الفهرس EUC BOOK STEPS FOR COOLING AND HEATING LOAD CALCULATION MANUAL 2 MEP CODE 50 HVAC Design 51 Firefighting Design Navisworks 77 107 141 239 AutoCAD 259 Plumbing Design Revit MEP Eng: Ahmed M.Shuhayb Phone: 01021522921 E-mail: ahmedshuhayb6@gmail.com Facebook: Ahmed Shuhayb Engineers Union Company EUC MEP BIM Developers MBD STEPS FOR COOLING AND HEATING LOAD CALCULATION MANUAL I'M 5A TEAM 9/25/2017 AHMED ABD-ELAAL AHMED SHUHAYB MOSTAFA ADEL AHMED EL-ZAWAWY ABEER ZIDAN AHMED EL-ZAGHAL IBRAHEM KANDIL Table of Contents OUT DOOR..................................................................................................................................1 WALL .......................................................................................................................................1 GLASS.. ................................................................................................................................6 SOLAR GLASS.. ....................................................................................................................8 IN DOOR ...................................................................................................................................22 LIGHTING ..............................................................................................................................22 PEOPLE ..................................................................................................................................28 MISCELLANEOUS ..................................................................................................................29 POWER EQUIPMENT.............................................................................................................33 PARTITION ............................................................................................................................35 OTHERS .....................................................................................................................................36 VENTILATION ........................................................................................................................36 INFILTERATION .....................................................................................................................39 FINALLY.....................................................................................................................................40 PSYCHROMETRIC CHART.......................................................................................................46 Out Door 𝑸 = 𝑼 × 𝑨 × 𝑪𝑳𝑻𝑫 For getting “U” From Table 1.1.1 1 BY : AHMED MOHAMED ABD-ELAAL 1 Or get “R” then “𝑈 = 𝑅 ” From Table 1.1.2 2 BY : AHMED MOHAMED ABD-ELAAL For getting “CLTD” For roof Table 1.1.3 3 BY : AHMED MOHAMED ABD-ELAAL For wall Table 1.1.4 4 BY : AHMED MOHAMED ABD-ELAAL For CLTD correction 𝐶𝐿𝑇𝐷 = (𝐶𝐿𝑇𝐷 + 𝐿𝑀) × 𝐾 + (78 − 𝑇𝑅 ) + (𝑇𝑜 − 85) For getting “LM” 𝐾=1 𝑇ℎ𝑒 𝑣𝑎𝑙𝑢𝑒 𝑜𝑓 𝐾 { 𝐾 = 0.83 𝐾 = 0.56 For roof Table 1.1.5 5 @𝐷𝑎𝑟𝑘 @𝑀𝑒𝑑𝑖𝑢𝑚 @𝐿𝑖𝑔ℎ𝑡 BY : AHMED MOHAMED ABD-ELAAL Glass 𝑄 = 𝑈 × 𝐴 × ∆𝑇 For getting “U” From Table 1.2.1 OR From Table 1.2.2 OR From Table 1.2.3 6 BY : AHMED MOHAMED ABD-ELAAL OR From Table 1.2.4 OR From Table 1.2.5 OVER-ALL FACTORS FOR SOLAR HEAT GAIN THRU GLASS WITH AND WITHOUT SHADING DEVICES* Outdoor wind velocity, 5 mph-Angle of incidence, 30 – Shading devices fully covering window GLASS FACTOR NO SHADE ORDINARY GLASS REGULAR PLATE (1/4 inch) HEAT ABSORBING GLASS†† 40 to 48% Absorbing 48 to 56% Absorbing 56 to 70% Absorbing DOUBLE PANE Ordinary Glass Regular Plate 48 to 56% Absorbing outside; Ordinary Glass inside. 48 to 56% Absorbing outside; Regular Plate inside. TRIPLE PANE Ordinary Glass Regular Plate PAINTED GLASS Light Color Medium Color Dark Color STAINED GLASS‡‡ Amber Color Dark Red Dark Blue Dark Green Greyed Green Light Opalescent Dark Opalescent INSIDE VENETIAL BLIND* 45° horiz. or vertical or ROLLER SHADE Light Medium Dark Color Color Color OUTSIDE OUTSIDE SHADING VENETIAN BLIND SCREEN† 45° horiz. slats 17° horiz. slats Light on Light Outside Medium** Dark§ Color Dark on Color Color Inside .15 .13 .22 .15 .14 .12 .21 .14 OUTSIDE AWNING‡ vent. sides & top Light Med. or Color Dark Color .20 .25 .19 .24 1.00 .94 .56 .56 .65 .65 .75 .74 .80 .73 .62 .56 .53 .51 .62 .59 .54 .72 .62 .56 .12 .11 .10 .11 .10 .10 .18 .16 .14 .12 .11 .10 .16 .15 .12 .20 .18 .16 .90 .80 .52 .54 .52 .36 .61 .59 .39 .67 .65 .43 .14 .12 .10 .12 .11 .10 .20 .18 .11 .14 .12 .10 .18 .16 .10 .22 .20 .13 .50 .36 .39 .43 .10 .10 .11 .10 .10 .12 .83 .69 .48 .47 .56 .52 .64 .57 .12 .10 .11 .10 .18 .15 .12 .10 .16 .14 .20 .17 .28 .39 .50 .70 .56 .60 .32 .46 .43 .37 7 BY : AHMED MOHAMED ABD-ELAAL Solar glass 𝑄 = 𝐴 × SHGF × 𝑆𝐶 × 𝐶𝐿𝐹 For getting “SHGF” From Table 1.2.6 8 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.6 9 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.6 10 BY : AHMED MOHAMED ABD-ELAAL For getting “CLF” From Table 1.2.7 11 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.8 12 BY : AHMED MOHAMED ABD-ELAAL For getting “SC” From Table 1.2.9 From Table 1.2.10 13 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.11 From Table 1.2.12 14 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.13 From Table 1.2.14 15 BY : AHMED MOHAMED ABD-ELAAL For getting “SHGF × CLF = SHG” From Table 1.2.15 16 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.15 17 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.15 18 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.15 19 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.15 20 BY : AHMED MOHAMED ABD-ELAAL From Table 1.2.15 21 BY : AHMED MOHAMED ABD-ELAAL IN Door Light 𝑄 = 3.41 × 𝑞 × 𝐹𝑎 × 𝐹𝑆 × 𝐴 × 𝐶𝐿𝐹 𝐴 → 𝑓𝑡 2 For 𝑔𝑒𝑡𝑡𝑖𝑛𝑔 𝐹𝑎 𝐹𝑎 ≅ 0.75 ∶ 1 𝐼𝑓 𝑤𝑒 ℎ𝑎𝑣𝑒 12 𝑙𝑎𝑚𝑏𝑠 𝑎𝑛𝑑 𝑤𝑒 𝑢𝑠𝑒 8 𝑙𝑎𝑚𝑏𝑠 𝑜𝑛𝑙𝑦 For 𝑔𝑒𝑡𝑡𝑖𝑛𝑔 𝐹𝑆 𝐹𝑠 ≅ 1 ∶ 1.25 ∴ 𝐹𝑎 = 8 12 = 0.75 𝐹𝑜𝑟 𝐿𝐸𝐷 𝐹𝑠 = 0.7 From Table 2.1.1 22 BY : AHMED MOHAMED ABD-ELAAL For getting “CLF” By 3 steps 1) From Table 2.1.2 2) From Table 2.1.3 23 BY : AHMED MOHAMED ABD-ELAAL 3) From Table 2.1.4A From Table 2.1.4B 24 BY : AHMED MOHAMED ABD-ELAAL From Table 2.1.4C From Table 2.1.4D From Table 2.1.4E 25 BY : AHMED MOHAMED ABD-ELAAL For getting 