MISR UNIVERSITY FOR SCIENCE &TECHNOLOGY Faculty of Engineering Construction Department CE 509 Decision Analysis in Construction Dr. Ahmed Shaheen Eng. Ibrahim Ghonimi Fall 2021-2022 Find the value of the game for every Assignment payoff matrix. Example 1 Find the value of the game for this payoff matrix. PLAYER II PLAYER I A B C D E A -5 5 0 -1 8 B 8 -4 -1 6 -5 Question 2 The following is a brief precedence diagram for a small project that contains main seven activities. The following table shows rates assigned to risks based on their assessed probability and impact. Activity Concrete Brick Sanitary Ins Electric Ins. Wood & glass Tiles Plaster Initial Price 3M 1M 2M 4M 4M 2M 2M Probab. 0.3 0.1 0.05 0.2 0.2 0.1 0.15 Cost tol./m 15% 10% 5% 10% 30% 7% 9% 1. If after three months, the work stopped for one month. Compute the change in the project total price considering all project items will increase and 25% overhead will be added. 2. If after wall erecting the project stopped for three months. Compute the change in the project total price considering concrete, electric ins, and wood/glass will increase, on the other hand other items remained the same and 25% overhead will be added.