Project: Designed By: ME City WHT Date: 17/11/2023 Pilecap Design ( 1BP-600a) Subject: 1200 mm 1500 mm 1050 mm 570 Pile size = Pile WL = 600 mm dia 3525 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 420 mm WL= 570 1) 2938 kN/m mm Say using pilecap depth = 850 mm Ultimate Moment, M = 394 kNm Ultimate shear force, V = 1869 kN Shear stress, v = 2.33 N/mm2 d = 763 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01432 725 mm 1243 mm2 1041 mm2 1243 mm2 provide 7 T 16 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 200 mm from support 1.22 N/mm2 200 0.35 N/mm2 2.68 N/mm2 No shear links required 850 mm Project: ME City Designed By: Subject: Pilecap Design (1BP-900) WHT Date: 1200 mm 1500 mm 1200 mm 480 Pile size = Pile WL = 900 mm dia 7950 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 330 mm WL= 6625 kN/m Say using pilecap depth = 1000 mm Ultimate Moment, M = 546 kNm Ultimate shear force, V = 3300 kN 480 1) mm Shear stress, v = 3.01 N/mm2 d = 913 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01213 867 mm 1441 mm2 1424 mm2 1441 mm2 provide 8 T 16 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 150 mm from support 1.65 N/mm2 150 0.32 N/mm2 3.87 N/mm2 No shear links required 1000 mm 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-1050) 1200 mm 1500 mm 1350 mm 435 Pile size = Pile WL = 1050 mm dia 10800 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 1000 mm 285 mm WL= 9000 kN/m Say using pilecap depth = 1000 mm Ultimate Moment, M = 553 kNm Ultimate shear force, V = 3869 kN 435 1) mm Shear stress, v = 3.14 N/mm2 d = 913 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01092 867 mm 1459 mm2 1602 mm2 1602 mm2 provide 9 T 16 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 150 mm from support 1.49 N/mm2 150 0.32 N/mm2 3.86 N/mm2 No shear links required 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-1200a) 1350 mm 1650 mm 1500 mm 465 Pile size = Pile WL = 1200 mm dia 14125 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 1000 mm 315 mm WL= 10463 kN/m 465 1) mm Say using pilecap depth = 1000 mm Ultimate Moment, M = 784 kNm Ultimate shear force, V = 4969 kN Shear stress, v = 3.63 N/mm2 d = 913 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01394 867 mm 2070 mm2 1780 mm2 2070 mm2 provide 12 T 16 @ 125 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 150 mm from support 1.90 N/mm2 150 0.33 N/mm2 4.06 N/mm2 No shear links required 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-1200b) 2400 mm 2700 mm 1500 mm 990 Pile size = Pile WL = 1200 mm dia 14125 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 1500 mm 840 mm WL= 5885 kN/m Say using pilecap depth = 1500 mm Ultimate Moment, M = 3154 kNm Ultimate shear force, V = 7496 kN 990 1) mm Shear stress, v = 3.54 N/mm2 d = 1413 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.02341 1342 mm 5377 mm2 2755 mm2 5377 mm2 provide 12 T 25 @ 125 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 350 mm from support 2.07 N/mm2 350 0.35 N/mm2 2.87 N/mm2 No shear links required 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-1500a) 2400 mm 2700 mm 1800 mm 900 Pile size = Pile WL = 1500 mm dia 22075 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 750 mm WL= 9198 kN/m Say using pilecap depth = 1650 mm Ultimate Moment, M = 3924 kNm 900 1) mm d = 1563 Ultimate shear force, V = 10444 kN Shear stress, v = 3.71 N/mm2 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01983 1485 mm 6047 