CLIENT CONTRACTOR DESIGN & DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR SALALAH TSE NETWORK OCT 2022 RABI AL AWWAL 1444 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR SALALAH TSE NETWORK Rev.: 00 Project Participants Project Name DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM Client Dhofar Integrated Services Company Contractor Galfar Engineering & Contracting SAOG Contractor’s Consultant AAW Consulting Engineers Document Information Document Title: Calculation Sheet For Salalah TSE Pipelines Doc Number: 02227-AAW- REP-00 Document Approval Action Name Designation Signature Date Prepared by: Mai Ashraf Design Engineer MA 10.10.2022 Checked by: Mohamed Hassan Design Manager MH 10.10.2022 Approved by: Adel Sayed Project Manager AS 10.10.2022 Revision History Rev. Date Purpose Description 00 10.10.2022 For Review Hydraulic Calculation 2/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR SALALAH TSE NETWORK Rev.: 00 TABLE OF CONTENTS 1. INTRODUCTION ................................................................................................................................................ 5 2. SYSTEM TECHNICAL DATA ............................................................................................................................ 6 3. Hydraulic Design Criteria ............................................................................................................................. 10 4. HYDRAULIC ANALYSIS .................................................................................................................................. 11 5. CONCLUSIONS................................................................................................................................................. 11 LIST OF APPENDIXES APPENDIX-A - STEADY-STATE ANALYSIS RESULTS ................................................................................... 12 LIST OF FIGURES Figure (1.1) General Layout for Dhofar Municipality TSE Pipelines ......................................................... 5 Figure (A.1) Hydraulic Profile for Main Pipeline (from Main PS to Sadaah PS1) .............................. 21 Figure (A.2) Hydraulic Profile for Main Pipeline (from Main PS to Itten PS1) ................................... 21 Figure (A.3) Hydraulic Profile for Main Pipeline (from Itten PS1 to Itten PS2).................................. 22 Figure (A.4) Hydraulic Profile for Main Pipeline (from Sadaah PS1 to Sadaah PS2) ....................... 22 Figure (4.1) The Node Diagram of Dhofar Municipality TSE Pipelines ............................................... 24 LIST OF TABLES Table (2-1): Existing Pipelines Technical Data ................................................................................................. 6 Table (2-2): Proposed Pipelines Technical Data ............................................................................................. 6 Table (2-3): Pumps Technical Data ...................................................................................................................... 7 Table (2-4): Sumps Technical Data ...................................................................................................................... 7 Table (2-5): Connections Data ............................................................................................................................... 