RCC BUILDING 1. 2. 3. 4. 5. 6. 7. 8. 9. Check RCC and steel material and their grade Check Mass Source to ensure that 100% DL+FFPW and min 25%LL is included. Do Not Mesh the walls first. Mesh the Slabs first (3' or 4' min) Remove Diaphragms first from old model that you are using and make e2k and import...otherwise there will be error saying over reinforced or OS due CDL etc. Check Beam defined as beam and column defined as column. Check Stiffness modifier for beam, column, wall check frame section for depth, width, clear cover, f'c, steel grade Ct=0.03/0.029 Check wind and EQ load assignment. Apply wind load up-to roof but not roof top or calculate roof top load carefully. 10. Check slab as shell thin and Mat as shell thick 11. Check Stiffness modifier for slab 12. check shell element for thickness, f'c etc 13. check wall section for....... 14. assign pier label as required 15. check load cases and combo 16. Assign Dead Load 17. Assign Live load for floor, lift lobby and stair, water tank, gardening etccccc 18. Assign toilet dead load 19. Assign Stair dead load 20. Remove Extra load from roof 21. Assign Restraint at support 22. Use 60/85 as LL for roof considering Rain 23. Release Beam Ends that cannot take moment, otherwise which column will take moment will not be justified. (Important) 24. Check concrete frame design preference. Check strength reduction factors and seismic design category(C-in rangs). For ETABS-2018 check B/C capacity ratio to be yes or No. For SMRF/High rise structures it should be "yes", for IMRF/Normal Buildings "NO"Ref: Humayun Vaiya,,,but be sure. 25. Check rcc overwrites and make sure to be sway intermediate/special.