Project: CONSTRUCTION OF 200 CUBIC METRES R. C RECTANGULAR ABOVEGROUND WATER TANK FOR RUBBER ESTATES NIGERIA LTD. ARAROMI - OBU, ODIGBO LOCAL GOVERNMENT AREA, ONDO STATE - NIGERIA. Consultant: Page : Job No.: RENL / RCWT / 2024 Prepared by : Engr. Omar Ngura Subject: R. C RECTANGULAR ABOVEGROUND WATER STRORAGE TANK Checked by : Engr. Niyi Folayan Structure: CONCRETE STRUCTURES Date: May, 2024 CALCULATIONS ITEM OUTPUT INPUT DATA WORKING CAPACITY: 200 M3 LENGTH (L): 9.60 M BREADTH (B): 9.60 M HEIGHT (H): 2.40 M FREE BOARD: 0.20 M MATERIAL STRENGTHS Concrete grade, fcu = 20 N/mm2 Steel bar characteristic strength, fy = 415 N/mm2 Concrete characteristic strength = 24 KN/m2 Soil Bearing capacity = 100 KN/m3 2. PERMISSIBLE STRESSES σcb σst σst = = = 7 N/mm2 150 N/mm2 (on faces near water face) 190 N/mm2 (on faces away from water face) Near Water Face E cm = 27.433 Es = Away from Water Face E cm = 27.433 200 m = 7.290 m = 7.290 j = 0.872 j = 0.890 Q = 1.170 Q = 1.030 R = 1.00 < 2.00 The top portion of the side walls will be designed as a continuous structural member while the bottom part, 1 m or H / 4 whichever is more will be designed as cantilever. H/4 = 0.600 m < 1.0 m, Hence bottom 1m will be designed as cantilever. Designing height = 1.000 m Water pressure at 1.400 m height from the top of cant. member = Water pressure at 2.400 m height from the bottom = 23.54 kN/m2 Page 1 of 6 13.73 kN/m2 Project: CONSTRUCTION OF 200 CUBIC METRES R. C RECTANGULAR ABOVEGROUND WATER TANK FOR RUBBER ESTATES NIGERIA LTD. ARAROMI - OBU, ODIGBO LOCAL GOVERNMENT AREA, ONDO STATE - NIGERIA. Consultant: Structure: CONCRETE STRUCTURES CALCULATIONS OUTPUT 3 (Unit weight of water used = 9.81 kN/m ) 2.40 9.60 13.734 kN/m2 23.54 kN/m2 TANK ELEVATION. 9.60 E B 9.60 A D C TANK G.A PLAN. FIXED END MOMENTS: MAB = 105.5 kNm MAD = -105.5 kNm A A D 9,600 Checked by : Engr. Niyi Folayan Date: May, 2024 ITEM Mmt. Job No.: RENL / RCWT / 2024 Prepared by : Engr. Omar Ngura Subject: R. C RECTANGULAR ABOVEGROUND WATER STRORAGE TANK F Page : B 9,600 0 0.25 0.25 0 0 -105.48 105.48 0 0 0.00 0.00 0 0 0.00 0.00 0 0 -105.48 105.48 0 Page 2 of 6 Project: CONSTRUCTION OF 200 CUBIC METRES R. C RECTANGULAR ABOVEGROUND WATER TANK FOR RUBBER ESTATES NIGERIA LTD. ARAROMI - OBU, ODIGBO LOCAL GOVERNMENT AREA, ONDO STATE - NIGERIA. Consultant: Page : Job No.: RENL / RCWT / 2024 Prepared by : Engr. Omar Ngura Subject: R. C RECTANGULAR ABOVEGROUND WATER STRORAGE TANK Structure: CONCRETE STRUCTURES Checked by : Engr. Niyi Folayan Date: May, 2024 CALCULATIONS ITEM MAB = 105.48 kNm MAD = -105.48 kNm Moment at centre of long span wall AB= 52.74 kNm Moment at centre of long span wall AD= 52.74 kNm Direct tension in long wall (AB)= 65.92 kN Direct tension in long wall (AB)= 65.92 kN OUTPUT DESIGN OF LONG WALLS: At support: Mmt. = 105.48 kNm T = 65.92 kN Tension on Lquid factor From Table 9-6 Q = 0.306 Assuming d/D= 0.9 D = 587.1 mm = Say D Concrete cover = 25 mm Assumed Reinf't.= 20 mm d = 600 mm 565 mm From Table 9-5 Ast1 for moment = 1427.3 mm2 Ast2 for direct tension = Total (Ast1 + Ast2) = 439.5 mm2 1866.7 mm2 Provide 20 mm Diameter High tensile bar 168.31 mm Spacing of bar = Provide 20 mm Diameter High tensile bar @ 150mm c/c …marked (a) = At Centre M = 52.7 kNm T = 65.9 kN e = 0.8 m Tension on remote face Page 3 of 6 2,094 mm2/m Project: CONSTRUCTION OF 200 CUBIC METRES R. C RECTANGULAR ABOVEGROUND WATER TANK FOR RUBBER ESTATES NIGERIA LTD. ARAROMI - OBU, ODIGBO LOCAL GOVERNMENT AREA, ONDO STATE - NIGERIA. Consultant: Page : Job No.: RENL / RCWT / 2024 Prepared by : Engr. Omar Ngura Subject: R. C RECTANGULAR ABOVEGROUND WATER STRORAGE TANK Checked by : Engr. Niyi Folayan Structure: CONCRETE STRUCTURES Date: May, 2024 CALCULATIONS ITEM E = 535 mm Modified moment = 35.27 kNm Ast1 for moment = 369.1 mm2 Ast2 for direct tension = Total (Ast1 + Ast2) = 439.5 mm2 OUTPUT 808.6 mm2 Provide 16 mm Diameter High tensile bar 248.68 mm Spacing of bar = Provide 16 mm Dia. Ht bar @ 200mm c/c …marked (b) = From Table 9-3: Minimum reinforcement = Distribution steel = 960 mm2 On each face = 480 mm2 1,005 mm2/m 0.16 % Provide 12 mm Diameter High tensile bar 235.65 mm Spacing of bar = Provide 12 mm Dia. Ht bar @ 200mm c/c …marked (d) = 565 mm2/m Vertical Steel (c) Provide 12 mm Diameter High tensile bar 235.65 mm Spacing of bar = Provide 12 mm Dia. Ht bar @200mm c/c both faces (c)= 565 mm2/m Horizontal Steel Remote face (b): Provide 16 mm Dia. Ht bar @ 200mm c/c …marked (b) = 1,005 mm2/m Liquid face (d): Provide 12 mm Dia. Ht bar @ 200mm c/c …marked (d) = 565 mm2/m Vertical Steel (c): Provide 12 mm Dia. Ht bar @200mm c/c both faces (c)= 565 mm2/m DESIGN OF SHORT WALLS: At support: Mmt. = T = 105.48 kNm 65.92 kN Tension on Lquid factor Page 4 of 6 Project: CONSTRUCTION OF 200 CUBIC METRES R. C RECTANGULAR ABOVEGROUND WATER TANK FOR RUBBER ESTATES NIGERIA LTD. ARAROMI - OBU, ODIGBO LOCAL GOVERNMENT AREA, ONDO STATE - NIGERIA. Consultant: Page : Job No.: RENL / RCWT / 2024 Prepared by : Engr. Omar Ngura Subject: R. C RECTANGULAR ABOVEGROUND WATER STRORAGE TANK Checked by : Engr. Niyi Folayan Structure: CONCRETE STRUCTURES Date: May, 2024 CALCULATIONS ITEM OUTPUT From Table 9-5 Ast1 for moment = 1427.3 mm2 Ast2 for direct tension = Total (Ast1 + Ast2) = 439.5 mm2 1866.7 mm2 Provide 20 mm Diameter High tensile bar 168.31 mm Spacing of bar = Provide 20 mm Diameter High tensile bar @ 150mm c/c …marked (b) = 2,094 mm2/m At Centre M = 52.74 kNm T = 65.92 kN From Table 9-5 Ast1 for moment = Tension on liquid face 713.6 mm2 Ast2 for direct tension = Total (Ast1 + Ast2) = 439.5 mm2 1153.1 mm2 Provide 16 mm Diameter High tensile bar Spacing of bar = 174.39 mm Provide 16 mm Dia. HT bar @ 150mm c/c …marked (e) = From Table 9-3: Minimum reinforcement = Distribution steel = 960 mm2 On each face = 480 mm2 1,340 mm2/m 0.16 % Provide 12 mm Diameter High tensile bar Spacing of bar = 235.65 mm Provide 12 mm Dia. HT bar @ 200mm c/c …marked (d) = 2 565 mm /m 565 mm /m Vertical Steel (c) Provide 12 mm Diameter High tensile bar Spacing of bar = 235.65 mm Provide 12 mm Dia. HT bar @ 200mm c/c both faces (c)= Page 5 of 6 2 Project: CONSTRUCTION OF 200 CUBIC METRES R. C RECTANGULAR ABOVEGROUND WATER TANK FOR RUBBER ESTATES NIGERIA LTD. ARAROMI - OBU, ODIGBO LOCAL GOVERNMENT AREA, ONDO STATE - NIGERIA. Consultant: Page : Job No.: RENL / RCWT / 2024 Prepared by : Engr. Omar Ngura Subject: R. C RECTANGULAR ABOVEGROUND WATER STRORAGE TANK Structure: CONCRETE STRUCTURES Checked by : Engr. Niyi Folayan Date: May, 2024 CALCULATIONS ITEM OUTPUT Horizontal Steel Remote face (e): Provide 16 mm Dia. HT bar @ 150mm c/c …marked (e) =1,340 mm2/m Liquid face (d): Provide 12 mm Dia. HT bar @ 200mm c/c …marked (d) = 565 mm2/m Vertical Steel (c): Provide 12 mm Dia. HT bar @ 200mm c/c both faces (c)= 565 mm2/m BOTTOM 1M WILL BE DESIGNED AS CANTILEVER Cantilever moment: M = 3.92 kNm From Table 9-5 Ast1 for moment = 53.1 mm2 From Table 9-3: Minimum reinforcement = 0.16 % 2 Distribution steel = 960 mm On each face = 480 mm2 Provide 12 mm Diameter High tensile bar Spacing of bar = 235.65 mm Provide 12 mm Dia. High tensile bar @ 200mm c/c each face …marked (c) = 565 mm2/m BASE SLAB: Base slab is resting on ground. For a water head For a 2.40 m water head, provide 150 mm thick slab From Table 9-3: Minimum reinforcement = 0.229 % Min. steel = 344 mm2 ( 171.8 mm2 bothways) Provide 10 mm Diameter High tensile bar Spacing of bar = 457.35 mm Provide 10 mm Dia. High tensile bar @ 200mm c/c both ways, T & B = Page 6 of 6 393 mm2/m