SPP DOCUMENT NO. 203 - SPECIALIZED ARCHITECTURAL SERVICES - Design services, but not limited to: NO. DESIGN SERVICE DESCRIPTION a. Sec. 3 and 14 of R.A 9266 1 2 3 SCOPE MANNER OF PROVIDING SERVICE a. Works on development concept Into contract as: b. Plans and design AI of buildings a. AoR and CA (dual capacity) b. Detailed planning and desgin c. As a specialist: b. CA only of indoor/enclosed areas _Prescribe space plans, diagrams, computations _Layout, prescribe and specify AI components ARCHITECTURAL INTERIORS _Assist client in bids or negotiation with c. Architect must be sufficiently GC, subcons and suppliers experienced in planning, design _Check and approve sample materials and detailing of AI elements and shop drawings _Review/Approve billing _Final inspection/Approval of installed AI components a. Detailed planning and desgin a. Check compatibility and compliance of Into contract as: to control sound transmission all inputs from inter-disciplinary works a. AoR and CA (dual capacity) b. Answer acoustical demands b. As a specialist: b. CA only of varied activities _Prepare drawings and specifications _Assist client in bids or negotiation with ACOUSTIC DESIGN SERVICES specialty subcontractor _Check and approve sample materials and equipment _Final inspection of work & equipment _Assist client in evaluation amount due to subcontractor a. Detailed planning and desgin a. Check compatibility and compliance of Into contract as: for light transmission, timing all inputs from inter-disciplinary works a. AoR and CA (dual capacity) and control b. As a specialist: b. CA only ARCHITECTURAL LIGHTING b. Answer lighting demands of _"2" LAYOUT AND DESIGN varied activities METHOD OF COMPENSATION a. For extensive detailing of AI components - % of cost of AI work (AR fee only) b. Specialist Consultants - PF c/o client c. Fee for AR's services - under Architect's Guidelines a. AR fee depends on complexity of work b. Specialist Consultants - PF paid directly by client to SC c. Fee for AR's services - under Architect's Guidelines a. AR fee depends on complexity of work b. Specialist Consultants - PF paid directly by client to SC c. Cost of work = TC of all fixture and accessories c. Fee for AR's services - under Architect's Guidelines NO. 4 5 DESIGN SERVICE DESCRIPTION SCOPE MANNER OF PROVIDING SERVICE a. Studies existing environment a. Design of surroundings Into contract as: b. As a specialist: in relation to a. AoR and CA (dual capacity) _Conceptualize entire SDP building/structure; Layout the b. CA only _Conceptualize specifications for areas/grounds surrounding the SITE DEVELOPMENT PLANNING b. Landscaping layout of small needed civil works and utility lines (SDP) SERVICES building projects; RLPs qualified _Assist client in bids or negotiation with as SCs for large scale projects specialty subcontractor; but mainly when SC is unavailable a. Orderly arrangement of a. SA provides multi-dimensional point of Into contract as: vertical and horizontal views, while AR provides 2D physical plan a. AoR and CA (dual capacity) b. AR as lead roles and acts as logical prime professional for b. CA only c. Concerned with immediate directing team efforts surroundings - effects & impact b. General quality of the setting for natural d. Physical plan: in-depth study or man-made phenomenon of site's economic systems, c. Site planning laws, tax, infrastructure, d. Further services, studies and analysis by utilities, and other components RLPs, with AR as lead professional of the SITE AND PHYSICAL PLANNING physical planning team (including MASTER e. Expert advice and validation of certain DEVELOPMENT PLANNING, features of the physical plan, by SC SUBDIVISION PLANNING and f. Commissions to do physical planning: URBAN DESIGN) SERVICES _Confer requirements and data _Examine laws, ordinances, rules and regulations and practices applicable _Prepare FRDPs and CMDPs _Prepare PMDPs to DMDPs _Prepare SPPCC _Undertake modifications and revisions _Prepare finalized plans, reports & specs. _Prepare phasing of construction _Prepares PCO based on current costs METHOD OF COMPENSATION a. AR fee depends on estimated cost of civil and landscaping works, depending on complexity of project If AR is also a RLP - eg. a LA, then AR fee shall increase b. Specialist Consultants - PF paid directly by client to SC c. Fee for AR's services - under Architect's Guidelines Fee for AR's services - under Architect's Guidelines NO. 6 7 8 DESIGN SERVICE DESCRIPTION SCOPE MANNER OF PROVIDING SERVICE a.1. CDP to formulation of MDP a. RLA + EnP Into contract as: _Data base gathering a.2. Preparation of EIA/EIS a. AoR and CA (dual capacity) b. Physical translations of _Preparation of EIA/EIS b. CA only inputs from initial stages of CDP _Formulation of CDP c. Synthesize and organize into _including other components: a whole various information _Physical component across various discipline _Economic component d. CA on land use and human _Socio-Cultural component environment; EnP on physical _Transport component and land use planning - either is _Legal and Administrative component COMPREHENSIVE qualified to lead, if with social b. SCs DEVELOPMENT PLANNING commitment and technical _Detailed study of CDP components (CDP) SERVICES experience c. CA _on CDP efforts: _Identify existing land use, resources, social behaviour and interaction _Environmental, Demographic analysis and feasibility studies _Examine existing laws, ordinances, political/social constraints _Prepare conceptual DPs, policies and strategies a. Provide: a. CA _Research HISTORIC AND HERITAGE _Assessment CONSERVATION AND ~ _Recording PLANNING _Management _Interpretation and conservation of historical heritage a. Arrange and formulate methods of a. CA SECURITY EVALUATION AND rating and ascertaining the value of ~ PLANNING structures or facilities METHOD OF COMPENSATION a. AR fee = Man-months x Factor of Direct and Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. AR fee = Man-months x Factor of Direct and Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and Architect's Guideliness NO. DESIGN SERVICE 9 BUILDING SYSTEMS DESIGN 10 FACILITIES MAINTENANCE SUPPORT 11 BUILDING TESTING AND COMMISSIONING 12 13 14 15 BUILDING ENVIRONMENT CERTIFICATION FORENSIC ARCHITECTURE BUILDING APPRAISAL STRUCTURAL CONCEPTUALIZATION DESCRIPTION ~ ~ ~ a. Building environment rating system is needed to evaluate environmental performance of a building: _Credit-based _Flexible _Consensus-based and market-driven ~ Appraisal: act of process of estimating value ~ SCOPE a. Engage in methods of producing building components in a highly engineered, efficient and cost-effective a. Provide owner with means to ensure proper function and maintenance of the building and site after final inspection a. Recommends systematic processes of ensuring building's operational needs MANNER OF PROVIDING SERVICE METHOD OF COMPENSATION a. RLA a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. CA a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. RLA a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. Knowledge on Green Architecture and a. CA Environmental / Sustainable design b. Knowledge on governing environmental laws, investigation processes under international protocols: _RA. 8749 _RA. 9003 _RA. 9275 _DENR administrative issuances a. Scientific study on built environment's a. RLA well-being to be able to provide recommendations. It includes: _Causes of deterioration _Building deficiencies _Faulty activities & operations _Faulty plan, design and construction methodology a. Places value on building condition, a. CA defects, repair,maintenance and improvements a. Conceive, choose and develop type, a. RLA disposition, arrangement and proportioning of structural elements considering: safety, cost-effective, function a. AR fee = Man-months x Factor of Direct and Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. AR fee = Man-months x Factor of Direct and Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines NO. DESIGN SERVICE DESCRIPTION 16 PRELIMINARY SERVICES ~ 17 18 19 20 21 CONTRACT DOCUMENTATION AND REVIEW SERVICES POST-DESIGN SERVICES (including CONSTRUCTION SERVICES) DISPUTE AVOIDANCE AND RESOLUTION ARCHITECTURAL RESEARCH METHODS SPECIAL BUILDING / FACILITY PLANNING AND DESIGN ~ ~ ~ ~ ~ SCOPE MANNER OF PROVIDING SERVICE a. More knowledge on services under SPP a. CA Doc. 201 a. More knowledge on : a. RLA _Specification writing _Estimation and quantity survey _Architectural production _Architectural software _Architectural support services _Contract document review a. More knowledge on services under SPP a. CA Docs. 204, 206 and 207 b. Preparation of FALAR a. More knowledge on various modes of a. RLA specializing in ADR ADR under RA. 9285 a. More knowledge on: a. CA _Research methods _Philippine architecture and its history _Architectural materials and finishes _Building types and standards _Architectural design trends _Architectural writing _Architectural photography a. More knowledge on planning and a. RLA design processes required for: _Housing developments _Recreational and tourism estates _Healthcare and hospitality facilities _Transportation and telecommunications _Production and extractive facilities _Utility-related developments _Secure facilities _Business and industrial parks _Economic zones & community arch're METHOD OF COMPENSATION a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and AR Guidelines a. AR fee = Man-months x Factor of Direct and Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and AR Guidelines a. AR fee = Man-months x Factor of Direct and Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. AR fee = Man-months x Factor of Direct and Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines NO. DESIGN SERVICE 22 BUILDING COMPONENTS 23 MANAGEMENT OF ARCHITECTURAL PRACTICES DESCRIPTION ~ ~ SCOPE a. Much more knowledge on: _Building materials and finishes _Construction Methodologies _Building envelopes _Architectural fenestration _Architectural hardware, fixtures and fittings a. Much more knowledge on: _BPO operations _KPO operations MANNER OF PROVIDING SERVICE METHOD OF COMPENSATION a. CA a. AR fee = Man-months x Factor of Direct and Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines a. RLA a. AR fee = Man-months x Factor of Direct & Indirect costs b. SPP Doc. 201, 202 and Architect's Guidelines