𝒒 → 𝑾⁄ 𝟐 𝒇𝒕 TABLE 2.1.5 Lighting Power Densities Using the Space-by-Space Method (continued) TABLE 2.1.5 Lighting Power Densities Using the Space-by-Space Method Common Space Typesa LPD, W/ft2 RCR Threshold Building-Specific Space Types Atrium LPD, W/ft2 RCR Threshold Audience Seating 0.82 4 Exhibit Space 1.45 4 Courtroom 1.72 6 Confinement Cells 1.10 6 Judges’ Chambers 1.17 8 Penitentiary Audience Seating 0.43 4 Penitentiary Classroom 1.34 4 Penitentiary Dining 1.07 6 0.38 8 Engine Room 0.56 4 Sleeping Quarters 0.25 6 0.03 per ft (height) NA 0.02 per ft (height) NA For auditorium 0.79 6 For Performing Arts Theater 2.43 8 For Motion Picture Theater 1.14 4 Classroom/Lecture/Training 1.24 4 Conference/Meeting/Multipurpose 1.23 6 Corridor/Transition 0.66 Width<8 ft Dining Area 0.65 4 For Bar Lounge/Leisure Dining 1.31 4 For Family Dining 0.89 4 Dressing/Fitting Room for Performing Arts Theater 0.40 6 Fitness Area 0.72 4 Electrical/Mechanical 0.95 6 Gymnasium Audience Seating 0.43 6 Food Preparation 0.99 6 Playing Area 1.20 4 First 40 ft in height Height above 40 ft Courthouse/Police Station/Penitentiary Audience/Seating Area—Permanent Dormitory Living Quarters Fire Stations Gymnasium/Fitness Center Hospital Laboratory For Classrooms 1.28 6 Corridor/Transition 0.89 Width < 8 ft For Medical/Industrial/Research 1.81 6 Emergency 2.26 6 0.90 4 Exam/Treatment 1.66 8 0.60 4 Lobby For Elevator 0.64 6 Laundry/Washing For Performing Arts Theater 2.00 6 Lounge/Recreation 1.07 6 For Motion Picture Theater 0.52 4 Medical Supply 1.27 6 0.75 6 Nursery 0.88 6 4 Nurses’ Station 0.87 6 Operating Room 1.89 6 0.62 6 Locker Room Lounge/Recreation 0.73 Office Enclosed 1.11 8 Patient Room Open Plan 0.98 4 Pharmacy 1.14 6 Physical Therapy 0.91 6 Radiology/Imaging 1.32 6 Recovery 1.15 6 Restrooms 0.98 8 Sales Area (for accent lighting, see Section 9.6.2(b)) 1.68 6 Stairway 0.69 10 Hotel/Highway Lodging Storage 0.63 6 Hotel Dining 0.82 4 Workshop 1.59 6 Hotel Guest Rooms 1.11 6 LPD, W/ft2 RCR Threshold Hotel Lobby 1.06 4 Highway Lodging Dining 0.88 4 Highway Lodging Guest Rooms 0.75 6 Card File and Cataloging 0.72 4 Reading Area 0.93 4 Stacks 1.71 4 Building-Specific Space Types Automotive Service/Repair 0.67 4 1.38 6 Library Bank/Office Banking Activity Area Convention Center 26 BY : AHMED MOHAMED ABD-ELAAL TABLE 2.1.5 Lighting Power Densities Using the Space-by-Space Method (continued) Building-Specific Space Types LPD, W/ft2 TABLE 2.1.5 Lighting Power Densities Using the Space-by-Space Method (continued) Building-Specific Space Types LPD, W/ft2 RCR Threshold Dressing/Fitting Room 0.87 8 RCR Threshold Retail Manufacturing Corridor/Transition 0.41 Width < 8 ft Detailed Manufacturing 1.29 4 Mall Concourse 1.10 4 Equipment Room 0.95 6 Sales Area (for accent lighting, see Section 9.6.3(c)) 1.68 6 Extra High Bay (>50 ft Floor to Ceiling Height) 1.05 4 High Bay (25–50 ft Floor to Ceiling Height) Audience Seating 0.43 4 1.23 4 Court Sports Arena—Class 4 0.72 4 Low Bay (<25 ft Floor to Ceiling Height) Court Sports Arena—Class 3 1.20 4 1.19 Court Sports Arena—Class 2 1.92 4 Court Sports Arena—Class 1 3.01 4 Ring Sports Arena 2.68 4 Air/Train/Bus—Baggage Area 0.76 4 Airport—Concourse 0.36 4 Sports Arena 4 Museum General Exhibition Restoration 1.05 1.02 6 Transportation 6 Parking Garage Garage Area 0.19 4 Post Office Sorting Area 0.94 4 0.54 4 Terminal—Ticket Counter 1.08 4 Fine Material Storage 0.95 6 Medium/Bulky Material Storage 0.58 4 Warehouse Religious Buildings Audience Seating 1.53 4 Fellowship Hall 0.64 4 a Worship Pulpit, Choir Audience Seating 1.53 4 27 In cases where both a common space type and a building-specific type are listed, the building specific space type shall apply. BY : AHMED MOHAMED ABD-ELAAL People 𝑄𝑠 = 𝑞𝑠 × N. person × 𝐶𝐿𝐹 𝑝𝑒𝑟𝑠𝑜𝑛 𝑄𝐿 = 𝑞𝐿 × N. person 𝑝𝑒𝑟𝑠𝑜𝑛 For getting “CLF” From Table 2.2.1 For getting “ 𝑞𝑠 𝑝𝑒𝑟𝑠𝑜𝑛 , 𝑞𝑙 𝑝𝑒𝑟𝑠𝑜𝑛 ” From Table 2.2.2 28 BY : AHMED MOHAMED ABD-ELAAL Miscellaneous 𝑞𝑠 = 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 × CLF 𝑞𝐿 = 𝐿𝑎𝑡𝑒𝑛𝑡 For getting “CLF” From Table 2.2.3 From Table 2.2.4 29 BY : AHMED MOHAMED ABD-ELAAL For getting “Sensible, Latent” From Table 2.2.5 30 BY : AHMED MOHAMED ABD-ELAAL From Table 2.2.6 31 BY : AHMED MOHAMED ABD-ELAAL From Table 2.2.7 If no value of sensible and latent at table we use 𝑞𝑠 = 𝐶𝑠 × 𝑞𝑠 × CLF 𝑞𝐿 = 𝐶𝐿 × 𝑞𝐿 For getting “𝐶𝑠 , 𝐶𝐿 ” From Table 2.2.8 32 BY : AHMED MOHAMED ABD-ELAAL Power Equipment 𝐴 𝑞𝑠 = {𝐵 × 𝐹𝐿 × 𝐶𝐿𝐹 𝐶 For getting “ A , B , C ” From Table 2.2.9 33 BY : AHMED MOHAMED ABD-ELAAL For getting “𝐹𝐿 ” From Table 2.2.10 For getting “CLF” From Table 2.2.4 34 BY : AHMED MOHAMED ABD-ELAAL Partition Heat flow thru the interior construction (floors, ceilings and partitions) is caused by a difference in temperature of the air on both sides of the structure. This temperature difference is essentially constant thru out the day and, therefore, the heat flow can be determined from the steady state heat flow equation, using the actual temperatures on either side. 𝑄 = 𝐴 × 𝑈 × ∆𝑇 3 TYPES The first case: The wall should be separated between two air-conditioned spaces. The temperature difference shall be zero The second case: The wall should be separated between two places, one of which is air-conditioned and the other not air-conditioned So the temperature difference ∆𝑇 = 33 − 𝑇𝐶 The third case: The wall should be separated between two places, one is air-conditioned and the other contains electrical and mechanical equipment So the temperature difference∆𝑇 = 43 − 𝑇𝐶 Where Tc is the temperature of the air-conditioned place and is almost equal 24 35 BY : AHMED MOHAMED ABD-ELAAL Ventilation 𝑄𝑠 = 1.08 × ∆𝑇 × 𝐶𝐹𝑀 𝐶𝐹𝑀 = ( 𝐹𝑜𝑟 𝐻𝑢𝑚𝑖𝑑𝑖𝑡𝑦 𝑅𝑎𝑡𝑖𝑜 (𝜔) { For getting ( 𝐶𝐹𝑀 𝑃𝑒𝑟𝑠𝑜𝑛 𝐶𝐹𝑀 ) , (𝐴𝑟𝑒𝑎) 𝑄𝐿 = 4840 × ∆𝜔 × 𝐶𝐹𝑀 𝐶𝐹𝑀 𝐶𝐹𝑀 ) × 𝑁. 𝑃𝑒𝑟𝑠𝑜𝑛 + ( ) × 𝐴𝑟𝑒𝑎 𝑃𝑒𝑟𝑠𝑜𝑛 𝐴𝑟𝑒𝑎 𝐼𝑁 → 𝑇𝐷𝐵 = 24℃ , ∅ = 50% ↔ ∴ 𝜔𝑖 = 0.0094 𝐾𝑔/𝐾𝑔𝑑.𝑎 𝑂𝑈𝑇 → 𝑇𝐷𝐵 = 43℃, 𝑇𝑊𝐵 = 28℃ ↔ ∴ 𝜔𝑜 = 0.0175 𝐾𝑔/𝐾𝑔𝑑.