Project Review Meeting IDPL Sec-01 01.04.2024

advertisement
PROJECT REVIEW
MEETING PRESENTATION
LAYING OF PIPELINE AND HDD WORKS FOR
IRUGUR - DEVENGONTHI PIPELINE (IDPL)
PROJECT OF M/s BHARAT PETROLEUM
CORPORATION LIMITED
Schedule-01
Presentation by:
NRP Projects Pvt.Ltd.
Date: 30.03.2024
WELCOME NOTE

NRP Project Pvt.Ltd. Welcomes all the respected and
esteemed officials of M/s BPCL and Worley for the Job to this
Project Review Meeting of LAYING 16”OD, 148.375 KM
(APPROX.) CROSS COUNTRY PIPELINE FROM IRUGUR DEVENGONTHI PIPELINE

Schedule-01: Irugur to IPS-Sankari
Content

PROJECT INTRODUCTION

PROJECT HIGHLIGHTS

PROJECT SCOPE OF WORK

LIST OF CROSSING’S

Main Line Works

HEALTH, SAFETY & ENVIRONMENT (HSE) PLAN

HSE OBJECTIVES

MANPOWER DEPLOYMENT AT PRESENT

EQUIPMENT DEPLOYMENT AT PRESENT

PROJECT PROGRESS PLAN Vs ACTUAL

CONTRACTOR SUPPLIED MATERIALS STATUS

HIGHLIGHTS

STATUTORY DOCUMENT STATUS

PROJECT ACTIVITY PHOTO
PROJECT Introduction

BPCL, Pipelines Division desires to lay 16”OD, 148.375 KM
(APPROX.) CROSS COUNTRY PIPELINE FROM IRUGUR TO
IPS-Sankari including associated Sectionalizing valve & pigging
Works.

Apart from mainline laying & associated combined HDD works viz.
civil, mechanical, telecommunication and instrumentation shall be
carried out at Intermediate Pigging and Sectionalizing Valve etc.

NRP has been awarded the Group 01 i.e. : IRUGUR TO IPSSankari as per below scope:
PROJECT HIGHLIGHTS
Owner
Bharat Petroleum Corporation Limited.
Consultant
Worley Services India Pvt. Ltd.
Contractor
NRP Projects Pvt.Ltd.
LOI Date
09.12.2023
Date of Specific Notice
09.12.2023
Project Value
120.06 Cr. Inc GST
Mainline Pipe Material
API 5L X-65 PSL-2
Pipe Size and Wall Thickness
16"OD x 7,8,11.7mmWT
Length
148.375 Km (Approx.)
Site Location
Schedule-01 Irugur to IPS-Sankari.
Completion Period
18 Months from date of Specific Notice
Defect Liability Period
12 months from the date of successful commissioning
and handing over of the entire system
PROJECT SCOPE OF WORK
Mobilization &
Planning
Material
Management
Project Closer
Project
Construction
Management
Final
documentation
Precommissioning
Sr.No
Description
1
HDD Crossing
(41 No's)
2
Open Cut
UOM
Meter
Meter
Quantity
(Approx)
Remark
11187
As per Tender
Document
2711
As per Tender
Document
Main Line Works

Laying of pipeline as per PDI class location.

Laying mainline by open cut crossing method across roads, minor
drains, minor canals, watercourses, ponds, doabs, low lying areas
etc., using normal/ heavy wall line pipe which shall be classified as
normal Mainline work.

Installation of pipeline in Marshy area using concrete coated pipes.

Crossings, which have been envisaged as cased crossings in the
tender viz., cased crossings of highways/ Railways/ canal etc. may
alternately be executed by HDD technique with equivalent straight
length as indicated in the tender.

Installation of pipeline by Cased Crossing with horizontal auger
boring/ Shallow HDD/ Horizontal directional drilling (HDD) technique
(through all kinds of soils including rock) across Railways, specified
Highways, other metaled roads, Canals etc. using pre-tested pipes
including supplying & providing two coats of bit mastic paint over a
coat of suitable primer to external surface of casing pipe.