7 Table (A.1) Pipe Report .......................................................................................................................................... 13 Table (A.2) Junction Report .................................................................................................................................. 17 Table (A.3) Pump Report ....................................................................................................................................... 23 Table (A.4) FCV Report ........................................................................................................................................... 23 3/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR SALALAH TSE NETWORK Rev.: 00 List of Abbreviations DI Ductile Iron HDPE High Density Polyethylene uPVC unplasticized Polyvinyl Chloride FCV Flow Control Valve PS Pump Station TSE Treated Sewage Effluent List of Supporting Documents Doc. Title Originator Format 1 TSE EXISTING DESGIN DATA DISC CAD / PDF 2 Master Plan TSE-B DISC CAD 3 Final Design Report Drawings Mott Macdonald PDF 4/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR SALALAH TSE NETWORK 1. Rev.: 00 INTRODUCTION Dhofar Integrated Services Company S.A.O.C (“Owner / DISC”) serves the people of Dhofar governorate, covering electricity, water, and wastewater. The company aims to raise the quality of these services and make them more efficient, reliable, and accessible. It is expanding the service network by adopting strategies that reduce wastage, improve access, and achieve customer satisfaction. Therefore DISC contracted with Galfar Company to implement the proposed lines in Dhofar municipality irrigation network, Galfar has contracted Consulting Engineers AAW & Partners to prepare the Hydraulic Model of the existing pipelines and proposed pipelines and detailed design drawings for proposed pipelines. The objective of this report is to present the final results for the Dhofar Municipality TSE network after incorporation the proposed pipelines to existing pipelines. Figure (1.1) presents general layout for Dhofar Municipality TSE pipelines. Figure (1.1) General Layout for Dhofar Municipality TSE Pipelines 5/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR SALALAH TSE NETWORK 2. Rev.: 00 SYSTEM TECHNICAL DATA The Dhofar Municipality TSE Network includes Pump Stations, Reservoirs and pipelines. The technical data is listed in below Tables. Project components are described in Dhofar Municipality TSE network Schematic. Table (2-1): Existing Pipelines Technical Data Pipeline No. From To Nominal Diameter (mm) Pipe Material Length (km) 1 Main PS Hamdan Signal 630 HDPE 2.40 2 Hamdan Signal MOD Signal 630 HDPE 4.80 3 MOD Signal UAG R/A Signal 560 HDPE 6.00 4 Hamdan Signal Itten PS1 500 HDPE 3.60 5 Itten PS1 Itten PS2 500 /200 /160 HDPE / uPVC 4.00 6 Itten PS2 Itten Park Tank 160 uPVC 3.00 7 UAG R/A Signal Sadaah PS1 400 HDPE 1.60 8 Sadaah PS1 Sadaah PS2 250 /200 uPVC 5.00 9 Sadaah PS2 Hamrir Park Tank 160 uPVC 4.90 10 Tapping Point Airport 500/355 HDPE 2.90 Table (2-2): Proposed Pipelines Technical Data Pipeline No. 11 (Itten Line ) 12 (Airport Line A) 13 (Saadah Line A) 14 (Saadah Line B) From To Nominal Diameter (mm) Pipe Material Length (km) Tapping Point Itten PS2 250 HDPE 2.90 Tapping Point Tank 355 HDPE 4.00 Sadaah PS1 Sadaah PS2 400 HDPE 5.30 