Date: 26/03/2024
Assessment of the Drawings from ARISE GROUP, BENIN
Sl.
No.
1)
2)
3)
4)
5)
6)
7)
8)
9)
Subject /
Mechanical Comments
Reference
Drawings
UNIT-I - SPINNING PLANT
ABGN-U-I-SBuilding FFL (Finished Floor Level) is not mentioned.
229-R0-Typ.
Plinth Protection
Details
ABGN-U-I-UIt is advisable to consider Sauser drain along the Kerb
511-R0-Typical towards Road side, this is to avoid settling of rain water
Section for
along with Kerb.
Utility Services
& Pipe Road
Crossing
ABGN-U-I-UAdministration building, Creche / Medical room, Cotton
503-R2-Road & go-down’s storm water down spouts to roadside main
Storm Water
storm water gutter connections are not shown , which will
Drain Layout
allow to know the UG storm water connections.
Storm water line from HSD yard , Gas Yard and HT
“do”
Panel area to roadside main storm water gutter
connections are not shown
“do”
Worker changing block : there is only S-E side storm
water gutter is shown , need to show opposite-side storm
water gutter for connections from building.
“do”
Cotton go-down N-E side roadside main storm water
gutter connections are not shown
ABGN-U-I-U505-R2Sewerage
Layout plan
ABGN-U-I-U510-R0-Effluent
Drain Layout
Plan
No comments
No comments
Response by
Sijcon/ATMS