Installation of all other types of crossings such as open cut heavy
wall pipe road crossings, minor watercourse crossings, ponds, low
lying areas, marshy area etc. in all kinds of soil.
HEALTH, SAFETY & ENVIRONMENT (HSE) PLAN

NRP firmly believes that its employees are its greatest assets.

The NRP gives equal importance to Health, Safety and Environment
Policy like any other business policy of the company and shall not
sacrifice safety for the sake of ostensible high production.

The NRP shall pursue Health, Safety and Environment Policy in line
with the client’s HSE Policy, local laws and international standards.

The NRP shall provide safe and healthy working conditions including
all necessary safety and personal protective equipment while
maintaining efficient production without detriment to the environment.

The NRP shall provide safe working system coupled with adequate
safety training to create safety awareness so as to inculcate safety
consciousness amongst employees to ensure prevention of accidents.

The improvement in safety in a project site is a continuous process
with a direct thrust on employees to make conscious effort to do so.
SAFETY POLICY

Our Policy is to implement projects within the stipulated scheduled time frame adhering to
the highest safety standards with the objective of achieving a zero accident performance
SAFETY DURING WORK

Safety Technical Competence (STC) training

Barricading

Insulated Crowbar

Cable Location

Proper Personnel Protection Equipment

Proper Electrical Connection

Caution & Information boards

Tool box briefing

Adequate Lighting arrangement for night work

Radiography in Night Time

First aid box

Fire extinguisher

Shielding arrangement during Welding, Grinding and Sand Blasting

Lifting Equipment tested for required Capacity & Operator Qualification
HSE OBJECTIVES

Adopt & implement of WISPL HSE guideline at site.

Conduction of regular Tool Box Talk Meetings, Induction Programs
for newly appointed staff.

Comply with all legal requirements.

Energy conservation at construction sites & offices.