mm2 3657 mm2 6047 mm2 provide 14 T 25 @ 125 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 330 mm from support 2.08 N/mm2 330 0.33 N/mm2 3.10 N/mm2 No shear links required 1650 mm 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-1650) 2400 mm 2700 mm 1950 mm 855 Pile size = Pile WL = 1650 mm dia 26725 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 1800 mm 705 mm WL= 11135 kN/m 855 1) mm Say using pilecap depth = 1800 mm Ultimate Moment, M = 4197 kNm d = 1713 Ultimate shear force, V = 11884 kN Shear stress, v = 3.56 N/mm2 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01630 1627 mm 5902 mm2 4342 mm2 5902 mm2 provide 13 T 25 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 350 mm from support 1.79 N/mm2 350 0.30 N/mm2 2.94 N/mm2 No shear links required 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-1800) 2400 mm 2700 mm 2100 mm 810 Pile size = Pile WL = 1800 mm dia 31800 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 1800 mm 660 mm WL= 13250 kN/m 810 1) mm Say using pilecap depth = 1800 mm Ultimate Moment, M = 4373 kNm d = 1713 Ultimate shear force, V = 13228 kN Shear stress, v = 3.68 N/mm2 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01577 1627 mm 6150 mm2 4676 mm2 6150 mm2 provide 14 T 25 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 330 mm from support 1.84 N/mm2 330 0.30 N/mm2 3.08 N/mm2 No shear links required 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-2000) 2400 mm 2700 mm 2300 mm 750 Pile size = Pile WL = 2000 mm dia 39250 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 1800 mm 600 mm WL= 16354 kN/m 750 1) mm Say using pilecap depth = 1800 mm Ultimate Moment, M = 4458 kNm d = 1713 Ultimate shear force, V = 14831 kN Shear stress, v = 3.76 N/mm2 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01468 1627 mm 6268 mm2 5122 mm2 6268 mm2 provide 15 T 25 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 300 mm from support 1.88 N/mm2 300 0.29 N/mm2 3.31 N/mm2 No shear links required 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-2000a) 3000 mm 3300 mm 2300 mm 1050 Pile size = Pile WL = 2000 mm dia 39250 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 2000 mm 900 mm WL= 13083 kN/m 1050 1) mm Say using pilecap depth = 2000 mm Ultimate Moment, M = 8039 kNm d = 1913 Ultimate shear force, V = 17836 kN Shear stress, v = 4.05 N/mm2 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.02123 1817 mm 10123 mm2 5720 mm2 10123 mm2 provide 15 T 32 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 450 mm from support 2.03 N/mm2 450 0.32 N/mm2 2.71 N/mm2 No shear links required 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-2200) 2400 mm 2700 mm 2500 mm 690 Pile size = Pile WL = 2200 mm dia 47500 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 1800 mm 540 mm WL= 19792 kN/m 690 1) mm Say using pilecap depth = 1800 mm Ultimate Moment, M = 4367 kNm d = 1713 Ultimate shear force, V = 16143 kN Shear stress, v = 3.77 N/mm2 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.01323 1627 mm 6141 mm2 5567 mm2 6141 mm2 provide 17 T 25 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 270 mm from support 1.89 N/mm2 270 0.28 N/mm2 3.55 N/mm2 No shear links required 17/11/2023 Project: Designed By: ME City Subject: WHT Date: Pilecap Design (1BP-2200a) 3000 mm 3300 mm 2500 mm 990 Pile size = Pile WL = 2200 mm dia 47500 kN fcu = fy = 45 N/mm2 460 N/mm2 mm 2000 mm 840 mm WL= 15833 kN/m 990 1) mm Say using pilecap