Uploaded by AEMa CCC

459977649-Method-statement

advertisement
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
LIFTING SLING
(BY OTHERS)
C
C
D SCHACKLE 25 TON X 2 NOS
(BY OTHERS)
SPREADER BEAM - 50
TON SWL (BY OTHERS)
D SCHACKLE 25 TON X 2 NOS
(BY OTHERS)
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
LIFTING SLING - 10M LONG.
17 TON X 4 NOS
(BY OTHERS)
LIFTING SLING - 10M LONG.
17 TON X 4 NOS
(BY OTHERS)
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
13500
I
UNIVERSAL ENGINEERING SERVICES LLC.
ENCLOSURE 01
WEIGHT OF ENCLOSURE: 45 TON
JACK THE CRANE IN
APPROPRITE LOCATION AS
PER CRANE SUPPLIER
E3
E3
4600
COG 7250
ATTACH LIFTING GEARS TO
CRANE AND ENCLOSURE AS
PER LIFTING DRAWING
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
COG
E7
LOW BED TRAILER - 01
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
COG 2102
A
D SCHACKLE 17 TON X 4 NOS
(BY OTHERS)
11
2
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
DWG. NO.:
6
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
01 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
ENCLOSURE 01
WEIGHT OF ENCLOSURE: 45 TON
DATE:
SIGNATORY
UNIVERSAL ENGINEERING SERVICES LLC.
E3
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
COG
E7
I
E3
LIFT THE ENCLOSURE ABOVE
THE HEIGHT OF TRAINER BED
11
2
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
LOW BED TRAILER - 01
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
DWG. NO.:
6
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
02 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
DATE:
SIGNATORY
ENCLOSURE 01
B
WEIGHT OF ENCLOSURE: 45 TON
E3
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
E3
I
UNIVERSAL ENGINEERING SERVICES LLC.
COG
E7
MOVE THE TRAILER BELOW
THE ENCLOSURE
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
11
2
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
LOW BED TRAILER - 01
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
DWG. NO.:
6
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
03 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
ENCLOSURE 01
WEIGHT OF ENCLOSURE: 45 TON
E3
I
UNIVERSAL ENGINEERING SERVICES LLC.
E3
COG
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
A
LOWER THE ENCLOSURE ON
TO THE LOW BED TRAILER
E7
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
11
2
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
LOW BED TRAILER - 01
6
I
5
I
4
DWG. NO.:
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
04 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
ENCLOSURE 01
WEIGHT OF ENCLOSURE: 45 TON
E3
I
UNIVERSAL ENGINEERING SERVICES LLC.
E3
COG
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
A
DISMANTLE THE LIFTING
GEARS
E7
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
LOW BED TRAILER - 01
6
I
5
I
4
DWG. NO.:
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
05 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
WEIGHT OF ENCLOSURE: 45 TON
E3
I
UNIVERSAL ENGINEERING SERVICES LLC.
ENCLOSURE 01
E3
COG
MOVE THE TRAILER FROM THE
LOADING LOCATION
REPEAT THE SAME PROCEDURE
TO LOAD 2ND ENCLOSURE USING
2ND LOW BED TRAILER
E7
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
LOW BED TRAILER - 01
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
DWG. NO.:
6
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
06 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
LIFTING SLING
(BY OTHERS)
C
C
D SCHACKLE 12 TON X 2 NOS
(BY OTHERS)
SPREADER BEAM - 20
TON SWL (BY OTHERS)
D SCHACKLE 12 TON X 2 NOS
(BY OTHERS)
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
LIFTING SLING - 10M LONG.
6 TON X 4 NOS
(BY OTHERS)
LIFTING SLING - 10M LONG.
6 TON X 4 NOS
(BY OTHERS)
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
I
UNIVERSAL ENGINEERING SERVICES LLC.
SWITCH GEAR ENCLOSURE
JACK THE CRANE IN
APPROPRITE LOCATION AS
PER CRANE SUPPLIER
ENCLOSURE WEIGHT : 15 TON
E3
ATTACH LIFTING GEARS TO
CRANE AND ENCLOSURE AS
PER LIFTING DRAWING
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
M
COG 859
LOW BED TRAILER - 03
D SCHACKLE - 6.5
TON X 4 NOS
(BY OTHERS)
11
2
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
COG 5750
6
I
DWG. NO.:
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
07 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
I
UNIVERSAL ENGINEERING SERVICES LLC.
