IF Fast-form Fast form Formworks Drop Head Props Aluminum Frame + Plywood Panel Truss Support Filler beam Product Advantages Early stripping design: Early-stripping After 36 to 48 hours of the concrete pouring or the concrete strengthen achieve 50% (GB50204-2002 National Standard), the panels could be dismantled to move the next floor, so as to save one floor panel. For example, Brazil construction date-seven to ten days to finish one floor, so the whole project just need one floor panels and two floor shoring jacks(props). Light Weight: The max panel is 1.8mX1.2m, 30kg weight. One worker can hand move. Fast to Install: Only need four workers as one team to install, no need any install experiences. IInstallation ll i time: i One worker can install 25 ㎡/hour, and dismantle 50 ㎡, so it can reduce construction time. Construction Solution Beam Bottom Solution Beam Bottom Solution 1: use beam bottom panel, integrated application. 600 1200b 600x1200beam b bottom tt panell If beam bottom depth ≥350mm, ≥350mm choose this solution. solution If the beam depth≤350mm, depth≤350mm choose this solution. solution Beam Bottom Solution Beam Bottom 2 :Work with traditional wood panel Filler Beam: Connect the wood panel with the IF panel Wall Solution Wall Solution Wood panel Wall batten Filler Beam Steel Prop + Drop head Wall side Connection Steel Prop + Drop H d Head 1800x600mm 800 600 Panel a e Filler Beam Column Solution Column Solution Filler Beam Wood panel Wood Batten Column Solution ((Distance between Column and column ≥300mm)) Wood Batten (g (green color)) Over High Floor Over height Floor 1 meter and 1.5 meter extension feet Two Steel props with truss support Cantilever Platform Cantilever Platform Solution: Wood batten Steel Guardrail Cantilever Bar Projects(2019-2020) Projects(2019 2020) Philippines Davao: Multi-Beams Structure 4 workers as one team Large jobsite space Over Height Floor Projects(2019-2020) Projects(2019 2020) Thailand, Bangkok Work together with wall formworks Cantilever Structure Work together with aluminum formworks W k with Work ith traditional t diti l wood d forms f J b it will Jobsite ill has h large l space C Concrete t surface f smoothly thl Projects(2019-2020) Projects(2019 2020) Australia . Projects(2019-2020) Projects(2019 2020) USA, New York 7 Meter High Projects(2019-2020) Projects(2019 2020) Mauritius Thank you Welcome Contact: Ragnar Zhang Email: ragnar@kitsen.com M/Phone: +86 13809225083 Address: KITSEN Technologies, Co., Ltd, Yangdong District, Yangjiang City, Guangdong Province, China