𝑎 TABLE 3.1.1 MINIMUM VENTILATION RATES IN BREATHING ZONE (This table is not valid in isolation; it must be used in conjunction with the accompanying notes.) People Outdoor Air Rate Rp Occupancy Category Area Outdoor Air Rate Ra cfm/person L/s·person cfm/ft2 Default Values Occupant Density (see Note 4) Combined Outdoor Air Rate (see Note 5) L/s·m2 #/1000 ft2 or #/100 m2 cfm/person L/s·person Notes Air Class Correctional Facilities Cell 5 2.5 0.12 0.6 25 10 4.9 2 Dayroom 5 2.5 0.06 0.3 30 7 3.5 1 Guard stations 5 2.5 0.06 0.3 15 9 4.5 1 7.5 3.8 0.06 0.3 50 9 4.4 2 Daycare (through age 4) 10 5 0.18 0.9 25 17 8.6 2 Daycare sickroom 10 5 0.18 0.9 25 17 8.6 3 Classrooms (ages 5–8) 10 5 0.12 0.6 25 15 7.4 1 Classrooms (age 9 plus) 10 5 0.12 0.6 35 13 6.7 1 Lecture classroom 7.5 3.8 0.06 0.3 65 8 4.3 1 Lecture hall (fixed seats) 7.5 3.8 0.06 0.3 150 8 4.0 1 Art classroom 10 5 0.18 0.9 20 19 9.5 2 Science laboratories 10 5 0.18 0.9 25 17 8.6 2 University/college laboratories 10 5 0.18 0.9 25 17 8.6 2 Wood/metal shop 10 5 0.18 0.9 20 19 9.5 2 Computer lab 10 5 0.12 0.6 25 15 7.4 1 Media center 10 5 0.12 0.6 25 15 7.4 1 Music/theater/dance 10 5 0.06 0.3 35 12 5.9 1 Multi-use assembly 7.5 3.8 0.06 0.3 100 8 4.1 1 Restaurant dining rooms 7.5 3.8 0.18 0.9 70 10 5.1 2 Cafeteria/fast-food dining 7.5 3.8 0.18 0.9 100 9 4.7 2 Bars, cocktail lounges 7.5 3.8 0.18 0.9 100 9 4.7 2 Break rooms 5 2.5 0.06 0.3 25 10 5.1 1 Coffee stations 5 2.5 0.06 0.3 20 11 5.5 1 Conference/meeting 5 2.5 0.06 0.3 50 6 3.1 1 Corridors – – 0.06 0.3 – 1 Storage rooms – – 0.12 0.6 – 1 Booking/waiting Educational Facilities A Food and Beverage Service General 36 B BY : AHMED MOHAMED ABD-ELAAL TABLE 3.1.1 MINIMUM VENTILATION RATES IN BREATHING ZONE (continued) (This table is not valid in isolation; it must be used in conjunction with the accompanying notes.) Occupancy Category People Outdoor Air Rate Rp Area Outdoor Air Rate Ra cfm/person L/s·person cfm/ft2 Default Values Occupant Density (see Note 4) Combined Outdoor Air Rate (see Note 5) L/s·m2 #/1000 ft2 or #/100 m2 cfm/person L/s·person Notes Air Class Hotels, Motels, Resorts, Dormitories Bedroom/living room 5 2.5 0.06 0.3 10 11 5.5 1 Barracks sleeping areas 5 2.5 0.06 0.3 20 8 4.0 1 Laundry rooms, central 5 2.5 0.12 0.6 10 17 8.5 2 Laundry rooms within dwelling units 5 2.5 0.12 0.6 10 17 8.5 1 7.5 3.8 0.06 0.3 30 10 4.8 1 5 2.5 0.06 0.3 120 6 2.8 1 Office space 5 2.5 0.06 0.3 5 17 8.5 1 Reception areas 5 2.5 0.06 0.3 30 7 3.5 1 Telephone/data entry 5 2.5 0.06 0.3 60 6 3.0 1 Main entry lobbies 5 2.5 0.06 0.3 10 11 5.5 1 Bank vaults/safe deposit 5 2.5 0.06 0.3 5 17 8.5 2 Computer (not printing) 5 2.5 0.06 0.3 4 20 10.0 1 Electrical equipment rooms – – 0.06 0.3 B – 1 Elevator machine rooms – – 0.12 0.6 B – 1 Pharmacy (prep. area) 5 2.5 0.18 0.9 10 23 11.5 2 Photo studios 5 2.5 0.12 0.6 10 17 8.5 1 Shipping/receiving – – 0.12 0.6 Telephone closets – – 0.00 7.5 3.8 – Auditorium seating area Lobbies/prefunction Multipurpose assembly Office Buildings Miscellaneous Spaces – 1 0.0 – 1 0.06 0.3 100 – 0.06 0.3 5 2.5 0.06 0.3 150 5 2.7 1 Places of religious worship 5 2.5 0.06 0.3 120 6 2.8 1 Courtrooms 5 2.5 0.06 0.3 70 6 2.9 1 Legislative chambers 5 2.5 0.06 0.3 50 6 3.1 1 Libraries 5 2.5 0.12 0.6 10 17 8.5 1 Lobbies 5 2.5 0.06 0.3 150 5 2.7 1 Museums (children’s) 7.5 3.8 0.12 0.6 40 11 5.3 1 Museums/galleries 7.5 3.8 0.06 0.3 40 9 4.6 1 Transportation waiting Warehouses B B 8 4.1 – 1 2 Public Assembly Spaces 37 BY : AHMED MOHAMED ABD-ELAAL TABLE 3.1.1 MINIMUM VENTILATION RATES IN BREATHING ZONE (continued) (This table is not valid in isolation; it must be used in conjunction with the accompanying notes.) People Outdoor Air Rate Rp Occupancy Category Area Outdoor Air Rate Ra cfm/person L/s·person cfm/ft2 Default Values Notes L/s·m2 Occupant Density (see Note 4) Combined Outdoor Air Rate (see Note 5) #/1000 ft2 or #/100 m2 cfm/person L/s·person Air Class Residential Dwelling unit 5 2.5 0.06 0.3 F,G F 1 Common corridors – – 0.06 0.3 Sales (except as below) 7.5 3.8 0.12 0.6 15 16 7.8 2 Mall common areas 7.5 3.8 0.06 0.3 40 9 4.6 1 Barbershop 7.5 3.8 0.06 0.3 25 10 5.0 2 Beauty and nail salons 20 10 0.12 0.6 25 25 12.4 2 Pet shops (animal areas) 7.5 3.8 0.18 0.9 10 26 12.8 2 Supermarket 7.5 3.8 0.06 0.3 8 15 7.6 1 Coin-operated laundries 7.5 3.8 0.06 0.3 20 11 5.3 2 Sports arena (play area) – – 0.30 1.5 Gym, stadium (play area) – – 0.30 7.5 3.8 Swimming (pool & deck) – Disco/dance floors 1 Retail Sports and Entertainment – 1 1.5 30 2 0.06 0.3 150 – 0.48 2.4 20 10 0.06 0.3 100 21 10.3 1 Health club/aerobics room 20 10 0.06 0.3 40 22 10.8 2 Health club/weight rooms 20 10 0.06 0.3 10 26 13.0 2 Bowling alley (seating) 10 5 0.12 0.6 40 13 6.5 1 Gambling casinos 7.5 3.8 0.18 0.9 120 9 4.6 1 Game arcades 7.5 3.8 0.18 0.9 20 17 8.3 1 Stages, studios 10 5 0.06 0.3 70 11 5.4 1 Spectator areas 38 E C D 8 4.0 – 1 2 BY : AHMED MOHAMED ABD-ELAAL Infilteration 𝑄𝑠 = 1.08 × ∆𝑇 × 𝐶𝐹𝑀 𝑄𝐿 = 4840 × ∆𝜔 × 𝐶𝐹𝑀 𝑁𝑎 × 𝑉𝑜𝑙𝑢𝑚𝑒 "𝑓𝑡 3 " 𝐶𝐹𝑀 = 60 𝑁𝑎 ≅ 0.8 For getting the value of Na Table 3.1.2 Estimates of Infiltration Airflow, Air Changes per Hour Neutral pressure, poor construction Neutral pressure, average construction Neutral pressure, tight construction pressurized, poor construction ( Hospital ) pressurized, average construction pressurized, tight construction 1.0 0.6 0.3 0.5 0.3 0.0 Summer air change rate, McQuiston 1985. Outdoor Design Temperature, oC 29 32 35 38 41 Type NA Number of air change from room volume per hour Tight 0.33 0.34 0.35 0.36 0.37 Medium 0.46 0.48 0.50 0.52 0.54 loose 0.68 0.70 0.72 0.74 0.76 Note: values for wind velocity of 3.4 m/s and indoor temperature of 24 oC 43 0.38 0.56 0.78 Winter air change rate, McQuiston 1985. Outdoor Design Temperature, oC 10 4 -1 -7 -12 Type NA Number of air change from room volume per hour Tight 0.41 0.43 0.45 0.47 0.49 Medium 0.69 0.73 0.77 0.81 0.85 loose 1.11 1.15 1.20 1.23 1.27 Note: values for wind velocity of 6.7 m/s and indoor temperature of 20 oC -18 0.51 0.89 1.30 𝑁𝐴 = 𝑎 + 𝑏 𝑉 + 𝑐 (𝑇𝑂 − 𝑇𝑖 ) Constants of Eq. for number of air change per hour. Type Tight Medium loose a 0.15 0.20 0.25 b 0.010 0.015 0.020 39 c 0.007 0.014 0.022 BY : AHMED MOHAMED ABD-ELAAL Finally 𝑅𝑜𝑜𝑚 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑅𝑇𝐻 , 𝑅𝑜𝑜𝑚 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑅𝑆𝐻 , 𝑅𝑜𝑜𝑚 → 𝑂𝑢𝑡 𝐴𝑖𝑟 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑂𝐴𝑇𝐻 , 𝑅𝑇𝐻 = 𝑅𝑆𝐻 + 𝑅𝐿𝐻 𝑂𝑢𝑡 𝐴𝑖𝑟 