 6.56 0.00 0.00 6.56 0.00 SCHED 40 WET STEEL 59.63 60.50 8.00 7.981 120 0.00 1000.01 6.41 0.00925 TGC 0 9.84 84.00 93.84 0.868 0.000 0.868 12 13 0.00 6.56 0.00 0.00 0.00 0.00 SCHED 40 WET STEEL 60.50 63.83 8.00 7.981 120 0.00 1000.01 6.41 0.00925 GC 0 3.28 49.00 52.28 0.484 2.841 3.325 Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 8 Fire - Fire Sprinkler Hydraulics Calculation Program Fire Hose Output Data Overall Hose Output Data Flowing Hose Node No. Area Group Code Hose KFactor (K) Node Elevation (feet) Residual Pressure (psi) 1 Sub Totals For Non-Group 223.61 3.94 20.00 Totals For All Groups Flowing Area (ft²) Flowing Density (gpm/ft²) Hose Discharge (gpm) 1.00 1.00 1000.014 1000.014 1000.01 1000.01 1.00 1000.014 1000.01 Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 9 Fire - Fire Sprinkler Hydraulics Calculation Program Fire Hose Output Summary Hydraulically Most Demanding Hose Node HMD Hose Node Number: HMD Actual Residual Pressure: HMD Actual GPM: 1 20.00 psi 1000.01 gpm Hose Summary Hose System Type: Specified Area Of Application: Minimum Desired Density: Application Average Density: Application Average Area Per Hose: Hose Flow: Average Hose Flow: Wet 1.00 0.100 1000.014 1.00 1000.01 1000.01 ft² gpm/ft² gpm/ft² ft² gpm gpm Flow Velocity And Imbalance Summary Maximum Flow Velocity ( In Pipe 9 - 10 ) Maximum Velocity Pressure ( In Pipe 1 - 2 ) 6.41 ft/sec 0.82 psi Allowable Maximum Nodal Pressure Imbalance: Actual Maximum Nodal Pressure Imbalance: Actual Average Nodal Pressure Imbalance: Actual Maximum Nodal Flow Imbalance: Actual Average Nodal Flow Imbalance: 0.0001 0.0001 0.0000 0.0008 0.0001 psi psi psi gpm gpm Overall Network Summary Number Of Unique Pipe Sections: Number Of Flowing Hoses: 14 1 Pipe System Water Volume: 5823.15 gal Hose Flow: Fixed Flow: 1000.01 gpm 0.00 gpm Minimum Required Residual Pressure At System Inflow Node: Demand Flow At System Inflow Node: 63.83 psi 1000.01 gpm Elite Software Development, Inc. NEOM SFSP - TROJENA CAMP Page 10 Fire - Fire Sprinkler Hydraulics Calculation Program Fire Hose Output Data Hydraulic Supply/Demand Graph 200 180 160 Pressure psi 140 120 100 101 87 80 60 51 40 20 0 2 4 6 8 10 12 14 Flowrate(x100) gpm Supply Curve Data Static Pressure: 101 psi Test Residual Pressure: 87 psi Test Flow Rate: 1000 gpm Demand Curve Data Calculated Residual Pressure: 63.83 psi Calculated Flow Rate: 1000.01 gpm Excess Available Residual Pressure At Calculated Flow: 23.17 psi 16 18 20