Uploaded by jss777

RTP Training Material - MRO May 2024 v2(3)

advertisement
REQUISITION TO PURCHASE TRAINING
JUNE 2024
TRAINING AGENDA
2
•
Safety Share– 2 min
•
Purchase Requisition Process – 15 min
• Creation
• Account Assignment & Attachments
• Approval
• Canceling a Requisition
•
PR-PO Tips – 5 min
•
NIR – New Item Request – 10 min
•
CIR – Change Item Request – 5 min
•
Vendor Add and Change Requests - 15 min
•
Key Contacts – 2 min
•
Q&A – 5 min
•
Appendix
S AF E TY S HARE – TO R N AD OE S
TORNADO SAFETY REMINDERS
Tornadoes are a serious threat
for many areas across the
country. In an average year,
about 1,000 tornados are
reported in the United States,
according to NOAA. It is
important to know about
tornadoes and what to do both
at home and work if there is
one.
1
Understand the difference between a tornado
watch and tornado warning
2
Pick a safe room (usually in a low floor, preferably
a basement if you have one) in your home where it
is safe to go during a tornado
3
At work, know how your employer will inform you
that tornado conditions could be in the area
4
At work, know where the tornado shelter is,
whether onside or offsite
3
Source
Purchase Requisition Over view
A Requestor can be anyone in O-I who has a purchasing requirement. Requistioner is person who is creating the PR.
Requestors need to contact the Purchase Requisitioner and provide the following details:
• Materials and/or services needed and description
• Ex. Material # 51007942, Material description: HEC, FREON, CYL 43.13 KG
• Quantity required in UOM
• Ex. EA, PAA, Pcs
• Delivery date
• Vendor #
• Cost center & GL account #
As a Purchase Requisitioner, you are responsible for creating and updating the purchase requisition in SAP.
Requisitions can be created either Manually or Automatically:
• Manually – A purchase requisitioner goes into SAP and inputs the details of what is required
• Automatically – The purchase requisition is initiated via MRP run based on material master parameters and
requirements set-up in SAP.
4
Purchase Requisition Creation
T-code- (ME51n).
Header & Item Overview:
• Purchase requisitions are characterized by Document Type. Descriptions are included to help requisitioners choose the
appropriate document type based on their specific situation
5 Series PR
4 Series PR
3 Series PR
2 Series PR
Purchasing Groups & Material group:
• Material group is the grouping of materials and services having some
common characteristics and belonging to the same purchasing family.
• Material groups are defined in the family table in the embedded document:
5
Mandatory Fields in Item Overview
Item Number
Short text
Account Assignment Category
Quantity
Ordering UOM
Plant
Price
GLCC
Recipiant
Requsted by
Purchasing group
Purchasing Org
Material group
Account Assignment & Attachments
Account Assignment Tab :
This tab derives how the PO is to be charged, that is which accounts (GL account, cost center) need to be charged when the
incoming invoice or goods receipt are posted.
Attachments:
Quotation or any other awarding email can be added for further reference by clicking Service for
object >create >create attachments.
6
PR Approval
•
•
•
•
T-Code : ME53N
To check the status of the PR approval workflow, navigate to PR header > Release strategy tab.
You can also identify the approver name through workflow>workflow overview.
Once the PR is completely released, it will automatically go to the appropriate buyer’s queue for PO creation. PR’s less
than 10K will go for Auto PO release.
7
Canceling a Requisition
• T-Code ME52N
• Select the line to be canceled & then click on the Bin
•
8
Include cancel reason in header note for the future reference.
and press delete.
PR to PO Tips
• Requestor should select correct PR type based on their requirement as NA buyers are currently receiving 7
series (ZCA) PR and 5 series (ZFO) which are for Non store items.
• 7 Series PR (ZCA) should not be used for any PR creation as this PR type does not have PR release strategy.
• 5 Series PR (ZFO) should be used only for Service PR’s. If GRN is needed for service PO's then item category tab should be empty. If
GRN is not needed for Service PO's then Item category tab "B" should be mentioned
• To prevent automatic purchase order creation, it is important not to include any vendor code when adding
add-ons to purchase requisitions (PRs).
• Example Scenario : PR 4000630539 was raised as an add on PR to the existing PO. But requestor raised this PR 4000630539 with
desired vendor code and also the total PR value is also less than 10K USD. New auto PO got created for this PR and PO triggered to
vendor in daily auto run.
9
NEW ITEM REQUEST – NIR
NIR (New Item Request) is used to create a material code & extend a material code.
T-Code IW51 for New Item request, Extend material, Massive creation.
Notification Type: ZI
NEW MATERIAL: Mandatory fields to be filled & uploaded in the NIR request
• Manufacturer name
• Part Number
• Base Unit, PO Unit of measure
• Material Group Item Cost Unit
• MRP Type, Monthly use
• ROP and Max Unit
• Reorder Point
• Material Description & Quotation
EXTEND MATERIAL: This option is selected to extend a material from one plant to another plant location. Enter all the
mandatory fields as mentioned above. Attach available quotation in the NIR by selecting Service for Object
>create>create attachments. Quotation is Mandatory for NIR.
