N: EL 1 B E: 887 OW 18 3 70 19 90° 81 .68 .6 8 3 0 .18 30 29 8 + 3 0 :0 87 9. ST :18 709 N :18 E 55 -1 G IN SS G RO Ø Ø 20 35 0 .14 35 53 6 + 3 9 :0 87 2. ST :18 714 N :18 E 5 0 KEY PLAN 5 7500 600 ST:0+ .02 7494 N:188 88.60 2 E:187 E=18 E=18 7100 7100 E=18 35 5 Ø 200 Ø 355 E=18 7200 7200 E=18 Ø 500 0 mm T ELINE ∅500 TIE IN POIN ISTING PIP X E O T D E CONNECT W-1 ST:0+000 S-1 5 .6 6 0 1 N:1887 8 E:187231.0 0 Ø 20 ELBOW 45° N:1887129.36 E:187181.36 20 Ø Ø 0 .02 50 25 2 + 4 6 :0 87 4. ST :18 727 N :18 E ELBOW 90° N:1887428.78 E:187281.49 ST:0+700 N:1887584.34 E:187317.50 1 -2 35 5 2 7250 W Ø ST:0+050 5 N:1887126.4 2 .4 E:187196 4 E=18 ST:0+650 5 N:1887535.1 5 .5 E:187308 1 Ø ° 90 1 W 6.4 9 BO 47 .1 EL 87 255 18 87 N: E:1 0 .06 45 01 3 + 4 7 :0 87 0. ST :18 723 N :18 E 0 20 0 . 70 55 5 + 46 11 :0 87 1. ST 8 726 1 N: :18 E 0 .07 10 0 + 16 28 :0 87 5. ST 18 16 N: 187 E: 35 7250 E=18 3 5 Ø 88 N=1 0 .36 15 04 8 + 0 :0 872 2. ST 18 714 N: :18 E 0 .10 40 77 5 + 3 8 :0 87 86. T S :18 71 N :18 E A- 7000 E=18 0 .65 20 48 8 + 8 :0 872 8. ST 8 711 1 N: :18 E Ø 0 20 0 .95 25 2 + 29 69 : 0 87 5. ST 8 09 1 N: 187 E: 0 15 0 7 0X 16 5 C- 35 / .9 FC 0X 355 92 9 35 EE 872 95.6 8 0 T 1 7 N: :18 E 887 0 00 8870 N =1 0 00 88700 N=1 N =1 AD O CR Ø 7500 725 0 7000 E=18 88 N=1 88 N=1 7000 E=18 LEGEND Ø355 Ø 200 PROPOSED PIPELINE ELBOW 45° N:1887501.30 E:187302.39 EXISTING PIPELINE W WASHOUT VALVE CHAMBER ELBOW 90° N:1887119.41 E:187232.87 A AIR VALVE CHAMBER S ISOLATION VALVE CHAMBER N=1 50 8872 N=1 G GATE VALVE WITH SURFACE BOX 0 0 8875 00 8870 N=1 7250 E=18 ROAD / WADI CROSSING 39 ELBOW 90° SHALL BE 1.00 METER. 6. CONCRETE ENCASEMENT TO BE PROVIDED WHEN THE DEPTH OF COVER IS LESS THAN 1.00 M . ELBOW 90° 32 5. THE MINIMUM DEPTH OF PIPELINE ABOVE THE CROWN OF PIPE ELBOW 90° 33 4. VALVES AND PIPELINE APPURTENANCES ARE DUCTILE IRON. FCC-7 Elevation 34 USED AND AS SPECIFICATION. TEE 355/160 35 3. PIPE FITTINGS SHALL BE COMPATIBLE WITH THE PIPE MATERIAL ELBOW 45° 36 2. THE PIPE MATERIAL SHALL BE HDPE - PN16. ELBOW 90° 37 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED. CONNECTED TO EXISTING PIPELINE 38 GENERAL NOTES: Project: 31 DESIGN & DETAILED ENGINEERING W.R.T O&M OF SALALAH WASTE WATER SYSTEM ROAD CROSSING 30 29 WADI CROSSING Client: 28 Contractor: engineering & contracting SAOG 30.74 30.00 29.85 30.68 31.10 W-2 32.16 32.34 32.31 32.32 31.89 31.85 A-1 31.14 W-1 30.62 GROUND ELEVATION (m) S-1 30.42 VALVE TYPE 26 30.32 VL. SCALE 1:100 HZ. SCALE 1:1000 27 30.38 ITTEN LINE PART(1/5) P.O. BOX 533 : MUSCAT : SULTANATE OF OMAN 28.28 28.05 28.49 1.86 1.57 1.95 2.25 50 22 -10.83‰ 28 15.52‰ AAW &PARTNERS CONSULTING ENGINEERS Drawing title: PLAN AND LONDTUDINAL PROFILE ITTEN PIPELINE - PART (1/5) FROM STN 0+000 TO 0+600 0+600 28.83 1.73 1.05‰ 50 0+572 29.37 2.25 50 0+550 29.91 2.49 50 0+500 29.86 2.51 50 0+450 29.80 2.45 27 0+400 29.77 2.27 23 0+350 29.62 2.56 50 0+300 29.29 2.18 50 0+273 28.96 1.98 50 6.59‰ SLOPE DIAMETER (mm) 50 0+250 28.63 2.11 40 0+200 28.30 2.27 0+010 10 0+150 28.05 2.40 DISTANCE BETWEEN STATION & CUMULATIVE DISTANCE (m) 0+100 27.98 DEPTH TO PIPE INVERT (m) 0+050 PIPE INVERT LEVEL (m) 0+000 Contractor's Designer: Drawn Checked Approved HA MH MH HDPE -16 BAR -Ø355 HDPE -16 BAR -Ø355 HDPE -16 BAR -Ø355 HDPE -16 BAR -Ø355 HDPE -16 BAR -Ø355 HDPE -16 BAR -Ø355 Drawing Number 1/100 Scale: VL: HZ: 1/1000 Size: A1 Date: APRIL 2023 Sheet: 02 EN-WPR-01 Rev: 02 7000