Providing al necessary safety gears, PPE’s etc.
PROJECT COORDINATION MECHANISM
Head Office
❖
❖
❖
❖
❖
❖
Procurement of material and services
Overall Monitoring of Project
Follow up for Billing and subsequent payments
Meetings / Co-ordination with client in HO
Statutory fulfillment - Insurance, Labor, Taxation, Logistics and others.
Follow up for approval of drawings/ documents from client
Site office
❖
❖
❖
❖
❖
❖
❖
Co-ordination with Client and vendor for the scope of supply
Project Execution and Control
Fulfillment of site requirements to meet contractual milestones
Realize new requirements if any and deployment of extra resources
Progress Reporting and EPMC clearances
Invoice records and submission
Liasoning with locals
MANPOWER DEPLOYMENT AT PRESENT
Direct Manpower details
Indirect Manpower details
Sl.n
o.
Designation
Qty Remarks
Sl.n
o.
Designation
Qty Remarks
1 Welder
16
2 Grinder
13
3 Fitter
4
2
Resident Construction
Manager
QC Manager
3
Planning & Billing Engineer
1
4
Planning Engineer
1
4
5
Civil & Structural
1
6
NDT Manager
1
5 Rigger
30
7
Site Engineers
2
6 Blaster
2
7 Electrician
2
8
Safety Lead
1
8 Insulator
4
9
Safety Officers
3
9 Mechanic
1
10 Surveyor ( Mainline and HDD)
Accountant and
11
Administration
12 CP Engineer
2
10 Helper
22
3
11 Driver
14
1
12 Operator
10
13 P & M Officer
1
13 Foreman
4
14 Store in charge
1
15 Store keeper
1
14 Foreman ( Maintenance)
2
1
Total
1
1
21
Fitter ( for marker
installation )
Total
1
89
EQUIPMENT DEPLOYMENT AT PRESENT
Sl.no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Description
Excavator 220
Side Boom
Hydra/Farana
Trailer - Flat bed
Dozer
Tractor Dozer
Backhoe Loader
Car
Survey Equipment
Diesel Generator
Rectifier
Pay Welder
Compressor
Hopper
Tractor Trolley
Bus
Truck
Rock Hammer
Pipe Bending Machine
Internal Clamp
External Clamp
Holiday detector
Pipe Locator
Total Equipment
Available equipment at site
3
2
5
3
1
1
2
10
6
8
41
4
2
2
7
2
2
3
2
6
4
5
2
122
Project Progress PLAN VS ACTUAL AS ON DATE
Project Work Progress
S.No.
Activity
1 Route Survey
2 ROW Opning
4 Grading
6 Stringing
8 Mainline & FT Welding
10 Tie-in Welding
12 Welding Length
14 Radiography
16 Jt. Coating
18 Pipe Bending
20 Trenching
22 Lowering
24 HDPE Duct Laying
26 Backfilling
28 Restoration
31 16" ,X-65, PSL2 X 7 mm
32 16" ,X-65, PSL2 X 8 mm
33 16" ,X-65, PSL2 X 11.7 mm
34 Line Pipe Received
Unit
KM
KM
KM
KM
Nos
Nos
KM
No.
No.
Nos
KM
KM
KM
KM
KM
Mtr
Mtr
Mtr
Mtr
Plan
135.000
45.000
45.000
38.000
3165
1749
35.000
3165
3165
10
35.000
35.000
35.000
35.000
21.000
Actual
39.755
7.000
21800.32
18232.38
940
0
16455.96
649
270
1
945
289
96
32
0
169.630
19197.320
12.000
19586.322
Remarks
