Uploaded by haronb

QSM Part 7.1.2

advertisement
Subnet Services Ltd.
Quality System Procedure
Section
7.1.2
Subject
Welder Qualification
Procedure
Revision
D
Issue Date
July 18, 2018
Reference AWS QC 4-89; ISO
9001:2008 Element 7.1 Customer
Related Processes
1.0
Purpose
1.1
2.0
To establish a procedure for processing Welders Certification in a manner
that is consistent, and ensures accuracy and customer satisfaction.
Scope
2.1
3.0
Page 1 of 7
This procedure is applicable to all Welder Certification qualified by Subnet
Services Ltd., and to all personnel who are authorized to perform the
qualification function.
Responsibility and Authority
3.1
The Technical Manager and the Test Supervisor is responsible for ensuring
this procedure is followed, and is authorized to take any action necessary to
ensure compliance. All Subnet Services Ltd. employees authorized to
perform the qualification is responsible for following this procedure.
The staffs are responsible for expediting the customer application until the
applicant determine the result on compliance to the requirement, including
keeping track of progress, to maximize customer satisfaction.
4.0
Procedure
4.1
Application
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
The applicant shall complete the application form (QC-WF4A)
The applicant shall complete the Maintenance of Certification
(QC-WF3A)
The application form shall identify the Welders Performance
Qualification for which certification is being sought.
The applicant shall have photographic identification, such as driver’s
license or similar document that has the photograph as an integral
part of the document.
The applicant shall submit the completed application form, with
appropriate fees, to the test facility.
With the AWS Welder Candidate package, Shop safety information
should be read, understood and signed for SUBNET SERVICES Ltd.
Follows and complies with ANSI Z49.1 (Current Version) - Safety in
Welding, Cutting and Allied Process, for all internal and external
procedures regarding safety.
Uncontrolled if printed
Subnet Services Ltd.
Quality System Procedure
Section
7.1.2
Subject
Welder Qualification
Procedure
Revision
D
Issue Date
July 18, 2018
Reference AWS QC 4-89; ISO
9001:2008 Element 7.1 Customer
Related Processes
Page 2 of 7
4.2
The appropriate Welding Procedure Specifications (WPS) and Performance
Test Description stated in the Welders Performance Qualification shall be
used to qualify the welders.
4.3
The Test Supervisor shall explain to the applicant the requirement of Welding
Procedure Specification.
4.4
A Welders Identification Code shall be assigned to applicant and recorded to
applicant’s Welders Performance Qualification Test Record.
4.5
If any, the test supervisor shall note the used of and type of eye correction on
the Welders Performance Qualification Test Record.
4.6
Only test materials that had a Test Material Identification Number shall be
used for qualification testing and shall be recorded to applicant’s Welders
Performance Qualification Test Record There follows a list of the ID letters
will be use and then a full description on implementation.
SN
X
M
F
S
xxxxx
xxxxx
xxxxx
xxxxx
xx
This is the Student Subnet Student ID
This is the Student Test Coupon ID
This is the Subnet Materials Batch Number ID
This is the Subnet Filler Metal Batch Number ID
This is the Specimen Cut from Coupon ID
Generating ID Numbers Requirement:
4.6.1. Subnet Student ID:
Using letters SN + an incremental number. This is the ID number that
will be given to student / CW applicant, for referencing and office data
recording.
4.6.2. Student Test Coupon:
Call this the Coupon ID using a letter X + an incremental number. This
will be given to the student / CW Applicant for each coupon test taken
and will be marked on the coupon / test piece using metal stencil. If
coupon numbers reach X9999, letter and number suffix will be stamp;
e.g. XA-1, XA-2.
Uncontrolled if printed
Subnet Services Ltd.
Quality System Procedure
Section
7.1.2
Subject
Welder Qualification
Procedure
Revision
D
Issue Date
July 18, 2018
Reference AWS QC 4-89; ISO
9001:2008 Element 7.1 Customer
Related Processes
4.6.3
Page 3 of 7
Material Batch ID:
Using a letter M + an incremental number start at 01. The ID given to
each batch of base metal delivered to the Facility. When material
arrives it will have a Mill Certificate that states the metal it’s standard
and conforms to X (coupon) like carbon steel pipe, plate, sheet. There
may be more than one batch of material delivered at any time, e.g. 3
x 20ft lengths MS steel pipe 6” diameter with a company X mill cert no
xxx123 5 sheet of plate 10mm thick stainless with a company Y mill
cert xxx9981234555.
The delivered material will be sorted into batches that belong to the
mill certificates.
Using our facility own incremental Material Batch ID for all that
matches any mill certificate. So the 3 lengths pipe would have a
subnet batch no of M1.
The 5 sheets would all have batch number M2.
Each unit in the batch will be stamped or marked.
Each time a unit is divided / cut then the batch number will be
duplicated to all sections divided from the original length.
So if a 20ft length of pipe with a Material Batch ID of M1 is cut into 20
sections then all those 20 sections will be stamped with the same
Material Batch ID (M1) as the original length.
Important: Any material delivered without a supporting qualified Mill
Certificate must not be given a Materials Batch ID but must be
separated from our Testing Material, marked as nonconforming and
shall not be used for AWS Test Coupons.
