Date: 26/03/2024 Assessment of the Drawings from ARISE GROUP, BENIN Sl. No. 1) 2) 3) 4) 5) 6) 7) 8) 9) Subject / Mechanical Comments Reference Drawings UNIT-I - SPINNING PLANT ABGN-U-I-SBuilding FFL (Finished Floor Level) is not mentioned. 229-R0-Typ. Plinth Protection Details ABGN-U-I-UIt is advisable to consider Sauser drain along the Kerb 511-R0-Typical towards Road side, this is to avoid settling of rain water Section for along with Kerb. Utility Services & Pipe Road Crossing ABGN-U-I-UAdministration building, Creche / Medical room, Cotton 503-R2-Road & go-down’s storm water down spouts to roadside main Storm Water storm water gutter connections are not shown , which will Drain Layout allow to know the UG storm water connections. Storm water line from HSD yard , Gas Yard and HT “do” Panel area to roadside main storm water gutter connections are not shown “do” Worker changing block : there is only S-E side storm water gutter is shown , need to show opposite-side storm water gutter for connections from building. “do” Cotton go-down N-E side roadside main storm water gutter connections are not shown ABGN-U-I-U505-R2Sewerage Layout plan ABGN-U-I-U510-R0-Effluent Drain Layout Plan No comments No comments Response by Sijcon/ATMS