PROJECT PROGRESS AS ON DATE
SL.NO
WORK ACTIVITY
UOM
PROGRESS
1
3
4
5
7
8
6
9
10
11
12
13
14
15
16
17
18
19
ROUTE SURVEY
CLEARING AND GRADING
TOPOGRAPHY SURVEY WITH DGPS
PIPE STRINGING
WELDING(Main line WPS -01) Nos of joints
WELDING(FT/T WPS -02) Nos of joints
WELDING Length.
RT Taken
RT Reviewed
RT Fresh Accepted
RT Repair
RT/RS/CS/CHS/DRS/GRS. Other Joints.
RT Repair Accepted
RT/RS/CS/CHS/DRS/GRS. Other Accepted.
Total Accepted (Rep+Other)
Field Joint Coating
Trenching
Lowering (Including HDD Length)
M
M
M
M
NOS
NOS
M
NOS
NOS
NOS
NOS
NOS
NOS
NOS
NOS
NOS
M
M
39,755.32
21,800.32
68,207.00
18,232.38
52.00
888.00
16,456.96
649.00
645.00
568.00
26.00
46.00
16.00
51.00
635.00
270.00
945.00
289.00
20
HDPE Duct Laying
M
96.90
21
24
42
43
44
46
47
Backfilling
Cold field bend Febrication
API 5L GR.X-65, PSL-2, 3LPP/16" X 7mm
API 5L Gr X65, PSL2, 3LPE/16" X 8mm
API 5L Gr X65, PSL2, 3LPE/16" X 11.7mm
API 5L Gr X65, PSL2, Bare Pipe/16" X 11.7mm
Total Receipt of Pipes
M
NOS
M
M
M
M
M
32.00
1.00
169.63
19,197.32
12.22
207.15
19586.322
REMARKS
LAYING 2 NOS OF HDPE
PIPE
CONTRACTOR SUPPLIED MATERIAL STATUS
Sl.No
Package / Item description
UOM
Vendor Name
EVEREST ENGINEERING
ENTERPRISES
Material Qty.
Receipt at site.
Remarks / Status / Concern
1
WELDING ELECTODE E6010
KG
2
3
WELDING ELECTODE E8010
WARNING MAT
KG
KM
4
COATING SLEEVE ,HTLP-80
QTY
7008
5
6
7
8
9
10
11
12
EPOXY PART-A
EPOXY PART-B
REPAIR PATCH
PERP MELT STICK
DIRECT SLEEVE
PERP60E REPAIR PATCH
S1182 MASTIC FILLER
FILLER MATERIAL (C6)
NOS
NOS
NOS
NOS
NOS
NOS
NOS
NOS
10
4
5
50
1
3
30
13
HDPE-40MM END SEAL
NOS
14
15
16
17
HDPE-40MM END PLUG
HDPE-40MM COUPLER
HDPE-40MM DUCT
COPPERSLAG
NOS
NOS
KM
MT
18
ROCK SHEILD
SQM
PARRY ENTERPRISES INIDA
PVTLTD
21712.5
19
20
24FIBRE,6CORE-OFC CABLE
80NB MS PIPE
Carbon Steel Nonolithic Isolation Joimt 16" X
600# ASTM A694 Gr F65 (double sealed)
KM
MTS
BIRLA CABLE LIMTED
SRIVARDHAMAN TUBE
3503.64
NOS
VEE KEY VIKRAM & CO LLP
Order placed
21
SINGHAL INDUSTRIES PVT.LTD
SEAL FOR LIFE INDIA PVT LTD
PARIXIT IRRIGATION LIMITED
JVP TRADERS
991.8
7008
5
-
Order placed
50
18
33
Order placed
2ND LOT Received (Qty-10687.5 Sqm)
Date - 26.03.2024
Order placed
22
Carbon Steel Nonolithic Isolation Joimt 4" X
600# ASTM A694 Gr F65 (double sealed)
NOS
VEE KEY VIKRAM & CO LLP
Order placed
23
Carbon Steel Nonolithic Isolation Joimt 2" X
150# A105N Gr F65 (double sealed)
NOS
VEE KEY VIKRAM & CO LLP
Order placed
24
Flow Tees 16"X16" X 600# ,ASTM A860 Gr.
WPHY65
NOS
VEE KEY VIKRAM & CO LLP
Order placed
NOS
VEE KEY VIKRAM & CO LLP
Order placed
MTS
Surya Roshni limited
Order placed
25
26
Flow Tees 16"X8" X 600# ,ASTM A860 Gr.
WPHY65
6" Conduit pipe
HIGHLIGTHS