Sadaah PS2 End Point 400 HDPE 2.80 6/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR SALALAH TSE NETWORK From To Nominal Diameter (mm) Pipe Material Length (km) Tapping Point Tank 355 HDPE 0.10 Tapping Point End Point 125 HDPE 0.13 Pipeline No. 15 (Airport Line B) 16 (Municipality Line) Rev.: 00 Table (2-3): Pumps Technical Data PS Name No. of Pumps Flow each (m³/h) Head (m) Inlet Pipe Diameter (mm) Outlet Pipe Diameter (mm) Main PS 4 900 50 600 600 Itten PS1 4 300 50 400 400 Itten PS2 2 60 65 150 150 Sadaah PS1 3 120 65 250 250 Sadaah PS2 2 60 65 200 200 Table (2-4): Sumps Technical Data PS Name Volume (m³) Elevation (m) Main PS 5625 19.80 Itten PS1 50 26.75 Itten PS2 25 51.30 Sadaah PS1 50 13.70 Sadaah PS2 25 40.40 Table (2-5): Connections Data Connection No. Target Demand (m³/h) Location Status S2 25 Inside Ittin -1 P.S From Data / Existing branch S3 25 Crossing near Mc Donald Al Wadi Assumed / Existing branch 7/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR SALALAH TSE NETWORK Rev.: 00 Connection No. Target Demand (m³/h) Location Status S4 30 Inside Football Stadium Parking From Data / Existing branch S5 30 Crossing Near Park From Data / Existing branch S6 30 Before MOD Signal near Ministry of Heritage & Culture From Data / Existing branch S7 30 After MOD Signal near KFC From Data / Existing branch S8 30 Old Airport From Data / Existing branch S9 30 Sahwa Tower Assumed / Existing branch S10 30 Below Flyover corner of Saadah Signal From Data / Existing branch S10A 300 Near Dhofar Cattle Feed From Data / Existing branch S11 30 Near Dhofar Cattle Feed From Data / Existing branch S12 137 Near Ittin Roundabout From Data / Proposed branch S12A 30 - From Data / Existing branch S13 30 - From Data / Existing branch S14 20 Opp Salalah Technical College Assumed / Existing branch S15 20 Near Rop Roundabout Assumed / Existing branch S16 20 - Assumed / Existing branch S17 10 Before New Airport From Data / Existing branch S18 60 End Itten Pipeline Assumed / Existing Tank S19 10 End Sadaah Pipeline Assumed / Existing Tank S20 20 Dhofar University Roundabout Assumed / Existing branch S21 30 End Sadaah Line B Assumed / Future Connection 8/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK DHOFAR TSE NETWORK SCHEMATIC Itten Park Tank S18= 60 m³/hr Line 14 HDPE - 400 mm Future Connection S21 = 30 m³/hr Feeding Point = S Target Flow = - m³/hr S12-1 70 m³/hr SADAAH PS2 Line 12 HDPE - 355 mm Line 10 HDPE – 500/355 mm S15 20 m³/hr S12-2 70 m³/hr S14 20 m³/hr S17 10 m³/hr PS Line 1 HDPE - 630 mm S3 30 m³/hr S4 30 m³/hr S5 30 m³/hr S7 30 m³/hr S6 30 m³/hr MOD Signal Line 2 HDPE - 630 mm 9/24 S8 & S9 30 m³/hr Line 3 HDPE - 560 mm Line 7 Line 4 HDPE - 500 mm Hamdan Signal S11 30 m³/hr uPVC - 400 mm SADAAH PS1 Line 16 HDPE - 125 mm Main Line 8 uPVC – 250 :200 mm Line 15 HDPE - 355 mm S16 20 m³/hr Itten PS1 S2 25 m³/hr Line 9 uPVC – 200 :160 mm Proposed Pipeline Line 5 uPVC – 200/ 160 mm Line 5 HDPE - 500 mm Salalah Tank S20 = 20 m³/hr Line 13 HDPE - 400 mm Line6 uPVC - 160 mm Existing Pipeline S13 30 m³/hr Line 11 HDPE - 250mm Hamrir Park Tank S19 = 10 m³/hr Legend Itten PS2 S12A 30 m³/hr Rev.: 00 UAG R/A Signal S10A 300 m³/hr S10 30 m³/hr DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK 3. Rev.: 00 Hydraulic Design Criteria Network analysis shall be undertaken using advanced computer software (WaterCAD Connect edition update 