KITSEN FATFORM SLAB FORMWORK SOLUTION

advertisement
IF Fast-form
Fast form Formworks
Drop Head
Props
Aluminum Frame
+ Plywood Panel
Truss Support
Filler beam
Product Advantages
Early stripping design:
Early-stripping
After 36 to 48 hours of the concrete pouring or the concrete strengthen achieve
50% (GB50204-2002 National Standard), the panels could be dismantled to move
the next floor, so as to save one floor panel. For example, Brazil construction
date-seven to ten days to finish one floor, so the whole project just need one floor
panels and two floor shoring jacks(props).

Light Weight:
The max panel is 1.8mX1.2m, 30kg weight. One worker can hand move.

Fast to Install:
Only need four workers as one team to install, no need any install experiences.

IInstallation
ll i time:
i
One worker can install 25 ㎡/hour, and dismantle 50 ㎡, so it can reduce
construction time.

Construction Solution
Beam Bottom Solution

Beam Bottom Solution 1: use beam bottom panel, integrated application.
600 1200b
600x1200beam
b
bottom
tt
panell
If beam bottom depth ≥350mm,
≥350mm choose this solution.
solution
If the beam depth≤350mm,
depth≤350mm choose this solution.
solution
Beam Bottom Solution
 Beam Bottom 2 :Work with traditional wood panel
Filler Beam: Connect the wood panel with the IF panel
Wall Solution
 Wall Solution
Wood panel
Wall batten
Filler Beam
Steel Prop + Drop
head
Wall side Connection
Steel Prop + Drop
H d
Head
1800x600mm
800 600
Panel
a e
Filler Beam
Column Solution
 Column Solution
Filler Beam
Wood panel
Wood Batten
Column Solution
((Distance between Column and column ≥300mm))
Wood Batten (g
(green color))
Over High Floor
 Over height Floor
1 meter and 1.5 meter extension feet
Two Steel props with truss support
Cantilever Platform
 Cantilever Platform Solution:
Wood batten
Steel Guardrail
Cantilever Bar
Projects(2019-2020)
Projects(2019
2020)
 Philippines Davao:
Multi-Beams Structure
4 workers as one team
Large jobsite space
Over Height Floor
Projects(2019-2020)
Projects(2019
2020)
 Thailand, Bangkok
Work together with wall formworks
Cantilever Structure
Work together with aluminum formworks
W k with
Work
ith traditional
t diti
l wood
d forms
f
J b it will
Jobsite
ill has
h large
l
space
C
Concrete
t surface
f
smoothly
thl
Projects(2019-2020)
Projects(2019
2020)
 Australia
.
Projects(2019-2020)
Projects(2019
2020)
 USA, New York
7 Meter High
Projects(2019-2020)
Projects(2019
2020)
 Mauritius
Thank you
Welcome
Contact:
Ragnar Zhang
Email:
ragnar@kitsen.com
M/Phone: +86
13809225083
Address:
KITSEN
Technologies, Co.,
Ltd, Yangdong
District, Yangjiang
City, Guangdong
Province, China
Download