PAUT Procedure Submitted to Client for Approval

Geo-tech Survey completed as on Handover ROU along the road
from CH-83 to 95,Inside BPCL Terminal, Common ROW-under
process.

HDD of Kaveri river will Include Canal, Nala, Railway crossing,
SH-84,-Topo Survey completed-ROU Not Handover.

CH-1.1 to CH-75 Route Survey& Mainline Activity Under progress22.03.2024

TCP-Material data sheet ,QAP, Installation Drawings after
approval of these Design will ready.

Trenching & Lowering activities at CH-83 & 85 along the road.
PROJECT: LAYING OF PIPELINE AND HDD WORKS FOR IRUGUR - DEVENGONTHI PIPELINE (IDPL)- SCHEDULE-1
CLIENT - M/s.Bharat Petroleum Corporation Limited
PMC: Worley
CONTRACTOR - M/s.NRP Proejcts Private Limited
Project Monitoring Schedule S-Curve
Document no: NRP/BPCL/S-Curve-R00
Last Updated Date:06-02-2024
Activity Name
S.No
Start Date
Planned
Completion
Date
Engineering
1
Receipt of AFC Drawings
Weightage in %
Activity
Engineering
3
Submission and approval of
Crossing drawings and Design
Design Approval of TCP and PCP
Jan-24
Feb-24
Mar-24
Apr-24
May-24
Plan
Plan
Plan
Plan
Plan
Plan
Quantity
Percentage
Quantity
Percentage
Quantity
Percentage
Quantity
Percentage
Quantity
Percentage
Quantity
Percentage
05-01-24
20-01-24
0.02%
Plan
-
0.00%
1.0
0.02%
-
0.00%
-
-
-
-
-
-
1
20-01-24
01-03-24
0.11%
Plan
04-02-24
20-03-24
0.05%
0.00%
-
-
0.00%
-
-
-
33
Actual
Plan
-
-
-
-
0.00%
14
Submission and approval of
Procedures and QAP
22-12-23
05-03-24
0.05%
Plan
Receipt of Free issue Valves
-
-
-
-
0.00%
19
0.06%
-
0.00%
-
0.00%
0.11%
1
0.05%
0.05%
0.00%
0.00%
5
0.0026%
20
0.01%
20
0.01%
0.0032%
0.03%
5
0.00%
15
0.01%
19
0.01%
-
6
0.00%
0.02%
3,000
0.02%
12,000
0.08%
20,000
0.14%
2,000
0.01%
8,401
0.06%
2,000
0.01%
4.2859%
09-01-24
16-04-24
1.04%
Plan
148375
Actual
4
-
51
05-04-24
09-06-24
0.01%
Plan
20,000
8
18
07-04-24
10-04-24
0.01%
Plan
0.14%
0.01%
0.00%
2
2
0.01%
Actual
5
Receipt of Instruments
15-06-24
19-06-24
0.01%
Plan
Procurement and FIM
6
supply of MIJ
04-02-24
07-06-24
0.17%
Supply of Flow tee
30-01-24
05-07-24
0.49%
Supply of Special Tools
10-02-24
17-07-24
0.29%
7
3D Modeling
15-03-24
17-07-24
0.10%
24-01-24
11-07-24
1.87%
Plan
8
Station supply
15-02-24
25-04-24
0.29%
Actual
0.00%
0.01%
0.17%
0.00%
0.49%
13
0.00%
0.29%
1
0.00%
0.10%
1
0.00%
319,340.00
Actual
Plan
0.01%
0.00%
14
Actual
Supply of OFC Cables
0.01%
0.00%
Actual
Plan
0.09%
0.01%
Actual
Plan
1.04%
0.00%
2
Actual
Plan
8
0.17%
0.00%
Actual
Plan
25,000
0.00%
Actual
Receipt of Equipments
0.02%
0.00%
1
Actual
Supply and Free Issue
Receipt of Free issue Pipes
0.03%
-
2
Actual
4
Total %
0.2097%
Actual
2
Dec-23
Qty (M)
71,934
0.42%
75,000
0.00%
1
1
0.44%
1.87%
0.00%
0.00%
0.29%
0.29%
0.00%
0.00%
Remarks
Pipeline Construction
9
GPS Survey
57.72%
08-01-24
26-02-24
0.06%
Plan
135027
35,027
Actual
ROW Handover
10
Opening of ROW & Liasoning
Clearing & Grading
11
Transportation & Stringing
25-01-24
25-01-24
26-01-24
29-01-24
07-06-24
07-06-24
19-06-24
02-07-24
0.14%
0.86%
1.35%
4.54%
Plan
31-01-24
15-07-24
23.40%
Pipeline Construction
13