3). Transmission lines will be designed using Hazen-Williams formula for its proven accuracy and adaptability over a range of pipe sizes. This formula can be expressed as: L V 0.355CD 0.63 H 0.54 Where: - V = Average velocity of flow (m/s) - C = Friction coefficient, depending on pipe material - D = Internal pipe diameter (m) - H = Friction head loss (m) - L Pipe length (m) - Maximum flow velocity = 1.5 m/s - Maximum hydraulic gradient slope = 10.0 m/km - Minimum residual pressure along the pipeline = 1.0 bar - Flow control valves (FCV) are used to achieve required flow. - Hazen-Williams coefficient C for pipe = 130 including minor losses. = 10/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK 4. Rev.: 00 HYDRAULIC ANALYSIS The Dhofar TSE transmission pipelines have been simulated using WaterCAD Connect edition update 3 as follows: - Routing of TSE pipelines (Existing and Proposed) are taken from Master Plan Drawing provided by DISC. - TSE pipelines are modelled as pipes with lengths and diameters. Junctions are added along the pipeline at approx. 500 m spacing to simulate the pipelines profile. - The elevations are taken from available topographical survey for proposed pipelines and from as built drawings and google earth for existing pipelines, pump stations and reservoirs. - Pump stations are modelled as reservoir and a pump with required elevations. - Pump curves are simulated as one-point curve with duty flow and head. One pump is assumed in operation in each pump station. - Flow control valves (FCV) are used at inlets to pump station sumps to achieve required flows. - Figure (4.1) shows the node diagram of the simulated pipelines. Steady-state analysis is carried out for TSE transmission pipelines. Appendix A presents hydraulic analysis results. 5. CONCLUSIONS From the hydraulic analysis (highlighted in green color) it can be concluded that: There are negative pressure at the end of line 6 and line 7. 11/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Rev.: 00 APPENDIX-A STEADY-STATE ANALYSIS RESULTS 12/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Rev.: 00 Table (A.1) Pipe Report Label Length (m) Material P-1 P1-1 P1-2 P1-3 P1-4 P1-5 P1-6 P2-1 P2-2 P2-3 P2-4 P2-5 P2-6 P2-7 P2-8 P2-9 P2-10 P2-11 P2-12 P2-13 P2-14 P3-1 P3-2 P3-3 P3-4 P3-5 P3-6 P3-7 P3-8 P3-9 P3-10 P3-11 P3-12 P3-13 P3-14 P3-15 P3-16 P4-1 P4-2 P4-3 P4-4 P4-5 68 500 500 500 500 365 9 501 500 500 393 107 500 392 108 265 235 500 305 195 342 158 40 460 500 500 474 26 159 341 500 500 500 500 500 500 410 4 8 5 500 500 uPVC HDPE HDPE HDPE HDPE HDPE DI HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE DI DI DI HDPE HDPE Inner Diameter (mm) 170.2 515.6 515.6 515.6 515.6 515.6 600 515.6 515.6 515.6 515.6 515.6 515.6 515.6 515.6 515.6 515.6 515.6 515.6 515.6 515.6 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 458.4 400 400 400 388.4 388.4 Flow (m³/h) Velocity (m/s) 30 867 867 867 867 867 867 542 542 542 542 512 512 512 482 482 452 452 452 422 422 422 422 392 392 392 392 392 392 362 362 362 362 362 362 362 362 300 300 270 325 325 0.37 1.15 1.15 1.15 1.15 1.15 0.85 0.72 0.72 0.72 0.72 0.68 0.68 0.68 0.64 0.64 0.6 0.6 0.6 0.56 0.56 0.71 0.71 0.66 0.66 0.66 0.66 0.66 0.66 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.66 0.66 0.6 0.76 0.76 Headloss Gradient (m/km) 1.019 2.341 2.341 2.341 2.341 2.341 1.119 0.981 0.981 0.981 0.981 0.883 