depth = 2000 mm Ultimate Moment, M = 8467 kNm d = 1913 Ultimate shear force, V = 20128 kN Shear stress, v = 4.21 N/mm2 OK 2) Bending Steel : K= z= As = As min. = As req. = 0.02057 1817 mm 10662 mm2 6217 mm2 10662 mm2 provide 17 T 32 @ 150 3) Shear Check : Shear stress @ = av = vc = Enhanced vc = 420 mm from support 2.11 N/mm2 420 0.32 N/mm2 2.87 N/mm2 No shear links required 17/11/2023 Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Continuous Beam: 2BP-1050 Checked by Date WHT 1 17/11/2023 (Code of Practice : BS8110 - 1997) C01 Input Tables fcu (MPa) 45 fy (MPa) 460 fyv (MPa) 460 % Redistribution 0 Downward/Optimized redistr. D Cover to centre top steel(mm) 110 Cover to centre bot.steel(mm) 110 Dead Load Factor 1.4 Live Load Factor 1.5 Density of concrete (kN/m3) 24 % Live load permanent 25 Ø (Creep coefficient) 2 Ecs (Free shrinkage strain) 300E-6 Sec No. Bw (mm) D (mm) 1 1350 2000 Bf-top (mm) Span No Section Length(m) Sec No Left 1 0.675 1 2 4.076 1 3 0.675 1 Sup No. Code C,F 1 C 4 C D(mm) Span Wleft (kN/m) L 1 3660 2 3660 3 3660 M left (kNm) M right (kNm) B(mm) Wright (kN/m) Bf-bot (mm) Hf-bot (mm) Y-offset (mm) Web offset Flange offset Sec No Right Column Below Case D,L Span Hf-top (mm) H(m) a (m) Code F,P b (m) 0.3 0.375 Code F,P Column above D(mm) P (kN) B(mm) a (m) H(m) M (kNm) a (m) Load Description Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Checked by Date WHT 17/11/2023 Deflection, Shear, Moment and Steel diagrams. Spans 1-3 Elastic Deflections (Alternate spans loaded) Def max = .5117mm @ 2.71m 5.40 5.20 5.00 4.80 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 -.200 .200 .400 Long-term Deflections (All spans loaded - using required reinforcement) Def max = 2.082mm @ 2.71m -1.00 5.40 5.20 5.00 4.80 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 -.500 .500 1.00 1.50 2.00 SHEAR: X-X V max = -11374kN @ 4.75m 10E3 5.40 5.20 5.00 4.80 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 5000 -5000 -10E3 5.40 5.20 5.00 4.80 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 M max = 11575kNm @ 2.71m .800 .600 .400 2000 .200 MOMENTS: X-X 4000 6000 8000 10E3 Shear Steel: X-X Asv max = 1.333mm²/mm @ 0.00m 1.20 1.00 .800 .600 4000 6000 8000 10E3 12E3 14E3 5.40 5.20 5.00 4.80 4.60 5.40 5.20 5.00 4.80 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 As max = 14937mm2 @ 2.71m .800 .600 .400 2000 .200 Bending Steel: X-X 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 .400 .200 2 Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Continuous Beam: 2BP-1050a Checked by Date WHT 1 17/11/2023 (Code of Practice : BS8110 - 1997) C01 Input Tables fcu (MPa) 45 fy (MPa) 460 fyv (MPa) 460 % Redistribution 0 Downward/Optimized redistr. D Cover to centre top steel(mm) 110 Cover to centre bot.steel(mm) 110 Dead Load Factor 1.4 Live Load Factor 1.5 Density of concrete (kN/m3) 24 % Live load permanent 25 Ø (Creep coefficient) 2 Ecs (Free shrinkage strain) 300E-6 Sec No. Bw (mm) D (mm) 1 1350 1700 Bf-top (mm) Span No Section Length(m) Sec No Left 1 0.675 1 2 3.325 1 3 0.675 1 Sup No. Code C,F 1 C 4 C D(mm) Span Wleft (kN/m) L 1 4010 2 4010 3 4010 M left (kNm) M right (kNm) B(mm) Wright (kN/m) Bf-bot (mm) Hf-bot (mm) Y-offset (mm) Web offset Flange offset Sec No Right Column Below Case D,L Span Hf-top (mm) H(m) a (m) Code F,P b (m) 0.3 0.375 Code F,P Column above D(mm) P (kN) B(mm) a (m) H(m) M (kNm) a (m) Load Description Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Checked by