CONSTRUCTION OF MOHMAND DAM HYDROPOWER PROJECT REQUEST FOR INSPECTION AND TESTING (RIT) CGGC-DESCON JV Dwg. No.MHP-04-CD-CDB1-07-25a-001-D4 RIT No:MD-LOT4-WPQ-2024-01 Date & Inspection Time : Sr.N B.O. Area / Item Name. Qty. Description of Inspection / Test Activities o Q No. Location 1 Welder Qualification Test For (3G) position (Steel Plate SS400Ti) Muhammad Usama s/o Muhammad Farooq Muhammad Abubakar s/o Ejaz Ahmad Muhammad nawaz s/o Shehab o Din Muhammad khan s/o Muhammad Ashraf Pervaiz Akhtar s/o Muhammad Bakhsh Muhammad zaman s/o Ghulam Abbas Muhammad Islam s/o Fayaz Jalal Ahmad s/o Atta Ullah Jan CGGC-DESCON QA/QC Submitted By: Received by: MDCG CGGC Name: Chen jiawen Sheikh Ali 1 New Workshop 17/05/2024 MDCG Remarks Please Supervise the Welder Qualification Test For 3G Position(SMAW) in New Workshop CNIC no 32303-4720876-5 CNIC no 32303-2413904-1 CNIC no 35102-2930015-9 CNIC no 36602-8434042-3 CNIC no 32303-6505803-1 CNIC no 32303-8161397-7 MDHP-WPQ -01 CNIC no 17102-2702520-7 MDHP-WPQ -07 CNIC no 17103-0429429-3 MDHP-WPQ -08 MDHP-WPQ -02 MDHP-WPQ -03 MDHP-WPQ -04 MDHP-WPQ -05 MDHP-WPQ -06 MDCG JE/Inspector/ Surveyor Geologist /SE PE/M.E/ARE Not Approved/Approved By PE/ RE Date: 16/05/2024 Signature: Contractor received by: *Note: RIT shall be submitted 24 hours before testing and inspection.