0.883 0.883 0.79 0.79 0.701 0.701 0.701 0.617 0.617 1.095 1.095 0.955 0.955 0.955 0.955 0.955 0.955 0.824 0.824 0.824 0.824 0.824 0.824 0.824 0.824 1.129 1.129 0.929 1.511 1.511 13/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Label Length (m) Material P4-6 P4-7 P4-8 P4-9 P4-10 P4-11 P5-1 P5-2 P5-3 P5-4 P5-5 P5-6 P5-7 P5-8 P5-9 P5-10 P5-11 P5-12 P5-13 P5-14 P5-15 P5-16 P5-17 P6-1 P6-2 P6-3 P6-4 P6-5 P6-6 P6-7 P7-1 P7-2 P7-3 P7-4 P7-5 P7-6 P7-7 P7-8 P7-9 P8-1 P8-2 P8-3 P8-4 P8-5 500 500 500 500 500 57 9 7 4 22 500 88 342 500 81 411 500 500 500 412 88 9 8 500 500 500 500 500 500 38 18 7 11 10 504 500 139 25 374 4 358 500 171 329 HDPE HDPE HDPE HDPE HDPE HDPE uPVC uPVC DI DI HDPE uPVC uPVC HDPE HDPE uPVC uPVC uPVC uPVC uPVC uPVC DI uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC DI DI DI DI uPVC uPVC uPVC uPVC uPVC DI uPVC uPVC uPVC uPVC Inner Diameter (mm) 388.4 388.4 388.4 388.4 388.4 388.4 150 150 150 400 388.4 136.2 136.2 388.4 388.4 170.2 170.2 170.2 170.2 170.2 136.2 150 170.2 136.2 136.2 136.2 136.2 136.2 136.2 136.2 250 250 250 250 212.8 212.8 212.8 212.8 212.8 200 212.8 212.8 212.8 170.2 Flow (m³/h) Velocity (m/s) 325 325 325 325 325 300 60 60 60 270 270 (N/A) (N/A) 270 270 (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) 60 120 60 60 60 60 60 60 60 120 120 2 2 332 332 302 300 302 60 (N/A) (N/A) (N/A) (N/A) 0.76 0.76 0.76 0.76 0.76 0.7 0.94 0.94 0.94 0.6 0.63 (N/A) (N/A) 0.63 0.63 (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) 0.94 1.47 1.14 1.14 1.14 1.14 1.14 1.14 1.14 0.68 0.68 0.01 0.01 2.59 2.59 2.36 2.34 2.36 0.53 (N/A) (N/A) (N/A) (N/A) Rev.: 00 Headloss Gradient (m/km) 1.511 1.511 1.511 1.511 1.511 1.303 6.81 6.81 6.81 0.929 1.072 (N/A) (N/A) 1.072 1.072 (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) 6.809 13.285 10.897 10.897 10.897 10.897 10.897 10.897 10.897 2.042 2.042 0.001 0.001 29.499 29.499 24.756 24.424 24.756 1.677 (N/A) (N/A) (N/A) (N/A) 14/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Label Length (m) Material P8-6 P8-7 P8-8 P8-9 P8-10 P8-11 P8-12 P8-13 P8-14 P8-15 P8-16 P8-17 P8-18 P8-19 P9-1 P9-2 P9-3 P9-4 P9-5 P9-7 P9-8 P9-9 P9-10 P9-11 P9-12 P9-13 P9-14 P10-1 P10-2 P10-3 P10-4 P10-5 P10-6 P10-7 P10-8 P10-9 P11-1 P11-2 P11-3 P11-4 P11-5 P11-6 P11-7 500 71 22 8 381 500 211 289 500 500 500 304 196 29 175 228 197 500 394 288 500 500 97 500 500 500 500 500 500 413 87 500 412 88 273 254 2 502 500 500 500 500 340 uPVC uPVC DI DI uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC DI uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC uPVC HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE Inner Diameter (mm) 170.2 170.2 200 200 212.8 212.8 212.8 212.8 212.8 212.8 212.8 212.8 212.8 200 136.2 136.2 170.2 136.2 136.2 136.2 136.2 136.2 136.2 136.2 136.2 136.2 136.2 388.4 388.4 388.4 290.6 290.6 290.6 290.6 290.6 290.6 130.8 204.6 204.6 204.6 204.6 204.6 204.6 Flow (m³/h) Velocity (m/s) (N/A) (N/A) 60 60 (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) 60 30 10 (N/A) 10 10 (N/A) (N/A) (N/A) (N/A) 10 10 10 10 150 150 150 140 140 140 70 70 (N/A) 30 120 120 120 120 120 90 (N/A) (N/A) 0.53 0.53 (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) 0.53 0.57 0.19 (N/A) 0.19 0.19 (N/A) (N/A) (N/A) (N/A) 0.19 0.19 0.19 0.19 0.35 0.35 0.35 0.59 0.59 0.59 0.29 0.29 (N/A) 0.62 1.01 1.01 1.01 1.01 1.01 0.76 Rev.: 00 Headloss Gradient (m/km) (N/A) (N/A) 