QUALITY CONTROL & QUALITY ASSURANCE PLAN SCOPE: Scope of this document t is to specify the quality requirements for execution of the project, the procedure to be followed to be followed for meeting these requirements and the manner in which compliance of these requirements are verified. To achieve the aim of the pile safe, Serviceable, durable and economic piling work. The characteristics that a pile should possess to fulfil the requirements have to be specified. The codes of practice and the contract document strive to achieve this by way of defining design criteria, practical rules, technical specifications, testing and acceptance criteria and workmanship. All these strategies implicitly depend upon human skills for their successful and reliable application which eventually, determines the quality of highways. The basic desire to produce quality work is essential in the mind of all those connected with pile projects. The term quality has been defined as the totality of the features and characteristics of a product or services that bear on its ability to satisfy stated or implied needs. The in the contractual environments, needs requirements are specified, whereas in the other environment implied needs/requirement should be identified and defined. The code of practice endeavours to meet the requirements by rather pronged strategy. Firstly, it specifies the acceptable materials of construction outlining the various test of acceptance. Secondly it defines various design criteria practical rules and sound engineering practices for guiding the designers in arriving at appropriate structure solutions, and thirdly, it deals with the workmanship and the other aspects of construction which ensure that the design intents are realized in actual construction. The contract documents and technical specifications define the inter relation of various parties to contract as well as the requirements of quality. All these strategies implicitly depend upon human skills for their successful and reliable application. The total system of policy, management responsibility, procedures and processes for implementing quality management. The aspect of overall management function that determines the quality policy and implements it by such means as quality planning. Quality control and quality assurance within its quality system is called quality management. The quality of the product is ensured and maintained by following a documented project quality plan which sets out specific quality practices including quality control which are operational techniques of controlling quality. Quality assurances includes all those planned action necessary to provide adequate confidence that the product will meet the requirements and is essentially a system of planning, organizing and controlling the human skills to assure quality. Project quality plan sets out planned actions required quality assurance. Quality Assurance and project quality plan QA is defined as all the planned and systematic activities implemented with the quality system and demonstrated as needed, to provide the adequate confidence that an entity will fulfil the requirements. A project quality plan provides a base document outlining policy, procedures, responsibilities, compliance, acceptance criteria and documentation. It should be prepared and accepted by all parties concerned before start of project. 1.3 Project quality objective The objective is to meet needs and expectation and all the quality requirements established for the project, including all applicable codes and regulations in line with policy statement on quality. For this purpose, a project quality plan is established the project, based on the quality and procedure manuals. The specific practices, resources and sequence of activities appropriate to the project are documented in this project quality plan, to be known to and applied by all personal of the project team performing activities affecting quality. The responsibility of verifying the implementation of thus quality plan. Identifying quality problems and promoting solutions is assigned to the quality system department. Adequate levels to take necessary corrective action. 1.4 References Please refer to the preambles of the BOQ, tender documents, methodology shared, quality guidelines, contract conditions, amendments, instructions, etc., shared by Design Consultant, PMC & Client along with the below and not limited to: Quality system manual Quality system procedures OEM Recommendations Project quality plan Technical specifications Applicable IS & ASTM codes. Methodology / Construction Sequence: This is a generic statement and might vary at the site based on site conditions, soil strata, specifications, etc., of the pile being casted at. The pile is going to be founded on competent strata with cut-off level as mentioned in the respective drawings. • The location of the pile will be marked using total station with utmost care. • The piling rig/tripod rig will be centred over the designated pile location. • The pile hole will be bored continuously with regular draw out of drilled or cut oil using piling rig. When using tripod rig, bore hole will be bored by using direct mud circulation. • Upon reaching certain depth, the temporary casing will be inserted, centred over the hole and driven to full depth of casing. This is done as a precautionary measure to provide adequate stability to the freestanding sides of the bored walls. • The boring or cutting operations will be continued till termination depth of the pile As described in foundation design document. • All along this process, the pile shaft will be kept filled and agitated with drilling fluid for stabilizing the hole. • Reinforcement cages will be lowered up to the full depth of pile as per designed depth. Immediately after this process, Tremie pipes will be lowered leaving 300-500mm space at borehole bottom to avoid mixing of concrete with bentonite while concreting. • The bore will be “flushed” to the bottom before concreting by using drilling fluid if necessary. • Temporary casing will be extracted after the concreting of the shaft. Necessary top up concrete will be poured in the borehole. Quality Assurance and Quality control Parameters All the necessary concrete pour cards and checklists will be filled up during pre-pouring, during pouring and after-pouring. The concrete cubes will be cast in frequencies based on the concrete quantity, as per the relevant clauses of contract. Legal requirements or other requirements (e.g. national or international standards) concerning the calibration or verification of monitoring and measuring equipment. QA/ QC professional shall be deployed at site for monitoring of the site activities. Daily, weekly & monthly reports shall be generated and shared to PMC & Client. Preparation of the field quality plan