SPP DOCUMENT NO. 203 - SPECIALIZED ARCHITECTURAL SERVICES - Design services, but not limited to:
NO.
DESIGN SERVICE
DESCRIPTION
a. Sec. 3 and 14 of R.A 9266
1
2
3
SCOPE
MANNER OF PROVIDING SERVICE
a. Works on development concept
Into contract as:
b. Plans and design AI of buildings
a. AoR and CA (dual capacity)
b. Detailed planning and desgin
c. As a specialist:
b. CA only
of indoor/enclosed areas
_Prescribe space plans, diagrams,
computations
_Layout, prescribe and specify AI
components
ARCHITECTURAL INTERIORS
_Assist client in bids or negotiation with
c. Architect must be sufficiently
GC, subcons and suppliers
experienced in planning, design
_Check and approve sample materials
and detailing of AI elements
and shop drawings
_Review/Approve billing
_Final inspection/Approval of installed
AI components
a. Detailed planning and desgin a. Check compatibility and compliance of Into contract as:
to control sound transmission all inputs from inter-disciplinary works
a. AoR and CA (dual capacity)
b. Answer acoustical demands b. As a specialist:
b. CA only
of varied activities
_Prepare drawings and specifications
_Assist client in bids or negotiation with
ACOUSTIC DESIGN SERVICES
specialty subcontractor
_Check and approve sample materials
and equipment
_Final inspection of work & equipment
_Assist client in evaluation amount due
to subcontractor
a. Detailed planning and desgin a. Check compatibility and compliance of Into contract as:
for light transmission, timing
all inputs from inter-disciplinary works
a. AoR and CA (dual capacity)
and control
b. As a specialist:
b. CA only
ARCHITECTURAL LIGHTING
b. Answer lighting demands of
_"2"
LAYOUT AND DESIGN
varied activities
METHOD OF COMPENSATION
a. For extensive detailing of AI
components - % of cost of AI
work (AR fee only)
b. Specialist Consultants - PF
c/o client
c. Fee for AR's services - under
Architect's Guidelines
a. AR fee depends on complexity of work
b. Specialist Consultants - PF
paid directly by client to SC
c. Fee for AR's services - under
Architect's Guidelines
a. AR fee depends on complexity of work
b. Specialist Consultants - PF
paid directly by client to SC
c. Cost of work = TC of all
fixture and accessories
c. Fee for AR's services - under
Architect's Guidelines
NO.
4
5
DESIGN SERVICE
DESCRIPTION
SCOPE
MANNER OF PROVIDING SERVICE
a. Studies existing environment a. Design of surroundings
Into contract as:
b.
As
a
specialist:
in relation to
a. AoR and CA (dual capacity)
_Conceptualize entire SDP
building/structure; Layout the
b. CA only
_Conceptualize specifications for
areas/grounds surrounding the
SITE DEVELOPMENT PLANNING b. Landscaping layout of small needed civil works and utility lines
(SDP) SERVICES
building projects; RLPs qualified
_Assist client in bids or negotiation with
as SCs for large scale projects specialty subcontractor; but mainly when
SC is unavailable
a. Orderly arrangement of
a. SA provides multi-dimensional point of Into contract as:
vertical and horizontal
views, while AR provides 2D physical plan a. AoR and CA (dual capacity)
b. AR as lead roles
and acts as logical prime professional for b. CA only
c. Concerned with immediate directing team efforts
surroundings - effects & impact b. General quality of the setting for natural
d. Physical plan: in-depth study or man-made phenomenon
of site's economic systems,
c. Site planning
laws, tax, infrastructure,
d. Further services, studies and analysis by
utilities, and other components RLPs, with AR as lead professional of the
SITE AND PHYSICAL PLANNING
physical planning team
(including MASTER
e. Expert advice and validation of certain
DEVELOPMENT PLANNING,
features of the physical plan, by SC
SUBDIVISION PLANNING and
f. Commissions to do physical planning:
URBAN DESIGN) SERVICES
_Confer requirements and data
_Examine laws, ordinances, rules and
regulations and practices applicable
_Prepare FRDPs and CMDPs
_Prepare PMDPs to DMDPs
_Prepare SPPCC
_Undertake modifications and revisions
_Prepare finalized plans, reports & specs.