NDT-Digital Radiography
Joint Coating
Trenching
Lowering
03-02-24
07-02-24
07-02-24
07-02-24
19-07-24
22-07-24
21-07-24
21-07-24
2.25%
4.05%
2.70%
6.75%
0.04%
102,899
0.04%
32,128
0.01%
10,000
0.00%
Duct Laying
07-02-24
21-07-24
0.90%
15,000
0.02%
25,000
0.03%
0.01%
15,000
0.02%
25,000
0.03%
Plan
5,000
0.03%
15,000
0.10%
25,000
0.16%
Actual
5,000
0.03%
15,000
0.10%
25,000
0.16%
Plan
5,000
0.05%
15,000
0.15%
25,000
0.25%
Actual
4,000
0.04%
7,113
0.07%
10,887
0.11%
Plan
3,000
0.10%
12,000
0.40%
23,000
0.77%
3,000
0.10%
6,253
0.21%
10,000
0.34%
20
0.00%
12,000
2.08%
23,000
3.99%
20
0.00%
635
0.11%
16,500
2.86%
12,000
0.20%
23,000
0.38%
23,000
0.38%
Actual
6,310
0.11%
1,000
0.02%
585
0.01%
Plan
12,000
0.36%
23,000
0.69%
23,000
0.69%
Actual
1,305
0.04%
2,500
0.07%
Plan
12,000
0.24%
23,000
0.46%
Actual
15
0.00%
950
0.02%
Plan
12,000
0.60%
23,000
1.15%
0.00%
700
0.03%
0.08%
23,000
0.15%
0.00%
750
0.00%
0.20%
23,000
0.38%
0.00%
32
0.00%
0.31%
15,000
0.76%
0.00%
10,000
0.51%
0.04%
15,000
0.09%
135027
135027
135027
Plan
135027
Plan
135027
135027
135027
135027
Plan
135027
12,000
07-02-24
21-07-24
2.25%
Plan
135027
12,000
Actual
15
Tie-in
09-03-24
05-10-24
7.56%
Plan
148375
6,000
Actual
Restoration
07-02-24
05-10-24
0.90%
Plan
148375
6,000
Actual
Crossings
Open Cut Crossing
0.00%
Concrete Coating
Crossings
18
05-03-24
11-06-24
2.45%
Plan
400
2711
25,000
0.16%
33,000
0.00%
25,000
0.25%
33,000
0.00%
23,000
0.77%
30,000
0.00%
23,000
3.99%
30,000
0.00%
30,000
30,000
0.00%
23,000
0.46%
30,000
0.00%
23,000
1.15%
30,000
0.00%
23,000
0.15%
30,000
0.00%
23,000
0.38%
30,000
0.00%
15,000
0.76%
20,000
0.00%
15,000
0.09%
20,000
0.00%
01-03-24
28-04-24
0.43%
Plan
07-02-24
11-09-24
18.90%
Plan
21-02-24
26-05-24
0.14%
Plan
0.36%
700
100
283
0.15%
183
0.00%
10787
-
500
0.88%
0.04%
0.14%
0.00%
0.05%
0.21%
0.86%
0.00%
0.29%
0.33%
1.35%
0.00%
0.22%
1.01%
4.54%
0.00%
0.65%
5.20%
23.40%
0.00%
2.97%
0.50%
2.25%
0.00%
0.13%
0.90%
4.05%
0.00%
0.11%
0.60%
2.70%
0.00%
0.02%
1.50%
6.75%
0.00%
0.03%
0.20%
0.90%
0.00%
0.00%
0.50%
2.25%
0.00%
0.00%
1.02%
7.56%
0.00%
0.51%
0.12%
0.82%
0.00%
0.00%
21-02-24
26-05-24
0.11%
Plan
Actual
750
0.68%
2.45%
0.00%
0.00%
0.28%
0.43%
0.00%
1,500
0.00%
400
0.63%
0.00%
2.63%
0.00%
2,000
0.00%
200
Actual
O/C Cased Crossing
33,000
0.00%
0.00%
Actual
Cased Crossings
0.03%
22.03%
Actual
HDD
25,000
0.00%
Actual
17
0.14%
0.02%
0.01%
Actual
Backfilling
0.04%
5,000
Actual
14
92,900
5,000
135027
Actual
12
100,000
0.00%
Actual
Actual
Welding
0.01%
0.07%
200
0.00%
200
200
0.11%
0.00%
200
3.50%
18.90%
0.00%
0.00%
0.07%
0.14%
0.00%
0.00%
0.11%
0.22%
0.00%
0.00%
TCP
TCP
Temporary Cathodic Protection
1.3500%
28-02-24
15-10-24
Plan
6,000
148375
Actual
Markers
Markers
1.35%
Markers fabrication
15,000
0.00%
30-01-24
23-05-24
25-02-24
10-08-24
Station Works
Piping Works
15,000
0.00%
1.08%
Plan
100
1713
1.08%
Plan
0.06%
300
0.00%
100
1713
0.19%
500
20,000
0.32%
500
0.00%
0.06%
300
0.00%
0.19%
350
0.00%
1.35%
0.00%
0.00%
0.32%
1.08%
0.00%
0.00%
0.22%
1.08%
0.00%
0.00%
31-03-24
25-08-24
0.38%
Plan
1
6
31-03-24
