Uploaded by Laizita

Cold Weather Operation Checklist

advertisement
DC 9/80
OPERATIONS MANUAL
II
CHECKLISTS
JAN 21
Cold Weather Operation Checklist
COCKPIT CREW CHECKLIST
DE/ANTI-ICING PROCEDURE
De/Anti-Icing Treatment.....................AS RQD
1/2
2
FLT Recorder/AIDS........................TEST/CKD
AHRS Alignment.............................VERIFIED 1/2
FMS/GPS.....................................CKD/X-CKD PF/PM
1
Emergency Lts.....................................ARMED
1
Cabin Signs............................................ON/ON
1
Pitot & Static Heaters......................ON(CAPT)
1
WINDSHIELD ANTI-ICE Sw.....................ON
ENG SYNC Sel...........................................OFF
1
2
Stall Warning.......................................TESTED
Air Cond Shutoff Sw...............................AUTO
1
Fire Protection Sys..............................TESTED
2
TRP......................................................TESTED
2
Fuel Quantity.......................................___ KGS 1/2
Altimeters...........................QNH/QNH/X-CKD 1/2
1
FUEL Shutoff Levers..................................OFF
1
CABIN PRESS Lever.............................AUTO
2
Takeoff Data (SSW).....................COMPUTED
Cockpit Crew Checklist Completed
If De/Anti-icing Procedure shall be made
at parking gate, refer to De/Anti-Icing
Procedure Checklist
Parking Brakes..............................................SET 1
EFB...........................................FLIGHT MODE 1/2
Pneumatic Pressure.................................___ PSI 1
ENG IGN Sel............................SYS A or SYS B 2
1
Left/Right/ Fuel Tank Pumps........................ON
If LMT WING FUEL is performed
1
Center Fuel Pumps........................................ON
2
Anti Collision Lts..........................................ON
AIR COND SUPPLY Sws............................OFF 2
Thrust Levers..............................................IDLE 2
Door Cue Light...................................CKD OFF 1/2
Before Start Checklist Completed
AFTER START
1
2
2
1
1
1
1
2
1
1/2
IF DE/ANTI-ICE TREATMENT IS APPLIED AT
REMOTE FACILITY:
Flaps/Slats............FULL DOWN/SET FOR T.O
De/Anti-Ice Procedure Checklist Completed
2
TAXIING
1
Static run-up........................................AS RQD
1
APU...........ON/L&R BUS Sws ON (ssw only)
2
APU AIR Sw..............................................OFF
TRP/ART..............................................AS RQD 1/2
V Bugs....................................___/___/___/___
1/2
Flt Instruments/FGS...................................CKD
1/2
FMS/GPS...................................................CKD PF/PM
Autobrake/Autospoiler.........................AS RQD
1/2
T.O. Briefing...............................PERFORMED PF/PM
1
Fuel Heat System.................................AS RQD
1
Cabin Report..................................OBTAINED
Taxiing Checklist Completed
T.O. RWY.......RUNWAY__/ENTRY POINT__
Pretakeoff Check........................PERFORMED
T.O. Data ....................................CONFIRMED
Fuel Balance...............................................CKD
FLAP/SLAT Lever...............................___/EXT
Brake Temperatures...................................CKD
Flight Controls &
Trims.......................CKD FREE MOVEMENT
Ail, Rud & Stab Trim.........ZERO/ZERO/CKD
ENG IGN..................BOTH (OVRD ssw only)
AIR COND SUPPLY Sws...................AS RQD
EOAP.........................................................CKD
Static run-up....................................PERFORM
Before Takeoff Checklist Completed
1/2
1
1/2
1/2
1/2
2
1/2
2
1
1
1/2
PF
AFTER TAKEOFF
2
1
1
2
2
1
IF DE/ANTI-ICE TREATMENT IS APPLIED AT
PARKING GATE:
Flaps/Slats...........FULL DOWN/SET FOR T.O
After Start Checklist Complete
AIR COND SUPPLY Sw(s).........................OFF
CABIN PRESS Lever............MAN/FULL FWD
Airplane Configuration..........................UP/RET