_Prepare phasing of construction
_Prepares PCO based on current costs
METHOD OF COMPENSATION
a. AR fee depends on estimated
cost of civil and landscaping
works, depending on
complexity of project
If AR is also a RLP - eg. a LA,
then AR fee shall increase
b. Specialist Consultants - PF
paid directly by client to SC
c. Fee for AR's services - under
Architect's Guidelines
Fee for AR's services - under
Architect's Guidelines
NO.
6
7
8
DESIGN SERVICE
DESCRIPTION
SCOPE
MANNER OF PROVIDING SERVICE
a.1. CDP to formulation of MDP a. RLA + EnP
Into contract as:
_Data
base
gathering
a.2. Preparation of EIA/EIS
a. AoR and CA (dual capacity)
b. Physical translations of
_Preparation of EIA/EIS
b. CA only
inputs from initial stages of CDP _Formulation of CDP
c. Synthesize and organize into
_including other components:
a whole various information
_Physical component
across various discipline
_Economic component
d. CA on land use and human
_Socio-Cultural component
environment; EnP on physical
_Transport component
and land use planning - either is
_Legal and Administrative component
COMPREHENSIVE
qualified to lead, if with social b. SCs
DEVELOPMENT PLANNING
commitment and technical
_Detailed study of CDP components
(CDP) SERVICES
experience
c. CA
_on CDP efforts:
_Identify existing land use, resources,
social behaviour and interaction
_Environmental, Demographic
analysis and feasibility studies
_Examine existing laws, ordinances,
political/social constraints
_Prepare conceptual DPs, policies
and strategies
a. Provide:
a. CA
_Research
HISTORIC AND HERITAGE
_Assessment
CONSERVATION AND
~
_Recording
PLANNING
_Management
_Interpretation and conservation of
historical heritage
a. Arrange and formulate methods of
a. CA
SECURITY EVALUATION AND
rating and ascertaining the value of
~
PLANNING
structures or facilities
METHOD OF COMPENSATION
a. AR fee = Man-months x
Factor of Direct and Indirect
costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
a. AR fee = Man-months x
Factor of Direct and Indirect
costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
a. AR fee = Man-months x
Factor of Direct & Indirect costs
b. SPP Doc. 201, 202 and
Architect's Guideliness
NO.
DESIGN SERVICE
9
BUILDING SYSTEMS DESIGN
10
FACILITIES MAINTENANCE
SUPPORT
11
BUILDING TESTING AND
COMMISSIONING
12
13
14
15
BUILDING ENVIRONMENT
CERTIFICATION
FORENSIC ARCHITECTURE
BUILDING APPRAISAL
STRUCTURAL
CONCEPTUALIZATION
DESCRIPTION
~
~
~
a. Building environment rating
system is needed to evaluate
environmental performance of
a building:
_Credit-based
_Flexible
_Consensus-based and
market-driven
~
Appraisal: act of process of
estimating value
~
SCOPE
a. Engage in methods of producing
building components in a highly
engineered, efficient and cost-effective
a. Provide owner with means to ensure
proper function and maintenance of the
building and site after final inspection
a. Recommends systematic processes of
ensuring building's operational needs
MANNER OF PROVIDING SERVICE
METHOD OF COMPENSATION
a. RLA
a. AR fee = Man-months x Factor of Direct &
Indirect costs
b.
SPP Doc. 201, 202 and Architect's Guidelines
a. CA
a. AR fee = Man-months x Factor of Direct &
Indirect costs
b.
SPP Doc. 201, 202 and Architect's Guidelines
a. RLA
a. AR fee = Man-months x Factor of Direct &
Indirect costs
b.