20-07-24
0.05%
Plan
0.06%
1
0.00%
0.06%
0.38%
0.00%
0.00%
0.05%
2
Actual
Staion Civil Works
10-03-24
20-06-24
1.62%
Plan
0.00%
1
6
Actual
Testing and Commissioning
Pigging and Gauging
0.27%
1
0.00%
0.27%
2
0.00%
Hydrotesting
10-05-24
25-09-24
1.94%
Plan
25,000
148375
15-05-24
02-10-24
3.11%
Plan
25,000
148375
Actual
Magnetic and EGP
0.54%
1.62%
0.00%
0.00%
0.33%
1.94%
0.00%
0.00%
0.52%
3.11%
0.00%
0.00%
6.09%
Actual
Testing & Commissioning
0.18%
2.05%
Actual
Installation of Equipments
0.14%
0.00%
0.00%
Actual
Piping Works
0.14%
2.1600%
Actual
Markers Installation
0.05%
10-10-24
10-11-24
0.35%
Plan
0.35%
148375
Actual
Pre-Comissioning
10-10-24
10-11-24
0.35%
Plan
0.00%
0.35%
148375
Actual
Idle Time Preservation
11-11-24
10-12-24
0.35%
Plan
0.00%
0.35%
148375
Actual
OFC
OFC Blowing
OFC Blowing
0.00%
0.86%
21-03-24
07-10-24
0.86%
Plan
24,000
319340
Actual
Cathodic Protection
Permenant Cathodic Protection
0.06%
40,000
0.00%
0.11%
0.86%
0.00%
0.00%
3.0780%
05-10-24
15-03-25
1.35%
Plan
1.35%
148375
CP
Actual
AC Interference Survey
05-02-25
05-05-25
0.86%
Plan
0.00%
0.86%
148375
Actual
AC Mitigation
05-02-25
05-05-25
0.86%
Plan
0.00%
0.86%
148375
Actual
Final Doc
Final Documentaion
Submission of Test Reports
0.00%
0.161997%
10-12-24
10-05-25
0.08%
Plan
0.08%
1
Actual
Submission of all Field Reports
10-12-24
10-05-25
0.08%
Plan
0.00%
0.08%
1
Actual
0.00%
Total Plan %
5
Cumulative
Plan
0.00%
5
0.00%
56068
56,073
0.26%
271134
5.07%
500260
12.05%
519496
14.96%
518011
18.95%
0.26%
327,207
5.33%
827,467
17.37%
1,346,963
32.33%
1,864,974
51.28%
Total Actual
%
5
0.00%
19035
0.20%
92181.71
0.73%
115319
4.17%
585
0.01%
0
0.00%
Cumulative
Actual
5
0.00%
19040
0.21%
111221.71
0.94%
226540.71
5.11%
227125.71
5.12%
227125.71
5.12%
STATUTORY DOCUMENT STATUS
SI.No
Statutory
Status
1
Submission of CPBG
We are following As per cl. 20.2
2
Contract Agreement Signing
After cpbg submission
3
Receipt of Work Order
After cpbg submission
4
Submission of Labour license
We are received Recived on dt.
19.03.2024
5
Submission of Contract Insurances
Submitted
6
Submission of Indemnity bond
Submitted
7
Submission of GST and PAN
Submitted
8
Submission of Power of Attorney
Submitted
9
Submission of Authorization letter
Submitted
PROJECT CAMP ADDRESS
OFFIC & CAMP ADDRESS:
NRP Projects Private Limited.
SF No. 509/3, Veeranampalayam,
Tiruppur Road, Kangayam – Taluk,
Tiruppur – District, Tamil Nadu
Pin Code – 638701
CONSTRAINTS

Availability of ROU.

Obtaining Permission from respective authorities and statutory
approval for Laying of Pipeline & Crossing works, partially
received.

Handing over of land/ Plot

Availability of 24” Conc. Water line along the road CH from 83
to 95 (SH-89)

Availability of 16” Conc Pipe line&27” Di pipeline along the road
from Ch-118 to 125.
WIHILE PAUT PROCEDURE PHOTOGRIPHY
STRINGING IN ROW KM-01
WELDING IN PROGRESS
TRENCHING ALONGTH WITH ROAD
TRENCHING KM-85
TRENCHING KM-103
DEWATRING KM-83
LOWERING AT CH00 INSIDE BPCL PLANT
THANKS FOR YOUR
ATTENTION
LET US ALL PARTNER TOWARDS
AN INJURY-FREE WORKPLACE