MASSIVE NIR PROCESS: When creating more than one material, complete the Excel template file for massive Material
Data Creation with all mandatory fields and attach quotation. Excel template embedded here for reference:
10
CHANGE ITEM REQUEST – CIR
CIR (Change Item Request) is used to do changes in a material code
T-Code IW51
Notification Type: ZC
Mandatory fields to be filled & uploaded in the CIR request
• Region
• Country
• SAP Vendor Number & SAP Material Number
• UOM
• Price
• Currency type
• Monthly Use
• Reorder Point & Max Stock
• Lead time
IMPORTANT: As it is a request for ROP and max stock, those fields are very important and always the unit of measure for
them must be the same Base Unit that the materials has assigned.
COMMENTS: Place in comments everything we should know to make the change as if the rounding value should be
changed as well.
Alternate way : Service now request can be raised for Change in material by sending mail to
O-I.Procurement.AM@gbs.O-I.com
11
Vendor Creation
Vendor creation refers to the process of setting up a new vendor in SAP.
• This process involves gathering relevant vendor information, such as legal entity name, address, contact details, tax
identification numbers, bank account information, and any specific contractual terms or agreements.
The following information is required to raise a ticket in service now to create a vendor:
1. Vendor External form
2. W9 for US vendor / W8 for Foreign vendor
3. Sourcing statement in case of Foreign vendor
4. Bank Letter / Void Cheque
5. Industry sector
6. Payment Terms
7. Company code
8. Vendor add Justification
9. Forecast Yearly spend
10. Carrier profile (In case of Transport vendor)
11. Within Canada registration HST/GST No. is mandatory.
Link to raise ticket in service now: Global Vendor Request - O-I Service Portal (service-now.com)
Requestor can also send an email to ProcOps help desk - o-i.procurement.am@gbs.o-i.com
12
Vendor Changes
Vendor Update
• Any change of an existing vendor such as email address, bank account, payment terms or contact number requires a vendor update
• Specific Requirements for email, bank or payment term changes:
•
Email update or Bank update - Request should be received from the existing ID’s of SAP.
•
Payment term – Procurement approval or latest version of signed contract is required.
Vendor Reactivation
• This is the process of reactivating the inactive vendors which are already existing in our database and follow the new vendor creation
procedure.
Vendor Extension
• This is the process of extending an existing active vendor from one purchasing organization to another purchasing organization.
• Only one extension per vendor code can be included in one single Service Now ticket
• If within country extension, no supporting document is required, share the details to procops team to process the request. For other
countries Tax document like mandatory
Requestor Country
Extend country
Documents Required
Vendor Inactivation
• This is the process of inactivating a vendor code from SAP.
• All open POs, PRs, and Invoices must be closed before a vendor can be inactivated.
13
US
CA
CA
US
Brazil
US
Other Foreign
vendor
US
US
US
W8
W8 & Sourcing
statement
CNPJ/ W8 & Sourcing
statement
W8 & Sourcing
statement
No document
required
Key Contacts
Proc Ops (North America):
All buyers have been restructured by commodity per the listing below:
Accounts Payable (North America):
Helpdesk ID for America : O-I.Procurement.AM@gbs.O-I.com is
always The 1st point of contact.
1st Level : Hemanth Kumar :
Hemanth.Kumar.G@o-i.com
Purchasing
Description Buyer Buyer Name
Group
1
Raw Materials A
Navaneeth
2
Energy
A
Navaneeth
3
Packaging
B
Loki
4
Transport/WH A
Navaneeth
5
Moulds
C
Ismail
6
PRO
C/D Ismail
7
Services
F
Venkatesh B
8
MRO
D/E Kishore
9
Resort-Repack B
Loki
10
CORP
F
VENKATESH B
11
Capital
C
Ismail
Mail ID
n.c.krishnan@accenture.com
n.c.krishnan@accenture.com
l.pandiya.kumar@accenture.com
n.c.krishnan@accenture.com
s.ismail@accenture.com
s.ismail@accenture.com
venkatesh.ganesan@o-i.com
kishore.narasimhan@o-i.com
l.pandiya.kumar@accenture.com
venkatesh.ganesan@o-i.com
s.ismail@accenture.com
If we don’t receive any response, then we can reach out to 1st level.
ESCALATION LEVEL:
1st Level : Divya Vengatesh – Divya.Vengatesh@o-i.com
2nd Level : Chetan Maddala – Chetan.Maddala@o-i.com
3rd Level : Pankaj Adiyodi – Pankaj.Adiyodi@o-i.com
14
2nd Level : Manjula : Manjula.Devi@o-i.com
GBS Escalation Matrix link : Escalation Matrix
(sharepoint.com)
Q&A
15
APPENDIX
16
Reference Documents
• MRO/PRO Workflow User’s Guide
17
Download