Uploaded by Lavanyan Satchithananthan

129026443-Golden-Joint-Procedure-Rev1

advertisement
CONTRACT NO: CHO/C3/2010/DFHD/015B
WORK ORDER NO: DFHD/2010/042D/003
GOLDEN JOINT PROCEDURE
Doc No : PRSB-2010-0156-QA-25
GUIDELINE FOR INSTALLATION OF
FINAL TIE-IN GOLDEN JOINT
Page No. : 3 of 6
Rev. 1
PETRA RESOURCES SDN BUD
(172962•D)
16-06-2011
TABLE OF CONTENTS
SECTION
DESCRIPTION
PAGE
1.0
PURPOSE
4
2.0
SCOPE
4
3.0
REFERENCE
4
4.0
DEFINITIONS / ABBREVIATION
4
5.0
PROCEDURE
4
5.1
PRIOR TO SHUTDOWN
4
5.2
DURING SHUTDOWN
5
6.0
RECORDS
7.0
APPENDICES
6
APPENDIX I
API 570 PIPING INSPECTION CODE CLAUSE 8.2.6
APPENDIX II
FIGURE 1 - PLUMBERS PLUG INSTALLATION DIAGRAM
This is controlled document No part or this document may be reproduced in any form by print, photocopy, rnicra'rn or
any other means withaut written permission from PRSB guatty Management Representative
Download