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑂𝐴𝑆𝐻 , 𝑉𝑒𝑛𝑡𝑖𝑙𝑎𝑡𝑖𝑜𝑛 = 𝑂𝑢𝑡 𝐴𝑖𝑟 → 𝐺𝑙𝑜𝑏𝑎𝑙 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝐺𝑇𝐻 , 𝐺𝑙𝑜𝑏𝑎𝑙 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝐺𝑆𝐻 , → 𝑆𝐻𝐹 = 𝐺𝑙𝑜𝑏𝑎𝑙 𝐿𝑎𝑡𝑒𝑛𝑡 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝐺𝐿𝐻 𝐺𝑇𝐻 = 𝐺𝑆𝐻 + 𝐺𝐿𝐻 𝑄𝑆 → 𝑡ℎ𝑒 𝑙𝑖𝑛𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑡ℎ𝑒 𝑟𝑜𝑜𝑚 𝑝𝑜𝑖𝑛𝑡[𝑅] 𝑎𝑛𝑑 𝑡ℎ𝑒 𝑠𝑜𝑢𝑟𝑐𝑒 𝑝𝑜𝑖𝑛𝑡[𝑆] 𝑄𝑇 𝐺𝑟𝑎𝑛𝑑 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 𝐹𝑎𝑐𝑡𝑜𝑟 → 𝐺𝑆𝐻𝐹 = 𝐺𝑆𝐻 → 𝑡ℎ𝑒 𝑙𝑖𝑛𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑡ℎ𝑒 𝑝𝑜𝑖𝑛𝑡[𝑀] 𝑎𝑛𝑑 𝑡ℎ𝑒 𝑝𝑜𝑖𝑛𝑡[𝐴𝐷𝑃] 𝐺𝑆𝐻 + 𝐺𝐿𝐻 𝐸𝑓𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑅𝑜𝑜𝑚 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 𝐹𝑎𝑐𝑡𝑜𝑟 𝐵𝑦 𝑝𝑎𝑠𝑠 𝑓𝑎𝑐𝑡𝑜𝑟 𝐸𝑅𝑆𝐻𝐹 = 𝑂𝑢𝑡 𝐴𝑖𝑟 𝐿𝑎𝑡𝑒𝑛𝑡 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑂𝐴𝐿𝐻 𝑂𝐴𝑇𝐻 = 𝑂𝐴𝑆𝐻 + 𝑂𝐴𝐿𝐻 𝐺𝑙𝑜𝑏𝑎𝑙 (𝑅𝑜𝑜𝑚 + 𝑉𝑒𝑛𝑡𝑖𝑙𝑎𝑡𝑖𝑜𝑛) → 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 𝐹𝑎𝑐𝑡𝑜𝑟 𝑅𝑜𝑜𝑚 𝐿𝑎𝑡𝑒𝑛𝑡 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑅𝐿𝐻 → → 𝑏𝑝𝑓 𝐸𝑅𝑆𝐻𝐹 0.72 ≤ 𝐸𝑅𝑆𝐻𝐹 ≤ 1 0.1 ≤ 𝑏𝑝𝑓 ≤ 0.15 𝑅𝑆𝐻 + (𝑏𝑝𝑓 × 𝑂𝐴𝑆𝐻) → 𝑡ℎ𝑒 𝑙𝑖𝑛𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑡ℎ𝑒 𝑝𝑜𝑖𝑛𝑡[𝑅] 𝑎𝑛𝑑 𝑡ℎ𝑒 𝑝𝑜𝑖𝑛𝑡[𝐴𝐷𝑃] (𝑅𝑆𝐻 + 𝑅𝐿𝐻) + 𝑏𝑝𝑓 × (𝑂𝐴𝑆𝐻 + 𝑂𝐴𝐿𝐻) For calculating “CFM” 𝐶𝐹𝑀 = 𝑅𝑆𝐻 + (𝑏𝑝𝑓 × 𝑂𝐴𝑆𝐻) (1 − 𝑏𝑝𝑓) × 1.08 × (𝑇𝑑𝑏 − 𝑇𝐴𝐷𝑃 ) 40 BY : AHMED MOHAMED ABD-ELAAL For getting TADP TABLE 4.1.1- APPARATUS DEWPOINTS 41 BY : AHMED MOHAMED ABD-ELAAL TABLE 4.1.1- APPARATUS DEWPOINTS (Continued) 79 – 72 F DB 42 BY : AHMED MOHAMED ABD-ELAAL TABLE 4.1.1- APPARATUS DEWPOINTS (Continued) 72 – 55 F DB *The values shown in the gray areas indicate the lowest effective sensible heat factor possible without the use of reheat. This limiting condition is the lowest effective sensible heat factor line that intersects the saturation curve. Note that the room dewpoint is equal to the required apparatus dewpoint for an effective sensible heat factor of 1.0. NOTES FOR TABLE 65: 1. For Room Conditions Not Given; The apparatus dewpoint may be determined from the scale on the chart, or may be calculated as shown in the following equation: ESHF = 1 (Wrm – Wadp) 1 + .628 (trm – tadp) This equation in more familiar form is: ESHF = 43 0.244 (trm – tadp) 1076 0.244 (trm – tadp) + 7000 (Wrm – Wadp) (Cont.) BY : AHMED MOHAMED ABD-ELAAL 44 BY : AHMED MOHAMED ABD-ELAAL 45 BY : AHMED MOHAMED ABD-ELAAL 46 BY : AHMED MOHAMED ABD-ELAAL MEP CODE Eng: Ahmed M. Shuhayb Phone: 01021522921 Engineers Union Company (EUC) 1 HVAC Design Eng. Ahmed Shuhayb |01021522921 2 HVAC Design معامل الضوضاء Eng. Ahmed Shuhayb |01021522921 3 HVAC Design عالقة سرعة الهواء الخارج مع معامل الضوضاء الكود المصري معامل تصحيح :هي المسافة بين والحائط أو نص المسافة بين عدد :مسافة القذق :البد من عمل تعديل على مسافة القذق بالقسمة على لحدوث هبوط في قيمه ال نتيجة الختالف درجة حرار االرسال ودرجة حرارة الغرفة Eng. Ahmed Shuhayb |01021522921 4 HVAC Design سرعة الهواء داخل االماكن المكيفة الكود المصري Eng. Ahmed Shuhayb |01021522921 5 HVAC Design سرعة الهواء داخل المستشفيات الكود المصري Eng. Ahmed Shuhayb |01021522921 6 HVAC Design معدل تغير الهواء فى الساعة أبعاد الهود المطلوبة Eng. Ahmed Shuhayb |01021522921 7 HVAC Design قيمة التدفق هواء الطرد للمتر الطولي للمعدة القوانين المستخدمة فى التهوية العادية ) ACH ∗ 𝑉𝑜𝑙𝑢𝑚𝑒(𝑚3 = 𝑀𝐹𝐶 1.7 & ) ACH ∗ 𝑉𝑜𝑙𝑢𝑚𝑒(𝐹𝑡 3 = 𝑀𝐹𝐶 60 القوانين المستخدمة فى التهوية غرف المحركات )𝑟H (Btu/ℎ 𝑟𝑖𝐴 𝑛𝑜𝑖𝑡𝑠𝑢𝑏𝑚𝑜𝐶 + )ρ(0.027) ∗ 𝐶𝑝 (0.24) ∗ ∆T(18 − 20 = 𝑀𝐹𝐶 مساحة الفتحات االزمة للتهوية لغرفة المحركات 𝑴𝑭𝑪 )𝟎𝟎𝟎𝟏𝐕 (𝟒𝟎𝟎− =𝑨 مساحة = Eng. Ahmed Shuhayb |01021522921 8 HVAC Design قيمة السرعة العظمى قيمة Eng. Ahmed Shuhayb |01021522921 9 HVAC Design سمك الصاح المجلفن واالستانليس Eng. Ahmed Shuhayb |01021522921 10 HVAC Design - للحصول علي سمك الحامل – المسافة بين الحامل والحامل – وقطر التيش - للحصول علي سمك الزاوية – المسافة بين الزاوية والزاوية – وقطر التيش Eng. Ahmed Shuhayb |01021522921 11 HVAC Design Eng. Ahmed Shuhayb |01021522921 12 HVAC Design Eng. Ahmed Shuhayb |01021522921 13 HVAC Design Eng. Ahmed Shuhayb |01021522921 14 HVAC Design Eng. Ahmed Shuhayb |01021522921 15 HVAC Design Eng. Ahmed Shuhayb |01021522921 16 HVAC Design Eng. Ahmed Shuhayb |01021522921 17 HVAC Design قيمة لحساب 𝑃∆ 𝑙 ∗ أطول مسار = 𝐶 ∗ 𝑉𝑝 + باإلضافة الي مفاقيد( مفاقيد( ) ) Eng. Ahmed Shuhayb |01021522921 ملحقات للحصول على قيم السرعات المناسبة للداكت : Eng.Ahmed M.Shuhayb l 01021522921 Fitting of Duct : Eng.Ahmed M.Shuhayb l 01021522921 التحاميل وفقا للكود المصري : للحصول علي قيمة :Gage Eng.Ahmed M.Shuhayb l 01021522921 المقصود بالطول المميز: عالقة السرعة بمعامل الضوضاء: تصحيح قيمة معامل الضوضاء بناء على عدد المخارج: Eng.Ahmed M.Shuhayb l 01021522921 Eng.Ahmed M.Shuhayb l 01021522921 Eng.Ahmed M.Shuhayb l 01021522921 Eng.Ahmed M.Shuhayb l 01021522921 : األطوال المكافئة Eng.Ahmed M.Shuhayb l 01021522921 الحد االعظمى في الهاب : تصحيح قيمة الحرارة المحسوسة الناتجة من الكتالوج : Eng.Ahmed M.Shuhayb l 01021522921 1 Fire Fighting 𝐎𝟐 : %15 نظام الغاز قلل نسبة االكسجين الى Heat: Water System Fuel: Foam System Eng: Ahmed M.Shuhayb 01021522921 EUC 2 Types of Systems -Wet Pipe System هو نظام يتكون من رؤوس مرشات مائية تعمل اوتوماتيكياً ،متصلة بشبكة أنابيب مملوءة بالماء يتم االستعانة بالنظام الرطب كنظام إطفاء في االنشغاالت والمساحات التي تكون فيها درجة الحرارة طبيعية وال تزيد درجة حرارة الماء عن 70ال تقل عن 4أو األنظمة التي تحتاج إلى ضغط ال يزيد عن 12.1بار -Dry Pipe System هو نظام يتكون من رؤوس مرشات مائية تعمل اوتوماتيكياً ،متصلة بشبكة أنابيب مملوءة بالهواء او النيتروجين المضغوط يتم االستعانة بالنظام الرطب كنظام إطفاء في االنشغاالت والمساحات التي تكون فيها درجة الحرارة تزيد درجة حرارة الماء عن 70تقل عن 4أو األنظمة التي تحتاج إلى ضغط يزيد عن 12.1بار -PreactionSystem هو نظام يتكون من رؤوس مرشات مائية تعمل اوتوماتيكياً ،متصلة بشبكة أنابيب مملوءة بالهواء المضغوط أو غير المضغوط وبنظام انذار اوتوماتيكي متصل بلوحة تحكم رئيسية ،بحيث يتم توزيع مكونات نظام اإلنذار األوتوماتيكي) كواشف حرارة أو دخان أو لهب( في المنطقة نفسها المحمية برؤوس المرشات المائية ،وعند عمل نظام اإلنذار فإنه يرسل إشارة إلى الصمام السبّاق ليسمح هذا الصمام بدوره بمرور الماء في شبكة األنابيب ومن ثم التدفق من أي رأس مرش أو رؤوس مرشات مفتوحة نتيجة لتأثرها بالحرارة الموجودة في الحيز الذي تكون مركبة فيه يمكن وضع هذا النظام في غرف الحاسوب والمختبرات والمكتبات واالنشغاالت