4.6.4
Filler Material ID:
Using a letter F + an incremental number: Filler material will mostly be
welding electrodes. We will make Purchase Order (PO) for specific
rods. When delivered the filler material will be in batches, each batch
will have a Certificate of Conformance. We will sort the filler material
into batches as per to the certificates and we will label each batch with
our own incremental batch number, e.g. 5 boxes of 10g steel filler
belong to company certificate xxx22232345 we issue our Filler
Material ID (F1) and so on. We place the label F1 on all 5 boxes.
Uncontrolled if printed
Subnet Services Ltd.
Quality System Procedure
Section
7.1.2
Subject
Welder Qualification
Procedure
Revision
D
Issue Date
July 18, 2018
Reference AWS QC 4-89; ISO
9001:2008 Element 7.1 Customer
Related Processes
Page 4 of 7
Important: Any filler material delivered without a supporting Qualified
Mill Certificate must not be given a Filler Materials Batch and must be
separated from our Testing Material, marked as nonconforming and
shall not be used for AWS Test Coupons.
4.7 A Welders Identification Code shall be marked to test materials or test assembly
4.8 Check safety compliance of applicant applicable for the welding process.
4.9 The Test Material Identification Code of base metal and filler metal shall be
verified by the Test Supervisor. Also the Welder Identification Code of the
applicant and the marking on the test assembly shall also be verified.
4.10 If any, the energy source of machine, fluxes and gases shall be checked by the
Test Supervisor.
4.11 If any, the applicant shall adjust the machine setting to meet those of the WPS.
4.12 Performance Test
4.6.1
The applicant shall assemble the specified test assembly for welding
in accordance with the WPS and verified by the Test Supervisor.
4.6.2
The applicant shall place the test assembly in the specified welding
position and verified by the Test Supervisor.
4.6.3
The test assembly shall be tack welded and mark to secure it in such
a manner that it remains in the specified position until welding has
been completed.
4.6.4
The test assembly shall be welded by the applicant in accordance with
the WPS.
4.6.5
The test assembly is prepared for examination and testing based on
the requirement of WPS.
Uncontrolled if printed
Subnet Services Ltd.
Quality System Procedure
Section
7.1.2
Subject
Welder Qualification
Procedure
Revision
D
Issue Date
July 18, 2018
Reference AWS QC 4-89; ISO
9001:2008 Element 7.1 Customer
Related Processes
4.13
Page 7 of 7
Examination Method and Acceptance Standard
4.13.1
Visual examination shall be performed by the Test Supervisor on the
test assembly and shall meet the visual acceptance criteria specified
in the Performance Test Description.
4.13.2
If applicable, a mechanical testing shall be performed on the test
assembly and shall meet the acceptance criteria specified in the
Performance Test Description. The test supervisor shall interpret the
result.
4.13.3
If applicable, The Welders Identification code shall be transferred to
the bend specimens.
4.13.4
If applicable, Radiographic Examination shall be performed on the
test assembly as an alternate to mechanical testing and shall meet
the acceptance criteria specified in the Performance Test Description
4.13.5
The Welders Identification Number should appear on the result of
examination and testing including x-ray film when radiography is
used. After the test pipe (s) meet the visual acceptance criteria
defined in ASME B31.3 and in case of radiography will be used in
lieu of bend test for pipe coupons. A Radiography Test Request will
be send to Subnets Services Ltd. accredited & authorized NDT Third
Party. Request will be contained a system of identification for the
samples or items to be tested through documents or through
markings, to ensure that there can be no confusion regarding the
identity of the samples or test items and the result of the
measurements made. (see NDE and Destructive Request Form).
4.13.6
The NDT Third Party will pick the samples from the Testing Facility,
but strict precaution shall be taken to prevent damage to the items,
for example; contamination, corrosion or the application of stress,
any of which would invalidate the results.
Uncontrolled if printed
Subnet Services Ltd.
Quality System Procedure
Section
7.1.2
Subject
Welder Qualification
Procedure
Revision
D
Issue Date
July 18, 2018
Reference AWS QC 4-89; ISO
9001:2008 Element 7.1 Customer
Related Processes
Page 7 of 7
All coupons sent to 3rd party Testing Contractors will be logged IN &
OUT using a Facility Coupon Testing Transfer log entry. This Log
entry includes at minimum:
1. Date
2. Subnet Coupon ID
3. Direction (IN/OUT)
4. Testing Contractor
5. NDE Form No.
6. Noted By
All Transfer of coupons must include a copy of the Non Destructive
Examination & be logged / noted by the Test Facility Representative.
4.13.7 Radiographic examination shall meet the acceptance criteria as
defined in ASME Section IX (QW302.2). Personnel performing the
Radiographic examination shall be qualified to a written practice
prepared in accordance with the ASNT-SNT-TC-1A, Level I and II.
The personnel interpreting the film are Qualified Level II.
4.13.8 After examination, the NDT Third Party will bring back all the samples
to the Testing Facility with ample care together with RT Film and
original RT Test results documents.
4.14
Retest
4.14.1 The welder performance test fails to meet the requirements, a retest
may be allowed as specified in the AWS Standard QC7 and its
applicable supplement.
4.15
Documentation of Welder Performance Qualification
4.15.1. A Welders Performance Qualification Test Record Form shall be
Fill up for each applicant.
4.15.2. The result of the examination and testing and the performance
Qualification data shall be recorded to Welders Performance
Qualification Test Record.
4.15.3. All test reports shall be reviewed by the Facility Representative.
Uncontrolled if printed