1.677 1.677 (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) (N/A) 1.677 3.019 0.395 (N/A) 0.395 0.395 (N/A) (N/A) (N/A) (N/A) 0.395 0.395 0.395 0.395 0.361 0.361 0.361 1.305 1.305 1.305 0.362 0.362 (N/A) 3.675 5.42 5.42 5.42 5.42 5.42 3.181 15/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Label Length (m) Material P12-1 P12-2 P12-3 P12-4 P12-5 P12-6 P12-7 P12-8 P13-1 P13-2 P13-3 P13-4 P13-5 P13-6 P13-7 P13-8 P13-9 P13-10 P13-11 P13-12 P13-13 P13-14 P13-15 P13-16 P13-17 P14-1 P14-2 P14-3 P14-4 P14-5 P14-6 P14-7 P15-1 P16-1 500 500 500 500 500 500 500 500 51 79 30 484 500 461 39 500 500 500 500 30 470 399 101 500 253 482 500 500 146 354 500 311 100 126 HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE Inner Diameter (mm) 290.6 290.6 290.6 290.6 290.6 290.6 290.6 290.6 163.6 163.6 163.6 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 326.8 290.6 102.2 Flow (m³/h) Velocity (m/s) 70 70 70 70 70 70 70 70 20 20 20 120 120 120 100 100 100 100 100 100 80 80 60 60 60 60 60 60 60 30 30 30 70 0 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.26 0.26 0.26 0.4 0.4 0.4 0.33 0.33 0.33 0.33 0.33 0.33 0.26 0.26 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.29 0 Rev.: 00 Headloss Gradient (m/km) 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.583 0.583 0.583 0.554 0.554 0.554 0.395 0.395 0.395 0.395 0.395 0.395 0.261 0.261 0.153 0.153 0.153 0.153 0.153 0.153 0.153 0.042 0.042 0.042 0.362 0 16/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Rev.: 00 Table (A.2) Junction Report Label Elevation (m) Demand (m³/h) J1-1 13 0 Hydraulic Grade (m) 65.45 J1-2 19 0 69.81 4.97 J1-3 15 0 68.64 5.25 J1-4 13 0 67.47 5.33 Pressure (Bar) 5.13 J1-5 13 0 66.3 5.22 J2-1 12.07 0 61.35 4.82 J2-2 11.4 0 64.96 5.24 J2-3 11.5 0 64.46 5.18 J2-4 14 0 63.97 4.89 J2-5 13.74 0 63.49 4.87 J2-6 12 0 63.05 5 J2-7 12.25 0 62.62 4.93 J2-8 13.1 0 62.25 4.81 J2-9 11.95 0 61.9 4.89 J2-10 10.4 0 61.56 5.01 J3-1 10 0 56.02 4.5 J3-2 9.15 0 59.29 4.91 J3-3 11.2 0 61.18 4.89 J3-4 10 0 60.7 4.96 J3-5 8.61 0 60.22 5.05 J3-6 10 0 59.74 4.87 J3-7 9.1 0 59.26 4.91 J3-8 8.9 0 58.83 4.89 J3-9 8.43 0 58.42 4.89 J3-10 4.1 0 58.01 5.28 J3-11 8.04 0 57.59 4.85 J3-12 8.1 0 57.18 4.8 J3-13 7.78 0 56.77 4.79 J3-14 7.7 0 56.36 4.76 J4-1 28 0 60.08 3.14 J4-2 13.2 0 64.69 5.04 J4-3 14.4 0 63.94 4.85 J4-4 16.35 0 63.18 4.58 J4-5 19.9 0 62.42 4.16 J4-6 23 0 61.67 3.78 J4-7 26 0 60.91 3.42 J5-1 31.2 0 78.73 4.65 J5-2 28 0 79.89 5.08 J5-3 46.2 (N/A) (N/A) (N/A) 17/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Label Elevation (m) Demand (m³/h) J5-4 28 0 Hydraulic Grade (m) 79.36 Rev.: 00 Pressure (Bar) 5.03 J5-5 30 0 78.82 4.78 J5-6 32.01 (N/A) (N/A) (N/A) J5-7 33.69 (N/A) (N/A) (N/A) J5-8 37.28 (N/A) (N/A) (N/A) J5-9 41.39 (N/A) (N/A) (N/A) J5-10 47.36 (N/A) (N/A) (N/A) J5-11 30.38 0 78.63 4.72 J6-1 52 0 116.21 6.28 J6-2 56.8 0 110.77 5.28 J6-3 63.67 0 105.32 4.08 J6-4 69.6 0 99.87 2.96 J6-5 75.6 0 94.42 1.84 J6-6 88.36 0 88.97 0.06 J6-7 98 0 83.52 -1.42 J7-1 15 0 13.7 -0.13 J7-2 14.04 0 22.95 0.87 J7-3 11.05 0 41.15 2.95 J8-1 14.04 (N/A) (N/A) (N/A) J8-2 14.54 0 78.65 6.27 J8-3 41.68 0 76.67 3.42 J8-4 15.82 (N/A) (N/A) (N/A) J8-5 18.09 (N/A) (N/A) (N/A) J8-6 20.73 (N/A) (N/A) (N/A) J8-7 23.12 (N/A) (N/A) (N/A) J8-8 24.95 (N/A) (N/A) (N/A) J8-9 28.17 (N/A) (N/A) (N/A) J8-10 30.37 (N/A) (N/A) (N/A) J8-11 35.18 (N/A) (N/A) (N/A) J8-12 39.64 (N/A) (N/A) (N/A) J8-13 