Date WHT 17/11/2023 Deflection, Shear, Moment and Steel diagrams. Spans 1-3 Elastic Deflections (Alternate spans loaded) Def max = .4025mm @ 2.34m -.200 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 -.100 .100 .200 .300 Long-term Deflections (All spans loaded - using required reinforcement) Def max = 1.593mm @ 2.34m -1.00 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 -.500 .500 1.00 1.50 10E3 SHEAR: X-X V max = -10128kN @ 4.00m 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 5000 -5000 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 M max = 8406 kNm @ 2.34m .600 .400 .200 MOMENTS: X-X 2000 4000 6000 8000 Shear Steel: X-X Asv max = 1.333mm²/mm @ 0.00m 1.20 1.00 .800 .600 4000 6000 8000 10E3 12E3 4.60 4.40 4.20 4.00 4.60 4.40 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 As max = 12920mm2 @ 2.34m .800 .600 .400 2000 .200 Bending Steel: X-X 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 .400 .200 2 Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Continuous Beam: 2BP-1650 Checked by Date WHT 1 17/11/2023 (Code of Practice : BS8110 - 1997) C01 Input Tables fcu (MPa) 45 fy (MPa) 460 fyv (MPa) 460 % Redistribution 0 Downward/Optimized redistr. D Cover to centre top steel(mm) 110 Cover to centre bot.steel(mm) 110 Dead Load Factor 1.4 Live Load Factor 1.5 Density of concrete (kN/m3) 24 % Live load permanent 25 Ø (Creep coefficient) 2 Ecs (Free shrinkage strain) 300E-6 Sec No. Bw (mm) D (mm) 1 2600 3500 Bf-top (mm) Span No Section Length(m) Sec No Left 1 4.275 1 Sup No. Code C,F Hf-top (mm) Bf-bot (mm) Case D,L Span Wleft (kN/m) L 1 15755 Span M left (kNm) M right (kNm) B(mm) Wright (kN/m) Y-offset (mm) Web offset Flange offset Sec No Right Code F,P Column Below D(mm) Hf-bot (mm) H(m) a (m) b (m) 0.638 3 Code F,P Column above D(mm) P (kN) B(mm) a (m) H(m) M (kNm) a (m) Load Description Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Checked by Date WHT 17/11/2023 Deflection, Shear, Moment and Steel diagrams. Span 1 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 Def max = .2311mm @ 2.14m 1.40 1.20 1.00 .800 .600 .400 .200 Elastic Deflections (Alternate spans loaded) .050 .100 .150 .200 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 Def max = 39.14mm @ 2.14m 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 Long-term Deflections (All spans loaded - using entered reinforcement) 10.0 20.0 30.0 SHEAR: X-X V max = -36111kN @ 4.28m 30E3 20E3 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 10E3 -10E3 -20E3 -30E3 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 M max = 49884kNm @ 2.14m .600 .400 10E3 .200 MOMENTS: X-X 20E3 30E3 40E3 50E3 Shear Steel: X-X Asv max = 2.568mm²/mm @ 0.00m 2.50 2.00 1.50 15E3 20E3 25E3 30E3 35E3 4.20 4.00 3.80 3.60 4.20 4.00 3.80 3.60 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 As max = 35356mm2 @ 2.14m .600 .400 5000 10E3 .200 Bending Steel: X-X 3.40 3.20 3.00 2.80 2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 .800 .600 .400 .200 1.00 .500 2 Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Continuous Beam: 5BP-1050 Checked by Date WHT 1 17/11/2023 (Code of Practice : BS8110 - 1997) C01 Input Tables fcu (MPa) 45 fy (MPa) 460 fyv (MPa) 460 % Redistribution 0 Downward/Optimized redistr. D Cover to centre top steel(mm) 110 Cover to centre bot.steel(mm) 110 Dead Load Factor 1.4 Live Load Factor 1.5 Density of concrete (kN/m3) 24 % Live load permanent 25 Ø (Creep coefficient) 2 Ecs (Free shrinkage