Tower 1 Hinjewadi Labour contractor ITC rate Card (Slab/Wall Conduiting)
Quantity Quantity As
ITC Rate - Amount- Slab &
ITC Rate- Slab &
Amount-Wall
As Per Per W/O-For
Wall conduit wall conduit for
wall conduit for
conduit for
Unit
W/O-For
wall brick
for brick
mivan RCC
mivan RCC work
brick work
Slab
work
work
work
Description of Work
Sr. No.
ITC of Conduit & Accessories (Slab/Wall
Conduiting)
1.01
25mm Conduit
1.01.3 CCTV conduit from ELV riser to Common Area CCTV location
7200
5000
2400
Access Control system conduit from ELV riser to Common Area
1.01.4
CCTV Location
1.01.5 Apartment Lighting & Power
1.01.6 Common Area lobby within Tower
900
900
RMT
19
24
17100.00
21,600.00
56000
2200
14400
900
RMT
RMT
19
19
24
24
6500
2700
RMT
18
21
1064000.00
41800.00
0.00
0.00
117000.00
3,45,600.00
21,600.00
0.00
0.00
56,700.00
2126
1800
RMT
18
21
38268.00
37,800.00
6300
1800
RMT
18
21
113400.00
37,800.00
0.00
0.00
0.00
34425.00
13770.00
11115.00
29610.00
31740.00
0.00
20,160.00
7,960.00
7,700.00
17,088.00
1,404.00
17,89,628
7,05,012
1.01.1 FA conduit
1.01.2 VA conduit
1.02
VDP conduit interconnection between VDP IDU & ODU including
1.02.02
gas detector in each apartment
ELV conduit from ELVDB to each data point
1.02.03 ELV conduit from ELVDB to each Telephone point point
ELV conduit from ELVDB to each TV point
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
RMT
19
24
RMT
19
24
RMT
19
24
20mm PVC MMS Conduit
1.02.01 ELV conduit from ELV shaft to Apartment ELVDB
2.01
2700
1800
900
Electrical Wiring Accessories (Slab/Wall
Conduiting)
ITC of GI BACKBOX: Note- One coat of Zinc cromate primer
1/2M Gang Backbox
3M Gang Backbox
4M Gang Backbox
6M Gang Backbox
8 Gang Backbox
2295
810
585
1410
1380
1120
398
350
712
54
NOS
NOS
NOS
NOS
NOS
Total Amount
Note:
We will provide only ladders, and other necessary tools are in the subcontractor's scope.
Monthly reconciliation of materials is required with the monthly Running Account (RA) bill
Only one RA bill will be accepted in the first week of each month.
RA bills for incomplete work will not be accepted.
Personal Protection Equipment (PPE) is within the subcontractor's scope.
Payment Teams: Mivan Slab Conduiting
60% against Mivan Box fixing & Slab & wall conduiting
34% against Nylon rope pulling, chock up clearing & Handover to client
5% Retention will deduct in every RA bill
1% TDS will deduct in every RA bill
15
17
19
21
23
18
20
22
24
26
136800.00
95000.00
45600.00
64,800.00
43,200.00
21,600.00