Hydrostatic Tester Plan Current State: 1.- Relace clamping plates to original plates 2.- Attach needle valve. 3.- Connect safety interlock/Emergency Stop 4.- Connect transformer (M. Barlett). 5.- Attach feedback tube. Phase One (Hydraulic): 1.- Replace mechanical/analog controls and readouts. 2.- Program PLC: - Valve diameter and hydro pressure. - Determine clamp force. - Allow operator to manually jog ram to position before pressure (electric motor). - Button to depressurize. 3.- HMI: -Hydraulic Pressure readout. Phase Two (Hydro): 1.- Replace mechanical readouts and controls. 2.- Add Hydro to PLC program: - Fill valve. - Remove air bubbles. - Time test. - Drain. 3.- HMI: - Hydro Pressure readout. - Timer readout. Inputs/Outputs: Inputs: - Jog Open. - Jog Close. - Pressurize. - Depressurize. - Pressure input (could be valve size and test pressure). Pressure Gauge. Outputs: Relay to Electric motor. Valve to pneumatic motor. Open drain. Close drain. No-feedback solenoid open and close. Directional solenoid open. Directional solenoid close. - Pressure readout.