strain) 300E-6 Sec No. Bw (mm) D (mm) 1 1350 2100 Bf-top (mm) Span No Section Length(m) Sec No Left 1 0.675 1 2 3.15 1 3 3.15 1 4 3.15 1 5 3.15 1 6 0.675 1 Sup No. Code C,F 1 C 7 C D(mm) Span Wleft (kN/m) L 1 3913 2 3913 3 3913 4 3913 5 3913 6 3913 M left (kNm) M right (kNm) B(mm) Wright (kN/m) Bf-bot (mm) Hf-bot (mm) Y-offset (mm) Web offset Flange offset Sec No Right Column Below Case D,L Span Hf-top (mm) H(m) a (m) Code F,P b (m) 0.36 0.315 Code F,P Column above D(mm) P (kN) B(mm) a (m) H(m) M (kNm) a (m) Load Description Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Checked by Date WHT 17/11/2023 Deflection, Shear, Moment and Steel diagrams. Spans 1-6 Elastic Deflections (Alternate spans loaded) Def max = .1248mm @ 2.17m 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -.050 .050 .100 Long-term Deflections (All spans loaded - using required reinforcement) Def max = .3133mm @ 11.9m -.200 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -.100 .100 .200 .300 SHEAR: X-X V max = -11280kN @ 3.83m 10E3 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 5000 -5000 -10E3 MOMENTS: X-X M max = -6252kNm @ 3.83m -6000 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -4000 -2000 2000 4000 Shear Steel: X-X Asv max = 1.333mm²/mm @ 0.00m 1.20 1.00 .800 .600 Bending Steel: X-X 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 .400 .200 As max = -7549mm2 @ 3.83m -6000 2000 4000 6000 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -4000 -2000 2 Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Continuous Beam: 5BP-1200 Checked by Date WHT 1 17/11/2023 (Code of Practice : BS8110 - 1997) C01 Input Tables fcu (MPa) 45 fy (MPa) 460 fyv (MPa) 460 % Redistribution 0 Downward/Optimized redistr. D Cover to centre top steel(mm) 110 Cover to centre bot.steel(mm) 110 Dead Load Factor 1.4 Live Load Factor 1.5 Density of concrete (kN/m3) 24 % Live load permanent 25 Ø (Creep coefficient) 2 Ecs (Free shrinkage strain) 300E-6 Sec No. Bw (mm) D (mm) 1 1650 2100 Bf-top (mm) Span No Section Length(m) Sec No Left 1 0.75 1 2 3.15 1 3 3.15 1 4 3.15 1 5 3.15 1 6 0.75 1 Sup No. Code C,F 1 C 7 C D(mm) Span Wleft (kN/m) L 1 4234 2 4234 3 4234 4 4234 5 4234 6 4234 M left (kNm) M right (kNm) B(mm) Wright (kN/m) Bf-bot (mm) Hf-bot (mm) Y-offset (mm) Web offset Flange offset Sec No Right Column Below Case D,L Span Hf-top (mm) H(m) a (m) Code F,P b (m) 0.435 0.315 Code F,P Column above D(mm) P (kN) B(mm) a (m) H(m) M (kNm) a (m) Load Description Job Number Job Title Software Consultants (Pty) Ltd Internet: http://www.prokon.com E-Mail : mail@prokon.com Client Calcs by Sheet 038_MECITY ME City Kimlun SA Checked by Date WHT 17/11/2023 Deflection, Shear, Moment and Steel diagrams. Spans 1-6 Elastic Deflections (Alternate spans loaded) Def max = .1106mm @ 2.25m 14.0 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -.050 .050 .100 Long-term Deflections (All spans loaded - using required reinforcement) Def max = .2635mm @ 12.0m -.200 14.0 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -.100 .100 .200 SHEAR: X-X V max = -12227kN @ 3.90m 10E3 14.0 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 5000 -5000 -10E3 MOMENTS: X-X M max = -6776kNm @ 10.2m -6000 14.0 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -4000 -2000 2000 4000 6000 Shear Steel: X-X Asv max = 1.630mm²/mm @ 0.00m 1.60 1.40 1.20 1.00 .800 .600 -8000 Bending Steel: X-X 14.0 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 .400 .200 As