Title: Method Statement - CC of Various Coolers/Heat Exchangers (Cooling Water Side) Revision: 00 Doc number: KSI-FCC-2334-PRO-001-00 Date: 22.06.23 7.7 ACCEPTANCE CERTIFICATE Chemical Cleaning Completion Certificate Project Project System Rauan Nalco LLP Job/Project # Sup-Co-2023-0116 Date 29.06.2023 Scope Karabatan, Polypropylene, Kazakhstan Petrochemical Industries Client Chemical Cleaning has been completed as per approved method statement. System Data Location Chemical Cleaning Services 2-CWR-1250-21001-H1A-N Description 2-CWR-1250-21001-H1A-N Document # KSI-FCC-2334-PRO-001-00 Acceptance Criteria Control Parameters Sn # Final Observed Stage Chemical Used Comments Time Task end 14:20 27.06.2023 Initial Water Flushing and Rinsing N/A 2 Acid Cleaning Stage Citric acid Sodium Bisulfite Urotropine Hydrochloric acid 14:30 27.06.2023 04:00 28.06.2023 3 Neutralization/Flushing & Rinsing with Sodium Carbonate Sodium Carbonate 05:30 28.06.2023 10:30 28.06.2023 4 Passivation CaCl2 Rauan-1080 11:10 28.06.2023 02:50 29.06.2023 1 Required Specification (if any): Achieved Specification: This Certificate has been signed by both CONTRACTOR (KSI PetroGasServices) and COMPANY (Rauan Nalco LLP), and certifies that the services/ Method Statement performed by CONTRACTOR (KSI PetroGasServices) have been flushed and validated as per the recorded parameters/results achieved by application of the specific Method Statement documented above. This signed acceptance by the COMPANY (Rauan Nalco LLP) also constitutes confirmation that the system has been handed over to the COMPANY (Rauan Nalco LLP), who is satisfied with CONTRACTOR’s (KSI PetroGasServices) performance, in that at the time of flushing the system, it was found to comply with the COMPANY’s (Rauan Nalco LLP) specifications. This Certificate does not represent any form of warranty or guarantee for the component or system flushed and CONTRACTOR (KSI PetroGasServices) shall have no further responsibility for the system from the date/time of handover. Company Approval Time Task start 13:30 27.06.2023 Name Sign Date CONTRACTOR Representative COMPANY Representative Date: 22.06.23 | Rev: 00 Page 20 of 39 Method Statement – CC of CC of various Coolers/Heat Exchangers (Shell Side). ©2023 KSI PetroGasServices LLP All Rights Reserved – Confidential Information