المشابهة - Deluge System يتكون النظام من رؤوس مرشات مائية مفتوحة دون بصيلة متصلة بشبكة أنابيب تتزود من مصدر مياه من خالل صمام يسمى صمام الغمر. تتم االستعانة بنظام الغمر الكامل كنظام إطفاء في االنشغاالت والمساحات التي تحتاج كميات كبيرة من الماء لإلطفاء في وقت قصير ،وفي االنشغاالت التي تكون سرعة اشتعال المواد فيها عالية مثل خزانات الغاز المسال والسوائل المشتعلة وهناجر الطائرات والمحوالت الكهربائية ،يكون نظام اإلنذار الذي يعمل على تشغيل صمام الغمر أما ميكانيكي باستخدام الماء أو ميكانيكي باستخدام الهواء أو باستخدام الكهرباء النظام الميكانيكي باستخدام الماء :هو عبارة عن أنابيب قطرها mm 25مملوءة بالمياه النظام الميكانيكي باستخدام الهواء :هو عبارة عن أنابيب قطرها mm 15بالهواء المضغوط Eng: Ahmed M.Shuhayb 01021522921 EUC 3 Eng: Ahmed M.Shuhayb 01021522921 EUC 4 Pump Room Flow Meter Pressure Relief Valve OS&Y Valve Control Panel Eccentric Reducer r Strainer r Sensing Line Alarm Check Valve 2-Pressure Gage Flow Switch Gate Valve Tamper Switch Water Alarm Valve OS&Y Valve Pressure Gage Relief Valve Flow Switch Check Valve Main Pump: Electrical Stand by: Diesel Start Up: Jokey الهدف منها وضع النظام تحت الضغط %2:3GPM وحوالى10 PSI يكون ضغطها اعلى من المحسوب بحوالي "ايهما أكبر6 أوD0.5 يبعد عن قاع الخزان بElbowالماسورة للي خارجة من الخزان بيتم توصيلها من الداخل ب Vortexلتجنب حدوث Eng: Ahmed M.Shuhayb 01021522921 EUC 5 حسابات سعة الخزان 𝐶=(𝑄𝑇∗3.78∗𝑇𝑖𝑚𝑒)/1000 30دقيقة للخطورة المنخفضة 60دقيقة للخطورة العادية 90دقيقة للخطورة العالية (𝑄𝑇:( gpm ) 𝐶: (𝑚3 )𝑇𝑖𝑚𝑒 : (min حساب قطر ماسورة الصاعد : ال يقل قطر الصواعد الخاصة باإلطفاء اليدوي عن "4 تحديد اقطار المواسير الرئيسية ال يجب ان يقل عن 6بوصة اال في الحاالت التالية : عندما تشير الحسابات الهيدروليكية تشير الي ان الضغوط ستكون مناسبة -المواسير ال تغذي عسكري حريق المواسير التي تغذي فقط رشاشات اتوماتيكية او رشاشات مفتوحة اوclass II standpipes Eng: Ahmed M.Shuhayb 01021522921 EUC 6 مقاسات الوصالت بغرفة المضخات Eng: Ahmed M.Shuhayb 01021522921 EUC 7 Eng: Ahmed M.Shuhayb 01021522921 EUC 8 Sprinkler :مكونات المرش FrameOrificeCap/SealGlass BulbDeflector- Eng: Ahmed M.Shuhayb 01021522921 EUC 9 Type of Sprinkler Eng: Ahmed M.Shuhayb 01021522921 EUC 10 خطوات التصميم تحديد درجة الخطورة: -1الخطورة الخفيفة حيث كمية ضئيلة من المواد القابلة لالشتعال ومعدل اطالق حراري منخفض جدا ومن االماكن التي تتبع تلك الخطورة دور العبادة النوادي المباني التعليمية المكتبات ماعدا غرف التخزين الكبيرة المكاتب المباني السكنية اماكن الجلوس بالمطاعم المسارح وقاعات االستماع ماعدا خشبة المسرح الفراغات غير المستعملة اسفل السقف -2الخطورة العادية مجموعة A كميات ضئيلة من المواد ذات القابلية المتوسطة لالشتعال وبارتفاع ال يزيد عن 2.4متر ومن االماكن التي تتبع تلك الخطورة الجراجات والمعارض للسيارات المخابز تصنيع المشروبات والمعلبات االلكترونيات تصنيع الزجاج ومنتجاته المعامل مواقع اعداد الطعام بالمطاعم مجموعة B ال يزيد االرتفاع عن 3.7متر ومن االماكن التي تتبع تلك الخطورة الخيول محالت االجهزة واآلالت معالجة المعادن المحالت التجارية مطاحن الغالل منشآت او مصانع الكيماويات العادية الخمور التنظيف الجاف منتجات الجلود عنابر طحن الورق ومعالجته ولباب الثمر ارصفة الموانئ والمعابر المؤدية للسفن مكاتب البريد دور الطبع والنشر -3الخطورة العالية مجموعة A .كميات كبيرة من مواد لها معدل احتراق عالية جدا ولكن تحتوي علي كمية قليلة او ال تحتوي من السوائل الملتهبة ومن االماكن التي تتبع تلك الخطورة حظائر الطائرات اماكن استخدام الزيوت الهيدروليكية صب القوالب او المسابك مصانع االخشاب مطابع االحبار ذات نقطة الوميض اقل من 38درجة مئوية معالجة المطاط التنجيد باإلسفنج الصناعي او الفوم مجموعة B حرائق المواد الملتهبة ومن االماكن التي تتبع تلك الخطورة التشبع بالغاز الطالء بالسريان او االنسياب تصنيع المباني الجاهزة او تجميع اجزائها وعمليات التسقية المفتوحة بالزيوت معالجة البالستيك والدهان بالغمس Eng: Ahmed M.Shuhayb 01021522921 EUC 11 االعتبارات التصميمية لتركيب الرشاشات )(SS Upright or Pendent Obstructed ceiling نوع االسقف الذي به معوقات للتدفق المائي للرشاشات مثل الكمر Un obstructed ceiling نوع االسقف التي تكون المسافة بين الكمرات اكبر من 2.3متر او االسقف ذات الكمر المفتوح مثل الموجود بالهناجر المسافات القصوى بين الرشاشات وتحدد حسب الخطورة من الجدول االتي: أقل مسافة بين الرشاشات ال يجب ان تقل عن 1.8متر حتي ال يبرد احدهما االخر فيمنع انفجاره ويسبب امتدد الحريق Eng: Ahmed M.Shuhayb 01021522921 EUC 12 المسافات القصوى والدنيا بين الرشاشات والحوائط ال يجب ان تزيد المسافة بين الرشاشات والحوائط عن نصف المسافة بين الرشاشات وبعضها اال في حالة الحوائط غير المنتظمة حيث يسمح ب 0.75من المسافة القصوى بين الرشاشات وال يجب ان تقل عن 10سم وبصفة عامة ال تزيد المسافة عن 2.7متر Unobstructed ceiling نوع االسقف التي تكون المسافة بين الكمرات اكبر من 2.3متر او االسقف ذات الكمر المفتوح مثل الموجود بالهناجر Eng: Ahmed M.Shuhayb 01021522921 EUC 13 Obstructed ceiling نوع االسقف الذي به معوقات للتدفق المائي للرشاشات مثل الكمر وفي حال االسقف التي بها كمر يجب ان تكون المسافة بين رأس الرشاش واسفل الكمرة ما بين (" )6"-1بحيث ال تزيد المسافة بين رأس الرشاش والسقف عن"22 ويفضل ان يتم الحفاظ علي اقصي مسافة بين الرشاش والسقف علي 12بوصة في حالة قلة المسافة بين الكمر وبعضه عن 2.3متر Eng: Ahmed M.Shuhayb 01021522921 EUC 14 االعتبارات التصميمية لتركيب الرشاشات )(SS.Side المسافات القصوى بين الرشاشات وتحدد حسب الخطورة من الجدول االتي: المسافة بين الرشاش والسقف تكون بين 4و 6بوصة ويمكن ان تزيد المسافة الي 18بوصة ولكن باستعمال رشاشات مخصصة لذلك بالنسبة للحوائط المتقابلة يسمح بان تكون المسافة بينها 7.32متر في حالة الخطورة الخفيفة و6.1متر في حالة الخطورة العادية Eng: Ahmed M.Shuhayb 01021522921 EUC 15 تحديد المساحة التصميمية وعدد الZCVs هي اكبر مساحة ممكن تركيب وتجميعها علي مجموعة صمامات تحكم واحدة ويتم تحديد ذلك طبقا لدرجة الخطورة كاآلتي المساحة في حالة الخطورة الخفيفة والعادية هي 4831متر مربع وفي حالة الخطورة العالية هي 2323متر مربع وذلك في حالة الحساب بطريقة جداول المواسير و 3716متر مربع في حال الحسابات الهيدروليكية تحديد اقطار المواسير Eng: Ahmed M.Shuhayb 01021522921 EUC 16 Eng: Ahmed M.Shuhayb 01021522921 EUC 17 Eng: Ahmed M.Shuhayb 01021522921 EUC 18 :حساب التدفق والضغط عند أبعد مرش 𝑄𝑠𝑡.=𝐴𝑆×𝐷𝑑 𝑄𝑠𝑡.