max = -8182mm2 @ 10.2m -6000 2000 4000 6000 14.0 13.0 12.0 11.0 10.0 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -4000 -2000 2 TAJUK PROJEK : CADANGAN MEMBINA 2 BLOK PANGSAPURI PERKHIDMATAN 37 TINGKAT (1155 UNIT) DI ATAS 11 TINGKAT PODIUM TEMPAT LETAK KERETA YANG TURUT MENGANDUNGI 1 TINGKAT KEMUDAHAN, 2 TINGKAT RUANG PERNIAGAAN DAN 1 TINGKAT BESMEN TEMPAT LETAK KERETA; DI ATAS LOT 72699, OFF JALAN SS 8/6 KELANA JAYA, PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) DENGAN KERJASAMA TETUAN MELATI EHSAN (M) SDN. BHD. DARIPADA KESELURUHAN PEMBANGUNAN PARCEL 1 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 2 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 3 - 2 BLOK PANGSAPURI PERKHIDMATAN 37 TINGKAT (1155 UNIT) DI ATAS 11 TINGKAT PODIUM TEMPAT LETAK KERETA YANG TURUT MENGANDUNGI 1 TINGKAT KEMUDAHAN, 2 TINGKAT RUANG PERNIAGAAN DAN 1 TINGKAT BESMEN TEMPAT LETAK KERETA PARCEL 4 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 5 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 6 - 2 BLOK BANGUNAN ASRAMA PENGINAPAN / PANGSAPURI SERVIS 11 TINGKAT BESERTA 2 ARAS BASEMEN TEMPAT LETAK KERETA DAN KEMUDAHAN REKREASI DI ARAS BUMBUNG (KELULUSAN KEBENARAN MERANCANG DENGAN NO. RUJUKAN (9)dlm.MBPJ/040100/T/P23/SS8/6184/2011 Jld.2 BERTARIKH 7 DISEMBER 2015); DI ATAS LOT 72699, OFF JALAN SS 8/6 KELANA JAYA, PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) DENGAN KERJASAMA TETUAN MELATI EHSAN (M) SDN. BHD. TAJUK LUKISAN : PILECAP LAYOUT PLAN AKUAN : COP : I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take full responsibility for the design and proper performance of the same. ........................................................... TANDATANGAN Skala Tarikh AS SHOWN NOV 2023 Di Lukis Di Reka WHT Di Semak HZM No Lukisan WHT Pindaan T/PL/PC/01 T0 TAJUK PROJEK : CADANGAN MEMBINA 2 BLOK PANGSAPURI PERKHIDMATAN 37 TINGKAT (1155 UNIT) DI ATAS 11 TINGKAT PODIUM TEMPAT LETAK KERETA YANG TURUT MENGANDUNGI 1 TINGKAT KEMUDAHAN, 2 TINGKAT RUANG PERNIAGAAN DAN 1 TINGKAT BESMEN TEMPAT LETAK KERETA; DI ATAS LOT 72699, OFF JALAN SS 8/6 KELANA JAYA, PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) DENGAN KERJASAMA TETUAN MELATI EHSAN (M) SDN. BHD. DARIPADA KESELURUHAN PEMBANGUNAN PARCEL 1 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 2 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 3 - 2 BLOK PANGSAPURI PERKHIDMATAN 37 TINGKAT (1155 UNIT) DI ATAS 11 TINGKAT PODIUM TEMPAT LETAK KERETA YANG TURUT MENGANDUNGI 1 TINGKAT KEMUDAHAN, 2 TINGKAT RUANG PERNIAGAAN DAN 1 TINGKAT BESMEN TEMPAT LETAK KERETA PARCEL 4 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 5 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 6 - 2 BLOK BANGUNAN ASRAMA PENGINAPAN / PANGSAPURI SERVIS 11 TINGKAT BESERTA 2 ARAS BASEMEN TEMPAT LETAK KERETA DAN KEMUDAHAN REKREASI DI ARAS BUMBUNG (KELULUSAN KEBENARAN MERANCANG DENGAN NO. RUJUKAN (9)dlm.MBPJ/040100/T/P23/SS8/6184/2011 Jld.2 BERTARIKH 7 DISEMBER 2015); DI ATAS LOT 72699, OFF JALAN SS 8/6 KELANA JAYA, PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) DENGAN KERJASAMA TETUAN MELATI EHSAN (M) SDN. BHD. TAJUK LUKISAN : PILECAP LAYOUT PLAN AKUAN : COP : I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take full responsibility for the design and proper performance of the same. ........................................................... TANDATANGAN Skala Tarikh AS SHOWN NOV 2023 Di Lukis Di Reka WHT Di Semak HZM No Lukisan WHT Pindaan