Thrust Levers (If Rqd)................................IDLE
Parking Brake...............................................SET
APU Air Sw..................................................OFF
PROCEED WITH SPRAYING
Report of Treatment..............................OBTAIN
CABIN PRESS Lever...............................AUTO
AIR COND SUPPLY Sw(s).....................AUTO
Flight Cont &Trims..........CKD FULL TRAVEL
BEFORE TAKEOFF
BEFORE START
ENG IGN Sel..............................................OFF
ENG Anti-Ice Sws........................................ON
AIR FOIL Anti-Ice Sw(s)....................AS RQD
AIR COND SUPPLY Sws......................AUTO
Hyd Sys..........................................CKD & SET
APU.....................................................AS RQD
rev 3
2
Brake Temperatures...................................CKD
Landing Gear...............................UP/LTS OUT
AIR COND SUPPLY Sws......................AUTO
FLAP/SLAT Lever...............................UP/RET
FLAP T.O.SEL...................................STOWED
ENG IGN Sel.......................................AS RQD
APU.........OFF/ L/R BUS Sws OFF (ssw only)
Center Fuel Tank Pumps………..……AS RQD
AIR COND SHUTOFF Sw.....................OVRD
Altimeters.................................1013/1013/1013
After Takeoff Checklist Completed
PM
1
1/2
DC 9/80
OPERATIONS MANUAL
II
CHECKLISTS
Cold Weather Operation Checklist
DESCENT
Landing Data (SSW)................COMPUTED
MSA.......................................................CKD
APPR & LND Briefing...........PERFORMED
MDF......................................______/X-CKD
Landing Data...........................CONFIRMED
V Bugs..................................__/__/__/__/__/
Radio Altimeters/Audio Marker.......SET/ON
Hyd Sys......................................SET & CKD
Pressurization.................................CKD/SET
AIRFOIL & ENG Anti-Ice Sws…..AS RQD
Descent Checklist Completed
2
PF/PM
PF/PM
PF/PM
1/2
PF/PM
PF/PM
2
PM
PM
FLAP/SLAT Lever................................15/EXT
Autobreake.................................................OFF
SPEEDBRAKE Lever................................RET
ENG IGN Sel..............................................OFF
Pitot & Static Heaters.................................OFF
AIR FOIL & ENG Anti-Ice Sw.................OFF
WINDSHIELD ANTI-FOG Sw.................OFF
WINDSHIELD ANTI-ICE Sw...........AS RQD
WX Radar...................................................OFF
ENG Run-Up.......................................AS RQD
After Landing Checklist Completed
PARKING
PM
PM
PM
1/2
1
FINAL
Land Gear/Lts………….....DOWN/3 GREEN
AIR COND SHUTOFF Sw………...…AUTO
FLAP/SLAT Lever……………...….___/EXT
SPEEDBRAKE Lever………………….ARM
Autobrake...........................................AS RQD
ENG IGN Sel...........BOTH (OVRD ssw only)
EOAP.......................................................CKD
Final Checklist Completed
rev 3
AFTER LANDING
APPROACH
Cabin Signs..........................................ON/ON
Fuel Sys.....................................................SET
APU.......ON/ L/&R BUS Sws ON (ssw only)
Altimeters.......................___/___/___/X-CKD
Fuel Heat System...............................AS RQD
Approach Checklist Completed
JAN 21
Flaps/Slats...........................................AS RQD
FUEL TANK PUMP Sws....................AS RQD
ENG Anti-Ice Sws......................................OFF
Aux & Trans Hyd Pumps...........................OFF
Parking Brake (Chocks must be
In Place).........................................RELEASED
Parking Checklist Completed
2
2
1
2
1
LEAVING THE AIRPLANE
1/2
PM
PM
PM
PM
1
PM
Emergency Lts............................................OFF 2
EFB.............................................................OFF 1/2
APU.....................................................AS RQD 2
BATT Sw.............................................AS RQD 2
Leaving The Airplane Checklist Completed
Download