42.36 (N/A) (N/A) (N/A) J9-1 41.39 0 105.35 6.26 J9-2 44.17 (N/A) (N/A) (N/A) J9-3 45.98 (N/A) (N/A) (N/A) J9-4 49.09 (N/A) (N/A) (N/A) J9-5 51.14 (N/A) (N/A) (N/A) J9-6 51.06 0 104.48 5.23 J9-7 50.5 0 104.28 5.26 J9-8 48.4 0 104.08 5.45 J9-9 55.2 0 103.88 4.76 J9-10 72.5 0 103.69 3.05 J9-11 77.8 0 103.49 2.51 18/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Rev.: 00 Label Elevation (m) Demand (m³/h) J10-1 39.4 0 Hydraulic Grade (m) 76.92 J10-2 31.18 0 78.55 4.64 J10-3 31.82 0 78.37 4.56 J10-4 35.05 0 78.11 4.21 J10-5 37.83 0 77.46 3.88 J10-6 39.1 0 76.89 3.7 J10-7 37.49 0 76.79 3.85 J11-1 30.68 0 75.91 4.43 J11-2 33.91 0 73.2 3.85 J11-3 37.79 0 70.49 3.2 J11-4 42.48 0 67.78 2.48 J11-5 49 0 65.07 1.57 J12-1 38.55 0 76.61 3.72 J12-2 40.73 0 76.43 3.49 J12-3 39.63 0 76.25 3.58 J12-4 42.02 0 76.07 3.33 J12-5 39.65 0 75.88 3.55 J12-6 34.23 0 75.7 4.06 Pressure (Bar) 3.67 J12-7 28.1 0 75.52 4.64 J13-1 19.03 0 77.85 5.76 J13-2 30.32 0 77.03 4.57 J13-3 38.02 0 76.8 3.8 J13-4 14.23 0 78.38 6.28 J13-5 16.62 0 78.1 6.02 J13-6 21.98 0 77.64 5.45 J13-7 24.23 0 77.44 5.21 J13-8 25.91 0 77.24 5.02 J13-9 30.23 0 77.04 4.58 J13-10 31.83 0 76.91 4.41 J13-11 39.59 0 76.79 3.64 J13-12 39.26 0 76.71 3.67 J14-1 51.06 0 105.1 5.29 J14-2 45.63 0 105.27 5.84 J14-3 47.93 0 105.19 5.6 J14-4 50.6 0 105.12 5.34 J14-5 52.18 0 105.08 5.18 J14-6 50.17 0 105.06 5.37 J16-1 10 0 59.29 4.82 S2 28 25 60.16 3.15 S3 13.7 30 63.59 4.88 S4 12.1 30 62.71 4.95 19/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Hydraulic Grade (m) 62.41 Rev.: 00 Label Elevation (m) Demand (m³/h) Pressure (Bar) S5 12.5 30 S6 10.1 30 61.68 5.05 S7 12 30 61.13 4.81 S 8-9 8.8 30 59.11 4.92 S 10 10 30 55.95 4.5 S 10A 15 300 13.1 -0.19 4.88 S 11 14 30 26.4 1.21 S 12A 52.5 30 63.99 1.12 S 13 49.04 30 65.06 1.57 S 14 19.6 20 77.83 5.7 S 15 29.43 20 76.98 4.65 S 16 37.45 20 76.77 3.85 S 17 34.9 10 78.22 4.24 S12 38 (N/A) (N/A) (N/A) S12-1 40.02 70 76.88 3.61 S12-2 24.65 70 75.34 4.96 S18 98.3 60 83.11 -1.49 S19 88.5 10 103.33 1.45 S20 51.1 20 104.57 5.23 S21 48.54 30 105.05 5.53 20/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Rev.: 00 Main PS Sadaah PS1 Figure (A.1) Hydraulic Profile for Main Pipeline (from Main PS to Sadaah PS1) Itten PS1 Main PS Figure (A.2) Hydraulic Profile for Main Pipeline (from Main PS to Itten PS1) 21/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Rev.: 00 Itten PS2 Itten PS1 Figure (A.3) Hydraulic Profile for Main Pipeline (from Itten PS1 to Itten PS2) Sadaah PS2 Sadaah PS1 Figure (A.4) Hydraulic Profile for Main Pipeline (from Sadaah PS1 to Sadaah PS2) 22/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Rev.: 00 Table (A.3) Pump Report Label Elevation (m) Flow (Design) (m³/h) Head (Design) (m) MAIN PS ITTEN PS1 ITTEN PS2 19.50 26.50 50.70 900 300 60 50.00 50.00 65.00 Flow (Actual) (m³/h) 867 270 60 SADAAH PS1 13.20 120 65.00 120 65.00 SADAAH PS2 40.10 60 65.00 60 65.00 Head (Actual) (m) 51.19 53.17 65.00 Table (A.4) FCV Report Label Elevation (m) Diameter (mm) FCV-Itten 1 28.00 400.0 Flow Setting (m³/h) 300 FCV-Itten 2 52.78 150.0 60 FCV-Sadaah 1 15.00 250.0 120 FCV-Sadaah 2 41.69 200.0 60 Flow (Actual) (m³/h) 300 60 2 60 23/24 DESIGN &DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM HYDRAULIC CALCULATIONS FOR DHOFAR MUNICIPALITY TSE NETWORK Figure (4.1) The Node Diagram of Dhofar Municipality TSE Pipelines 24/24 Rev.: 00