T/PL/PC/02 T0 TAJUK PROJEK : CADANGAN MEMBINA 2 BLOK PANGSAPURI PERKHIDMATAN 37 TINGKAT (1155 UNIT) DI ATAS 11 TINGKAT PODIUM TEMPAT LETAK KERETA YANG TURUT MENGANDUNGI 1 TINGKAT KEMUDAHAN, 2 TINGKAT RUANG PERNIAGAAN DAN 1 TINGKAT BESMEN TEMPAT LETAK KERETA; DI ATAS LOT 72699, OFF JALAN SS 8/6 KELANA JAYA, PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) DENGAN KERJASAMA TETUAN MELATI EHSAN (M) SDN. BHD. DARIPADA KESELURUHAN PEMBANGUNAN PARCEL 1 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 2 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 3 - 2 BLOK PANGSAPURI PERKHIDMATAN 37 TINGKAT (1155 UNIT) DI ATAS 11 TINGKAT PODIUM TEMPAT LETAK KERETA YANG TURUT MENGANDUNGI 1 TINGKAT KEMUDAHAN, 2 TINGKAT RUANG PERNIAGAAN DAN 1 TINGKAT BESMEN TEMPAT LETAK KERETA PARCEL 4 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 5 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 6 - 2 BLOK BANGUNAN ASRAMA PENGINAPAN / PANGSAPURI SERVIS 11 TINGKAT BESERTA 2 ARAS BASEMEN TEMPAT LETAK KERETA DAN KEMUDAHAN REKREASI DI ARAS BUMBUNG (KELULUSAN KEBENARAN MERANCANG DENGAN NO. RUJUKAN (9)dlm.MBPJ/040100/T/P23/SS8/6184/2011 Jld.2 BERTARIKH 7 DISEMBER 2015); DI ATAS LOT 72699, OFF JALAN SS 8/6 KELANA JAYA, PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) DENGAN KERJASAMA TETUAN MELATI EHSAN (M) SDN. BHD. TAJUK LUKISAN : PILECAP LAYOUT PLAN AKUAN : COP : I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take full responsibility for the design and proper performance of the same. ........................................................... TANDATANGAN Skala Tarikh AS SHOWN NOV 2023 Di Lukis Di Reka WHT Di Semak HZM No Lukisan WHT Pindaan T/PL/PC/03 T0 TAJUK PROJEK : CADANGAN MEMBINA 2 BLOK PANGSAPURI PERKHIDMATAN 37 TINGKAT (1155 UNIT) DI ATAS 11 TINGKAT PODIUM TEMPAT LETAK KERETA YANG TURUT MENGANDUNGI 1 TINGKAT KEMUDAHAN, 2 TINGKAT RUANG PERNIAGAAN DAN 1 TINGKAT BESMEN TEMPAT LETAK KERETA; DI ATAS LOT 72699, OFF JALAN SS 8/6 KELANA JAYA, PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) DENGAN KERJASAMA TETUAN MELATI EHSAN (M) SDN. BHD. DARIPADA KESELURUHAN PEMBANGUNAN PARCEL 1 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 2 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 3 - 2 BLOK PANGSAPURI PERKHIDMATAN 37 TINGKAT (1155 UNIT) DI ATAS 11 TINGKAT PODIUM TEMPAT LETAK KERETA YANG TURUT MENGANDUNGI 1 TINGKAT KEMUDAHAN, 2 TINGKAT RUANG PERNIAGAAN DAN 1 TINGKAT BESMEN TEMPAT LETAK KERETA PARCEL 4 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 5 - PERNIAGAAN (PEMBANGUNAN AKAN DATANG) PARCEL 6 - 2 BLOK BANGUNAN ASRAMA PENGINAPAN / PANGSAPURI SERVIS 11 TINGKAT BESERTA 2 ARAS BASEMEN TEMPAT LETAK KERETA DAN KEMUDAHAN REKREASI DI ARAS BUMBUNG (KELULUSAN KEBENARAN MERANCANG DENGAN NO. RUJUKAN (9)dlm.MBPJ/040100/T/P23/SS8/6184/2011 Jld.2 BERTARIKH 7 DISEMBER 2015); DI ATAS LOT 72699, OFF JALAN SS 8/6 KELANA JAYA, PETALING JAYA, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN PERBADANAN KEMAJUAN NEGERI SELANGOR (PKNS) DENGAN KERJASAMA TETUAN MELATI EHSAN (M) SDN. BHD. TAJUK LUKISAN : PILECAP LAYOUT PLAN AKUAN : COP : I hereby certify that these works have been designed by me in accordance with sound engineering practice and that I take full responsibility for the design and proper performance of the same. ........................................................... TANDATANGAN Skala Tarikh AS SHOWN NOV 2023 Di Lukis Di Reka WHT Di Semak HZM No Lukisan WHT Pindaan T/PL/PC/04 T0