=𝐾 √𝑃𝑠𝑡. ΔP/L=(4.52 * Q ^1.85)/(c^1.85*d^4.87) Q: GPM Eng: Ahmed M.Shuhayb 01021522921 EUC D:in L: Ft ΔP:Psi 19 أي مضخات للحريق يجب ان تحقق االتي: عند التدفق %150من التدفق المحدد لها يجب ان يكون الضغط % 65من الضغط المحدد لها وان يكون ضغط التدفق الصفري (ضغط الغلق) ال يزيد عن % 140من الضغط المحدد وفى حالة لو كان الضغط عند التدفق الصفري اقل من %121من الضغط المحدد ال حاجة الىPressure Relief Valve )Q(pump)= Q (Fire Hose) +Q(Sprinklers) + Q(Riser Pump head (PSI)=friction losses + static head + Residual pressure Static head= Building Height /10.28 Eng: Ahmed M.Shuhayb 01021522921 EUC 20 مواسير الصرف : المسافة بين التحاميل و قطر األتياش: Eng: Ahmed M.Shuhayb 01021522921 EUC 21 أكواد المواسير المعلقة : أكواد المواسير المدفونة : Eng: Ahmed M.Shuhayb 01021522921 EUC 22 Eng: Ahmed M.Shuhayb 01021522921 EUC 23 :Scheduleسمك المواسير طبقا لنوع Eng: Ahmed M.Shuhayb 01021522921 EUC 24 (StandPipes) Fire Hose Cabient خرطوم من المطاط ملفوف على بكرة لها زراع - Hose Reel : خرطوم من القماش المقوي يستخدمة الدفاع المدنى - Hose Rack : يوضع بالقرب من المخارج وساللم الهروب ويغطى مسافة 30متر ارتفاع الصندوق 150 :90سماألنواع: Exposed -1بارزعن الحائط بمسافة 25سم Semi predated -2بارز من الحائط 10سم وغاطش 15سم Recessed-3غاطس بالكامل في الحائط هو عبارة عن صندوق حريق يحتوى على حنفية 2.5بوصة أو 1.5بوصة أو كليهما Class(1) : 2.5 “- 250 gpm – 6.7 bar Class(2) : 1” or 1.5 “- 100 gpm – 4.5 bar Class(3) : 1.5” or 2.5 “ - 250 gpm – 6.7 bar اوال النوع االول والثالث من الصناديق يكون للصاعد االبعد 500جالون بالدقيقة ولكل صاعد بعد ذلك 250جالون بالدقيقة وبحد اقصي 1250جالون بالدقيقة، واذا زادت المساحة عن 7432متر مربع يتم زيادة الصاعد الذي يليه الى 500جالون بالدقيقة ثانيا النوع الثانى من الصناديق 100 gpmللصاعد االبعد وبدون زيادة للصواعد األخرى ونفس الكالم للحسابات الهيدروليكية في حالة النظام Combinedصناديق حريق +رشاشات يسمح فقط للصناديق 1000gpmبدل من 1250 طريقة الحسابات : هحسب مرة على الرشاشات +صناديق الحريق من النوع الثانى-هحسب مرة أخرى على صنادي الحريق من النوع األول او الثالث هختار األعلى فيQ ,H السرعة في انظمة مكافحة الحريق ال تقل عن 10Fpsوال تزيد عن 21Fps Eng: Ahmed M.Shuhayb 01021522921 EUC 25 Eng: Ahmed M.Shuhayb 01021522921 EUC 26 Fire Hydrant في حالة انتشار الحريق يتم استخدام عساكر الحريق Fire Hydrant وتكون حول المبنى وتغطى مسافة 30متر وهي حنفية 2.5بوصه ضغط 6.7بار و 250جالون بالدقيقة بعض الدول العربية يتم عمل Dry Riserتوصل كل دور عليه موصله بطلمبة الحريق وتكون ماسورة "4ويركب صمام عدم رجوع Riserينتهى Siemens Connectionsوتسمى الماسورة ب Landing Valve توضع الوصلة واضحة في واجهة المبنى حتى يتم توصيليها بعربية تعزيز للرشاشات في حالة نفاء الماء من الخزان عسكري الحريق 2* 2.5Hose Nozzle 1* 4.5Bumper Nozzle Eng: Ahmed M.Shuhayb 01021522921 EUC 27 Fire Extinguishers طفايات الحريق هي الخط الدفاع األول عند حدوث الحريق وينقسم الطفايات حسب درجة الخطورة والمراد لتي بداخلها والمواد القابلة لالحتراق واالشتعال )( (Water or Dry Chemical, Foamمطاط – بالستيك – أخشاب – ورق – أقمشة) Class A )( (Foam, Co2, Dry Chemical, FFFP, AFFFزيوت – غازات – السوائل الملتهبة) Class B )( (Co2, Dry Chemicalالكهرباء) Class C (مواد الصوديوم والماغنسيوم) Class D )( (Wet chemical powderخاص بالمطابخ) Class K Classification of Hazard: -Light: A&B -Ordinary: A&B -Extra: A&B Note: الطفاية التي تزيد عن 18كيلوجرام توضع على ارتفاع 1متر من القمةالطفاية التي ال تزيد عن 18كيلوجرام توضع على ارتفاع 1.5متر القمة-ارتفاع الطفاية من على األرض ال تقل 10سم Eng: Ahmed M.Shuhayb 01021522921 EUC 28 المسافات بين طفايات الحريق والمساحة التي يغطيها الرشاش للحصول على عدد الطفايات بقسم المساحة على المساحة اللي بغيطيها الطفاية طبقا للجدول األول Class C ويتم التوزيع طبقا لA, B Class D ال يجب ان تزيد المسافة االرتحالية بين الطفاية والخطورة عن 23متر Class K ال تزيد المسافة االرتحالية بين الطفاية والخطورة عن 9.15متر Eng: Ahmed M.Shuhayb 01021522921 EUC 29 FM200 من الممكن استخدام غاز ثاني أكسيد الكربون في نظام اإلطفاء ولكن في األماكن الذي ال يتواجد فيها اشخاص غاز ثانى أكسيد الكربون عندما تصل نسبة تركيزه فى الهواء الجوى فى مكان ما إلى 0.03 إلى 0.04يتسبب ذلك فى زيادة معدل تنفس اإلشخاص الموجودين بالمكان و عندما تصل نسبته إلى 0.09يتسبب ذلك غلى فقدان الوعى لإلنسان و إذا وصل إلى 0.2يتسبب بالوفاة يتم تصميم نظام اإلطفاء األتوماتيكى بغاز ثانى أكسيد الكربون على أن يكون نسبته 0.34 لكى نقلل من نسبة األكسجين فى المكان إلى أقل من 0.16لذلك ال نستخدم غاز ثانى أكسيد الكربون فى األماكن التى يتواجد فيها أشخاص وذلك يرجع إلى طبيعة الغاز الخانقة. Design FM 200 W= V * Cf* Catt )W: Minimum required FM200 quantity (KG )V: net Hazard volume (m3 ) Cf: flooding factor (kg / m3)----( table 5.5.3.3 Design concentration 7% for class A & C 9% for class B Calt: altitude correction factor )W = V/S (c /100-c )Where W :required FM200 Quantity (KG )V= net hazard volume (m3 ) S=specific vapor volume (m3/kg )----( table A5 .5.1 = 0.1269 + .0005131 T @ sea level ) C = concentration ( 6.7 % to 8.7 % Eng: Ahmed M.Shuhayb 01021522921 EUC 30 Eng: Ahmed M.Shuhayb 01021522921 EUC 1 Plumbing Eng: Ahmed M.Shuhayb 01021522921 EUC 2 Domestic Cold Water Water Tank سعة خزان المياة = عدد االشخاص في المبنى* استهالك المياه للشخص الواحد * عدد أيام التخزين طريقة أخري لحساب عدد األشخاص = مساحة المبنى /أقصى مساحة يشغلها الشخص الواحد Eng: Ahmed M.Shuhayb 01021522921 EUC 3 Eng: Ahmed M.Shuhayb 01021522921 EUC 4 Gravity Tank System Eng: Ahmed M.Shuhayb 01021522921 EUC 5 Hydropenumatic Tank System هنا الهواء المضغوط الذي يدفع المياة داخل Systemفي االحمال القليلة وعندما يزداد الحمل تقوم المضخة بالعمل و %50يدخل الى %50,Systemتدخل الى Tank الضغط داخل ال Tankأعلى م ضغط ال Systemبمقدار 20 PSI Eng: Ahmed M.Shuhayb 01021522921 EUC 6 Eng: Ahmed M.Shuhayb 01021522921 EUC 7 Eng: Ahmed M.Shuhayb 01021522921 EUC 8 Booster Pumps System Eng: Ahmed M.Shuhayb 01021522921 EUC 9 Eng: Ahmed M.Shuhayb 01021522921 EUC 10 حساب احتياجات المبنى من المياه 1-WSFU Eng: Ahmed M.Shuhayb 01021522921 EUC 11 2-WSFU to GPM Eng: Ahmed M.Shuhayb 01021522921 EUC 12 3-Diameter of Pipe pipe sizerمن خالل برنامج قدم100 قدم لكل10 مفاقيد الضغط,( 2:10Fps( سرعة المياة- Eng: Ahmed M.Shuhayb 01021522921 EUC 13 حسابات المضخة الضغط نتيجة االحتكاك+ الضغط نتيجة االرتفاع+ ضغط المضخة = الضغط المطلوب عند أبعد جهاز Pump head (PSI( =friction losses + static head + Residual pressure Residual pressure: Eng: Ahmed M.Shuhayb 01021522921 EUC 14 Static head = Building Height / 10.28 Friction losses = [pipe length + equal length (fitting)] ∆𝑷/𝟏𝟎𝟎𝑭𝒕 Eng: Ahmed M.Shuhayb 01021522921 EUC 15 لحساب المفاقيد في Riserنجمع FUفي كل دورومن خالل FUالكلى نحصل علي القطر والمفاقيد ملحوظة ال نجمع GPMبتاع كل دورللحصول علي GPMالكلي Eng: Ahmed M.Shuhayb 01021522921 EUC 16 Domestic Hot Water Storage Tank Capacity= ∑ 𝑮𝑷𝑯 * Demand Factor * Storage Capacity Factor Eng: Ahmed M.Shuhayb 