SPP Doc. 201, 202 and Architect's Guidelines
a. Knowledge on Green Architecture and a. CA
Environmental / Sustainable design
b. Knowledge on governing environmental
laws, investigation processes under
international protocols:
_RA. 8749
_RA. 9003
_RA. 9275
_DENR administrative issuances
a. Scientific study on built environment's a. RLA
well-being to be able to provide
recommendations. It includes:
_Causes of deterioration
_Building deficiencies
_Faulty activities & operations
_Faulty plan, design and construction
methodology
a. Places value on building condition,
a. CA
defects, repair,maintenance and
improvements
a. Conceive, choose and develop type,
a. RLA
disposition, arrangement and
proportioning of structural elements
considering: safety, cost-effective, function
a. AR fee = Man-months x
Factor of Direct and Indirect
costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
a. AR fee = Man-months x
Factor of Direct and Indirect
costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
a. AR fee = Man-months x Factor of Direct &
Indirect costs
b.
SPP Doc. 201, 202 and Architect's Guidelines
a. AR fee = Man-months x
Factor of Direct & Indirect costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
NO.
DESIGN SERVICE
DESCRIPTION
16
PRELIMINARY SERVICES
~
17
18
19
20
21
CONTRACT DOCUMENTATION
AND REVIEW SERVICES
POST-DESIGN SERVICES
(including CONSTRUCTION
SERVICES)
DISPUTE AVOIDANCE AND
RESOLUTION
ARCHITECTURAL RESEARCH
METHODS
SPECIAL BUILDING / FACILITY
PLANNING AND DESIGN
~
~
~
~
~
SCOPE
MANNER OF PROVIDING SERVICE
a. More knowledge on services under SPP a. CA
Doc. 201
a. More knowledge on :
a. RLA
_Specification writing
_Estimation and quantity survey
_Architectural production
_Architectural software
_Architectural support services
_Contract document review
a. More knowledge on services under SPP a. CA
Docs. 204, 206 and 207
b. Preparation of FALAR
a. More knowledge on various modes of a. RLA specializing in ADR
ADR under RA. 9285
a. More knowledge on:
a. CA
_Research methods
_Philippine architecture and its history
_Architectural materials and finishes
_Building types and standards
_Architectural design trends
_Architectural writing
_Architectural photography
a. More knowledge on planning and
a. RLA
design processes required for:
_Housing developments
_Recreational and tourism estates
_Healthcare and hospitality facilities
_Transportation and telecommunications
_Production and extractive facilities
_Utility-related developments
_Secure facilities
_Business and industrial parks
_Economic zones & community arch're
METHOD OF COMPENSATION
a. AR fee = Man-months x Factor of Direct &
Indirect costs
b.
SPP Doc. 201, 202 and AR Guidelines
a. AR fee = Man-months x
Factor of Direct and Indirect
costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
a. AR fee = Man-months x Factor of Direct &
Indirect costs
b.
SPP Doc. 201, 202 and Architect's Guidelines
a. AR fee = Man-months x Factor of Direct &
Indirect costs
b.
SPP Doc. 201, 202 and AR Guidelines
a. AR fee = Man-months x
Factor of Direct and Indirect
costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
a. AR fee = Man-months x
Factor of Direct and Indirect
costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
NO.
DESIGN SERVICE
22
BUILDING COMPONENTS
23
MANAGEMENT OF
ARCHITECTURAL PRACTICES
DESCRIPTION
~
~
SCOPE
a. Much more knowledge on:
_Building materials and finishes
_Construction Methodologies
_Building envelopes
_Architectural fenestration
_Architectural hardware, fixtures and
fittings
a. Much more knowledge on:
_BPO operations
_KPO operations
MANNER OF PROVIDING SERVICE
METHOD OF COMPENSATION
a. CA
a. AR fee = Man-months x
Factor of Direct and Indirect
costs
b. SPP Doc. 201, 202 and
Architect's Guidelines
a. RLA
a. AR fee = Man-months x Factor of Direct &
Indirect costs
b.
SPP Doc. 201, 202 and Architect's Guidelines