SWITCH GEAR ENCLOSURE
ENCLOSURE WEIGHT : 15 TON
E3
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
M
LIFT THE ENCLOSURE ABOVE
THE HEIGHT OF TRAINER BED
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
11
2
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
LOW BED TRAILER - 03
DWG. NO.:
6
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
08 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
I
UNIVERSAL ENGINEERING SERVICES LLC.
SWITCH GEAR ENCLOSURE
ENCLOSURE WEIGHT : 15 TON
E3
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
MOVE THE TRAILER BELOW
THE ENCLOSURE
M
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
1 1
2
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
LOW BED TRAILER - 03
6
I
5
I
4
DWG. NO.:
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
09 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
I
UNIVERSAL ENGINEERING SERVICES LLC.
SWITCH GEAR ENCLOSURE
ENCLOSURE WEIGHT : 15 TON
LOWER THE ENCLOSURE ON
TO THE LOW BED TRAILER
E3
DISMANTLE THE LIFTING
GEARS
MOVE THE TRAILER FROM THE
LOADING LOCATION
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
REPEAT THE SAME PROCEDURE
TO LOAD 2ND ENCLOSURE
M
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
LOW BED TRAILER - 03
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
DWG. NO.:
6
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
10 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
DATE:
SIGNATORY
20000 LITER TANK
B
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
LIFT 20,000 LITER TANK
LOAD THE TANK ON THE TRAILER
USING CRANE
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
DWG. NO.:
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
CUSTOMER: UES
6
I
UNIVERSAL ENGINEERING SERVICES LLC.
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
11 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
C
C
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
20000 LITER TANK
I
UNIVERSAL ENGINEERING SERVICES LLC.
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
DWG. NO.:
6
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
12 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
D
20000 LITER TANK
5000 LITER TANK
5000 LITER TANK
I
LOAD 5000 LITER TANK
USING FORKLIFT
C
C
TRAILER - 04
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
20000 LITER TANK
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
DATE:
SIGNATORY
5000 LITER TANK
B
5000 LITER TANK
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
I
UNIVERSAL ENGINEERING SERVICES LLC.
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
TRAILER - 04
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
DWG. NO.:
6
I
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
13 of 14
6
I
5
I
4
3
I
2
I
1
ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE
STATED.
1.
D
I
D
LOAD CO2 CABIN. BATTERY BABIN,
BATTERY, CAGE LADDER AND
HANDRAIL PACKAGE USING FORKLIFT
CO2 CABIN
BATTERY CABIN
BATTERY Ni CAD
CAGE LADDER (CAGE ONLY)
C
C
BATTERY Ni CAD
CO2 CABIN
HAND RAIL
PACKAGE
BATTERY CABIN
BATTERY Ni CAD
PLAN VIEW OF TRAILER 05
REV. DATE
REV.BY
DESCRIPTION
DOCUMENT STATUS:
B
A
WORK MAY PROCEED.
B
REVISE & RESUBMIT. WORK MAY PROCEED
SUBJECT TO INCORPORATION OF CHANGES.
C
REVISE & RESUBMIT. WORK MAY NOT PROCEED.
D
REVISION NOT REQUIRED. WORK MAY NOT PROCEED.
B
DATE:
SIGNATORY
P.O.Box No: 2688, RUWI-112,
SULTANATE OF OMAN
TEL: +96824597531,+96824597537
FAX: +96824597514
e-mail : uesoman@omantel.net.com
LOAD MUFFLER USING FORKLIFT
I
UNIVERSAL ENGINEERING SERVICES LLC.
PROJECT TITLE:
CE3000D5 GENSET ENCLOSURE AND
CONTAINER PACKAGE
A
A
SHEET TITLE:
METHOD STATEMENT FOR UNLOADING AND
PLACEMENT OF ALL THE CONTAINERS
PS
DATE:
IM
PROJECT NO. 300952
APPROVED:
IM
CUSTOMER: UES
PLAN VIEW OF TRAILER 06
6
I
DWG. NO.:
5
I
4
3
I
2
I
20.04.2020
PREPARED:
DESIGNED:
ACE-MS-300952-001
1
SCALE:
1:1
REV.:
00
SHEET NO.:
14 of 14