01021522921 EUC 17 معدالت التسخين للوحدات الصحية: Eng: Ahmed M.Shuhayb 01021522921 EUC 18 لحساب قدرة الكهربية للسخان بعد حساب GPHنقسم الى 60لتحويلها الى GPMثم ندخل الخريطة ونحدد قطر ماسورة تغذية السخان مع مراعاة ان ال تزيد السرعة عن 5 ft/secوال 10ft/100ft friction losses )(Hot Water System Recirculation نحصل علي مفاقيد الحرارة في المواسير Eng: Ahmed M.Shuhayb 01021522921 EUC 19 حساب قطر مواسير ال Return هناك أكثر من طريق لحساب قطر ماسورة الراجع Returnمنها -1يكون قطر ماسورة الراجع = Returnنصف قطر مواسير ال Supply Heat losses (Return) = ⅔ Heat losses (Supply) -2 فبالتالي بالطريقة الثانية ممكن الحصول على مفاقيد الحرارة الكلية )Total Heat losses = 5/3 * Heat losses (Supply المطلوب معرفته -1اقطار مواسير الراجع -2قدرة مضخة التدوير كل 10,000 BTU/Hمن ال Heat lossesتستلزم )1 GPM (circulated طريقة اخري للحساب Eng: Ahmed M.Shuhayb 01021522921 EUC 20 حساب قطر مواسير الراجع نفترض ال pressure lossesالكلى في شبكة 30 ft Return ∗ 𝟏𝟎𝟎=……..Ft/ 100Ft )𝒕𝑭 𝟎𝟑( 𝒔𝒆𝒔𝒔𝒐𝑳 𝒆𝒓𝒖𝒔𝒔𝒆𝒓𝑷 ) اكواع مفاقيد 𝑹𝒆𝒕𝒖𝒓𝒏 𝑳𝒆𝒏𝒈𝒉𝒕∗𝟏.𝟏 ( 𝟏𝟎% = Pressure Drop احنا نثبت مفاقيد الضغط على طول الخط -مع حضرتك حاليا مفاقيد الضغط ومعاك GPMتدخل زي البرنس الخريطة تجيب القطر المناسب بعد أما حصلنا الى أقطار Returnندخل الجدول السابق بمعلومية القطر ونحصل على ال Heat losses Heat losses -1الفعلي اللي طلعت من الجدول اقل من او يساوى أو أكبر من اللي انتا فرضته بنسبة %10 يبقي شغلك تمام وغالبا بيكون تمام من اول مرة -2اما بقي لو انت نحس والنسبة طلعت كبيرة هتاخد قيمة Heat lossesالجديدة وتعيد الحسابات تانى من األول مش قولتلك انت نحس وايضا من الممكن استعمال الطريقة االولى وهي بفرض يكون قطر ماسورة = Returnنصف قطر مواسير ال Supply Riserبتاع الراجع = 0.75بوصة مضخة ال circulationبتعمل عند 1450 rpmوليس 2900 rpm يوضع على خط الراجع الداخل للسخانCheck valve – Balance Valve – Gate Valve Eng: Ahmed M.Shuhayb 01021522921 EUC 21 Eng: Ahmed M.Shuhayb 01021522921 EUC 22 Sanitary Drain خطوات حساب اقطار وتصميم مواسير الصرف :DFUحساب Eng: Ahmed M.Shuhayb 01021522921 EUC 23 الختيار الميل المناسب بناء علي قطر الماسورة : للحصول علي قطر الماسورة من خالل معلومتى الميل و:DFU Eng: Ahmed M.Shuhayb 01021522921 EUC 24 : Riser للحصول علي قطر Eng: Ahmed M.Shuhayb 01021522921 EUC 25 ظاهرةHydraulic Jump في حالة ربط صرف الدور األرضي عليه البعد من ربط بعد مسافة 10اضعاف القطر لتجنب الظاهرةالصرف العمومي يسمىBuilding Drain أنظمة الصرف -1صرف باستخدام ماسورتين Waste – Soil Stack -2صرف بماسورة واحدة تجمع بين Waste – Soil Stackوعمل ماسورة تهوية - 3نظام يسمى Single Stackزى النظام السابق ولكن بدون ماسورة تهوية يلزم لعملة شروط – ان تكون األجهزة الصحية قريبة من ماسورة الصرف – كل جهاز يتم صرف على الماسورة مباشر Eng: Ahmed M.Shuhayb 01021522921 EUC 26 Eng: Ahmed M.Shuhayb 01021522921 EUC 27 في حالة وجود بدروم يتم صرف من خاللSubmersiple Pump نقوم بتركيب Sensorاكبر من ارتفاع تشغيل المضخة علشان لو حصل عطل للمضخة تصميم حوض Sump Pump التقل قطرها عن 18بوصة وال يقل ارتفاعها عن 24بوصه نحسب Gpmوفرضا عاوزين نشغلها كل 10دقائق Volume = GPM * Time = ………Gallon Actual Volume = Volume + Pump Volume المسافة بين أي 2مانهول ال تقل عن 30متر 1-Manhole Dim: 80*120*150 - 60*90*120 - 60*60*85 2-Holding Tank عبارة عن خزان يوضع فيها المياه لمدة أيام فرضا 5أيام وبعدها العربية تجي تسحب المياه 2-Septic Tank Method -1 Method -2 )(P – No.People )Q=0.18 X P X 45 (m3 Eng: Ahmed M.Shuhayb 01021522921 EUC 28 ويستخدم في المباني الكبيرة يضاف قيمة جدول 7.1علي قيمة جدول Method -3 7.2 Eng: Ahmed M.Shuhayb 01021522921 EUC 29 بنقسم Septic Tankالي جزئين سعة الجزء األول علي تقل عن 2متر مكعب ال يقل طوله عن 1.5متر وال يقل عمقه عن 1.8متر يوضع بين الجزئين ماسورة 6بوصه سعة الجزء األول ال تقل عن ثلثي الخزان وسعة الجزء الثاني ال تزيد عن ثلث الخزان Grease Interceptor توضع في الحواض لفصل الزيوت والدهون Waste Food Grinder توضع في االحواض لتفتييت بواقى االكل حتى تسهل عملية الصرف Indirect Waste يستخدم في صرف المطابخ التجارية والمصانع الغذائية 1- Air Gap 2- Air Break Eng: Ahmed M.Shuhayb 01021522921 EUC 30 VENTING - تهوية الصرف Individual Vent-1 Eng: Ahmed M.Shuhayb 01021522921 EUC 31 Eng: Ahmed M.Shuhayb 01021522921 EUC 32 Storm Drain -Gutter هو عبارة عن مجمع لمياة المطر -Leader هو الرايزر االساسى للصرف - Horizontal Drainage يفضل عدم ربط صرف المطر مع الصرف العادي بسبب عدم حدوث Flooding GPM = I * C * A شدة المطرI = 4 in/ hr C = 0.9 A= Area Ft2 الميل يراعى ان يكون الفرق بين المنسوبين ال يزيد عن 10الى 15سم Leader Eng: Ahmed M.Shuhayb 01021522921 EUC 33 Eng: Ahmed M.Shuhayb 01021522921 EUC 34 - Horizontal Drainage -Gutter Eng: Ahmed M.Shuhayb 01021522921 EUC 2018 REVIT MEP BY: Eng/ Ahmed M. Shuhayb & Eng/ Ahmed M. Abd-elaal 1 الحمد هلل الذي تتم بنعمته الصالحات أوال الحمد هلل الذي وفقنا للقيام بعمل هذا الكتاب و الفضل موصول للمهندسين م /وائل نسيم م /سماح سلطان م /بالل سويد م /محمد السعيد م /عمر سليم علي ما بذلوه من مجهودات في الكورسات و التجاوب مع األسئلة و لعل هذا الكتاب يكون صدقة علم علي روح المرحوم المهندس /محمد عبدالحميد شهيب نسألكم الدعاء 2 Table of Contents CHAPTER (1) USER INTERFACE ......................................................................................... 3 1.1. INTER FACE ................................................................................................................ 4 1.2. RIBBON & TEMPLATE ................................................................................................. 5 1.3. INSERT LINK REVIT .................................................................................................... 9 CHAPTER (2) TEMPLATES ................................................................................................. 20 2.1. PLAN VIEW .............................................................................................................. 21 2.2. CREATE TEMPLATE .................................................................................................. 28 CHAPTER (3) MODIFY TAB ................................................................................................ 32 3.1. MODIFY .................................................................................................................... 33 3.2. SYSTEM .................................................................................................................... 35 CHAPTER (4) HVAC SYSTEM ............................................................................................ 