The Field Quality Plan (FQP) is the prime project-level document which outlines the process steps required to ensure quality specifications and quality standards to be met. A typical FQP consists of Main text outlining roles and responsibilities of each team member, process steps, etc. Annexures consisting of forms, record sheets, checklists, etc. These are otherwise known as Field Quality Documents (FQD)/ Checklists. When the contract has been awarded the contractor to submit the Field quality plan which shall be reviewed and approved by PMC & Client. Upon approval, the FQP, method statements, etc. will be implemented at the site. Pile Testing Pile load test on selected piles will be carried out in accordance with contract conditions and as per IS 2911-2013 Part 4 and as per IS codes mentioned in the contract clauses, specifications shared along with the tender. Testing: o o o o All tests to be carried out only in NABL certified labs. All materials shall be as per the approved makes agreed by Client. All material shall be inspected and agreed by PMC & Client before use. Testing frequency of materials are listed below. Procedure for Control of Monitoring & Measurement Equipment 1. PURPOSE: Establish and maintain a procedure for calibration and maintenance of the inspection and test equipment to ensure that the equipment is capable of performing to required accuracy. 2. SCOPE: Quality Management System (Project Quality Plan) 3. RESPONSIBILITY: PRIMARY: QA/QC In-charge, Section In-charge SECONDARY: Project Manager 4. PROCEDURE: o Prepare list of measuring equipment used at Project; ensure adequate care is taken while selecting the monitoring and measuring instrument with suitable specifications, including range to be measured, accuracy and robustness under specific conditions. o o o o o o o o o Identify list of equipment’s requiring initial calibration prior to first use (both Internal & External) Prepare the process of measurement and ensure that monitoring & measurement is carried out as per the requirement. Prepare sequence of calibration and location Calibrate testing equipment traceable to international or national measurement standards and maintain its record. Protect from damage and deterioration during handling, Maintenance and storage. maintain the record indicating the unique identification of instrument, frequency of calibration, calibration status. Assessing and documenting the validity of previous inspection & test results when Non-conformity is found and take appropriate action on the equipment. If any software is used for the purpose the ability of the same to satisfy intended application shall be confirmed prior to use. In case of any equipment found to be out of calibration or non-confirming to requirements or out of order, label the equipment accordingly and isolate the instrument from point of use to prevent inadvertent use. Note: All Weights & Measures available in the project shall be validated with local Weights & Measures Department as applicable to statutory requirements. Validity shall be monitored through Master List of Instruments for Calibration. Roles & Responsibility Quality Assurance & Control Manager: To review and ensure required quality in day-to-day activities. Set up and monitor QA/QC activities at site. Prepare Quality Manuals & seek approval from Client/ Customer Ensuring the implementation of Procedures/ Work method statement at site for various processes and works Prepare & implement Corrective Actions for Non-Conformity raised by Customer to prevent recurrence. Organise training to workmen and staff as & when required. Plan and coordinate for conduct of Product Quality Ratings as per the frequency established. Inspection and approval for incoming materials Identify material sources, and conduct material tests and ensure conformity with specifications & standards. Conduct Routine Tests on materials & workmanship as per ITP for conformance and maintain records. Identify, Calibrate and maintain Master List of Testing and Measuring Equipment INSPECTION TEST PLAN / QUALITY PLAN FOR INCOMING CONSTRUCTION MATERIAL TESTING SL.NO 01 02 03 04 05 MATERIAL DETAILS Water Cement Each Type Each Brand Plasticizer Batching Plant Site Mix concrete or Ready-Mix concrete FREQUENCY OF TESTING /INSPECTION IS/JOB SPECIFICATION TEST CONDUCTED BY Suspended matter/organic and inorganic impurities From each source before start of work & thereafter every 6 months from outside lab for construction Purposes. If any source is used for drinking water the same must be tested quarterly IS 3025:1884 Part 17 IS 3025:1884 Part 24,25 Outside Laboratory pH Value Once in a week IS 456:2000 Site Laboratory Chloride & sulphate Content, Alkanity & Acidity Once initially & every 3 months IS 456:2000 Outside Laboratory Initial & Final Setting time Once initially & later at least once in month IS 4031:1988 Part VI Site Laboratory Compressive Strength Once initially & later at least once a month IS 4031:1988 Part V Site Laboratory Chemical Analysis Once initially & thereafter once every 6 months IS 4032:1985 Outside Laboratory Fineness & Soundness Once initially & thereafter once every 6 months IS 4031:1988 Part I & III Outside Laboratory 90µ Retention Once in a week Standard Consistency Once initially and later once in a month IS 4031:1988 Part IV Site Laboratory All tests pH Value, Dry Material Content, ash content Chloride ion content & other Parameter as per IS 9103 and relative density including chemical analysis Once for each type at the beginning & thereafter once in 6 months IS 9103:2004 Outside Laboratory Calibration Monthly, Manufacturer rep to be present at least thrice in first 6months IS 4925:2004 IS 2722:1964 At Site Slump Test During Concreting IS 456:2000 IS 1199:1959 Site Laboratory/at Site Chloride & Sulphate content Once in the beginning & with change of source & every month. Calculation based on ingredients contents IS 456:2000 Site Laboratory every month Compressive Strength (Each test sample comprising of 6 cubes of 15 cm. cube) As per specifications/ IS Codes IS 456:2000 IS 516-1959 Site Laboratory/at Site Permeability Test Note: Maximum 25mm on a specimen of 150mm Dia & 160mm height and RCPT maximum 2000 Coulombs Once in the beginning & thereafter once in three months DIN Specs and RCPT as per ASTM C 1202 Outside Laboratory Site Laboratory 05 Steel Reinforcement (Each Dia.) All Physical tests including bend, Re-bend, rolling margin, Tensile Strength, Elongation etc. Once in the beginning for each supplier & thereafter as per frequency specified below: Once for every 50MT or as directed by CQM IS 1786:1985 Outside Laboratory MTC Chemical Tests Once in the beginning for every supplier. Thereafter once in three months IS 1786:1985 Outside Laboratory Bend, Rebend & rolling Margin For Every Truck IS 1786:1985 Site Laboratory