MONITORING CHECKLIST FOR BOILER MONTH: DAILY ACTIVITY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 GUAGES, MONITOR AND INDICATORS VISUAL INSPECTION INSTRUMENT AND EQUIPMENT SETTINGS CHECKING WEEKLY ACTIVITY WEEK 1 WEEK 2 Firing Rate Control Settings Visual Inspection of Igniter Pilot and Main Fuel Valves Flame Failure Control Flame Signal Strength Controls Linkages MONTHLY ACTIVITY RESULT Low Fan Pressure Interlock High and Low Gas Pressure Interlocks Scanner and Diffuser Pilot Assembly Note: If any abnormality occurs, immediately inform Supervisor, Maintenance personel and Production Head. LEGENDS: NP - NO PRODUCTION UM - UNDER MAINTENANCE WEEK 3 WEEK 4 WEEK 5 29 30 31 PREVENTIVE MAINTENANCE CHECKLIST FOR BOILER YEAR: ACTIVITY FREQUENCY CHECKING OF BLOWER FAN & MOTOR, OIL PREHEATER, OIL PUMP, CONTROL PANEL QUARTERLY WATER SIDE DESCALING AND DESCALING/CLEANING OF FLUE TUB (DESOOTHING) SEMI ANNUALLY REPLACE OR CLEAN THE OIL STRAINER ELEMENT. ANNUALLY INSPECT AND CLEAN THE COMBUSTION IMPELLER ANNUALLY DATE STATUS REMARKS