Tower 1 Hinjewadi Labour contractor ITC rate Card (Slab/Wall Conduiting) Quantity Quantity As ITC Rate - Amount- Slab & ITC Rate- Slab & Amount-Wall As Per Per W/O-For Wall conduit wall conduit for wall conduit for conduit for Unit W/O-For wall brick for brick mivan RCC mivan RCC work brick work Slab work work work Description of Work Sr. No. ITC of Conduit & Accessories (Slab/Wall Conduiting) 1.01 25mm Conduit 1.01.3 CCTV conduit from ELV riser to Common Area CCTV location 7200 5000 2400 Access Control system conduit from ELV riser to Common Area 1.01.4 CCTV Location 1.01.5 Apartment Lighting & Power 1.01.6 Common Area lobby within Tower 900 900 RMT 19 24 17100.00 21,600.00 56000 2200 14400 900 RMT RMT 19 19 24 24 6500 2700 RMT 18 21 1064000.00 41800.00 0.00 0.00 117000.00 3,45,600.00 21,600.00 0.00 0.00 56,700.00 2126 1800 RMT 18 21 38268.00 37,800.00 6300 1800 RMT 18 21 113400.00 37,800.00 0.00 0.00 0.00 34425.00 13770.00 11115.00 29610.00 31740.00 0.00 20,160.00 7,960.00 7,700.00 17,088.00 1,404.00 17,89,628 7,05,012 1.01.1 FA conduit 1.01.2 VA conduit 1.02 VDP conduit interconnection between VDP IDU & ODU including 1.02.02 gas detector in each apartment ELV conduit from ELVDB to each data point 1.02.03 ELV conduit from ELVDB to each Telephone point point ELV conduit from ELVDB to each TV point 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 RMT 19 24 RMT 19 24 RMT 19 24 20mm PVC MMS Conduit 1.02.01 ELV conduit from ELV shaft to Apartment ELVDB 2.01 2700 1800 900 Electrical Wiring Accessories (Slab/Wall Conduiting) ITC of GI BACKBOX: Note- One coat of Zinc cromate primer 1/2M Gang Backbox 3M Gang Backbox 4M Gang Backbox 6M Gang Backbox 8 Gang Backbox 2295 810 585 1410 1380 1120 398 350 712 54 NOS NOS NOS NOS NOS Total Amount Note: We will provide only ladders, and other necessary tools are in the subcontractor's scope. Monthly reconciliation of materials is required with the monthly Running Account (RA) bill Only one RA bill will be accepted in the first week of each month. RA bills for incomplete work will not be accepted. Personal Protection Equipment (PPE) is within the subcontractor's scope. Payment Teams: Mivan Slab Conduiting 60% against Mivan Box fixing & Slab & wall conduiting 34% against Nylon rope pulling, chock up clearing & Handover to client 5% Retention will deduct in every RA bill 1% TDS will deduct in every RA bill 15 17 19 21 23 18 20 22 24 26 136800.00 95000.00 45600.00 64,800.00 43,200.00 21,600.00