36 4.1. MECHANICAL SITTINGS ........................................................................................... 37 4.2. ROUTING PREFERENCES........................................................................................... 39 4.3. CREATE DUCT SYSTEM ............................................................................................ 41 4.4. DUCT SIZING ............................................................................................................ 46 4.5. DUCT ACCESSORY ................................................................................................... 53 CHAPTER (5) SHOP DRAWING .......................................................................................... 57 5.1. SHEET....................................................................................................................... 58 5.2. ANNOTATION ........................................................................................................... 61 CHAPTER (6) FIRE PROTECTION ...................................................................................... 67 6.1. CREATE FIRE PROTECTION ...................................................................................... 68 CHAPTER (7) PLUMBING .................................................................................................... 75 7.1. CREATE PLUMBING SYSTEM .................................................................................... 76 CHAPTER (8) SCHEDULES ................................................................................................. 84 8.1. SCHEDULES (QUANTITIES)....................................................................................... 85 CHAPTER (9) WORK SET .................................................................................................... 93 9.1. WORK SET (WORK SHARING) .................................................................................. 94 A 3 CHAPTER 1 User Interface Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 4 A واجهة البرنامج تنقسم لقسمين 1.1. Interface Projects :تستخدم لفتح مشروع و تجهيزه للعمل به سواء كان مشروع موجود مسبقا ً او مشروع جديد. فتح مشروع تم حفظه مسبقا وتريد التعديل علية -Open: فتح مشروع جديد -New: Families :تستخدم لعمل فاميلي و استخدامها في المشروع مثل( مضخة او مخرج هواء او ....الخ) بمواصفات معينة غير موجود فى الفاميلى الموجودة فى البرنامج. وسوف يتم شرحها بالتفصيل فى الجزء الثانى من الكتاب Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 5 1.2. Ribbon& Template optionsللدخول علي خصائص البرنامج نختار تظهر القائمة التالية Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 6 A Ribbon Option Graphic Render File Location User Interface General عدد مرات حفظ المشروع و يُفضل جعلها مرتين General: User Interface: االختصارات التي تضيفها لتسهل عليك التعامل مع البرنامج Keyboard Shortcuts : يستخدم في تحديد لون شريط االظهار في اعلي الشاشة Active theme : تحديد موضع النماذج األساسية في البرنامج و سيتم الحديث عنها بالتفصيل فيما بعد File Location: يستخدم في اخراج الشكل النهائي للمشروع في صورة Render: تستخدم في تحديد لون خلفية المشروع و القطاعات و التحذيرات و خالفهGraphic: Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 7 A File Location من خالله تقوم بإدراج قوالب العمل سواء قالب عمل ميكانيكى أو قالب عمل عمارة او قالب عمل كهربى .... هي قوالب مجهزة للعمل لكل مجال قالب مهيأ له و ذلك لتسهيل تنفيذ المشروع Template : مثال :اذا كان المشروع تكييف و صرف صحي و مكافحة حرائق يفضل استخدام mechanical يشير السهم إلي كيفية إدراج قوالب العمل و تصبح دائما في واجهة البرنامج و مسار االدراج كالتالي C:\Program Files\Autodesk\Revit 2016\RVT 2016\Template. Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 8 و بعد إدراج القوالب سوف تظهر في واجهة البرنامج بصورة دائمة MEP و هذه تقسيمة القوالب الخاصة بمهندس ال Mechanical Electrical Plumbing Engineer 1.2: The Templates of Revit MEP Mechanical Templates HVAC System Templates Plumbing Plumbing HVAC Plumbing Fire Fighting Electrical Fire Fighting Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 9 A 1.3. Insert Link Revit خطوات إدخال مشروع معمارى مرسوم ببرنامج الريفت وتجهيزه لشغلMEP )1اختار القالب المناسب للعمل من القوالب المدرجة على واجهة البرنامج او من خالل قائمة New والدخول فى مسار البرنامج C:\Program Files\Autodesk\Revit 2016\RVT 2016\Template. Note الفرق بين Project & Project template مشروع من الممكن عمل له Project: Worksharing مشروع ال يمكن عمل له Project template: Worksharing Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 10 A -سيتم فتح مشروع البرنامج هتالحظ وجود قائمتين اساسيتين Project Browser – Properties فى حالة اختفاءهم من واجهة البرنامج واظهارهم مرة اخرى من خالل قائمة View User Interface Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 11 A نالحظ قائمة Project Browser مقسمة الى ) Decipline (Mechanical ) Sub Decipline (HVAC-Plumding والتقسيمة دى بناء على القالب اللى اختارته فى بداية المشروع )2لدخول مشروع معمارى -1لو المبنى مرسوم ريفت هتقوم بسحب المشروع Link Revit من مميزات عمل Linkهو مراقبة المشروع المعمارى لو حدث تعديل فى مشروع المعمارى -2لو المبنى مرسوم كاد هتقوم بسحب المشروع Link CAD من مميزات عمل Linkهو مراقبة المشروع المعمارى لو حدث تعديل فى مشروع المعمارى -3لو المبنى مرسوم كاد هتقوم بسحب المشروع Import CAD فى الحالة دى ال يمكن عمل متابعة المشروع المعمارى Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 12 A Insert – Link Revit تقوم بسحب المشروع والبد ان يكون Origin to Origin )3بمجرد فتح المشروع هيكون عبارة عن Linkوضغط عليه وعمل تثبيت ليه Pin Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 13 A )4من قائمة Project Browser نختار الوجهه الجنوبية مثال )(South -Mechهنالحظ وجود مستوياتLevelsخاصة بالمشروع المعمارىال تستطيع تحديدها بشكل فردى علشان المشروع المعمارى Linkتابعة للمشروع المعمارى كله على بعضة 2Level Default-تقدر تحددهم وتمسحهم من اجل تعريف المستويات الخاصة بالمشروع المعمارى و يوجد هناك 2Level Defaultهيحدد معاك المشروع المعمارى بالكامل كما هو موضح فى الصورة و تتشيل الصح من قدام RVTمشكلة لما تكون بتحديد وبالتالى هيكون المستويين بس همه اللى متحددين الحل ببساطة هتضغط على Filter Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 14 A نالحظ ان المستويين تم تحديدهم فقط ونقوم بعمل مسح ليهم Delete Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 15 A Project Browserال يوجد المستويات التى كانت موجودة تحت HVAC - Plumbing نالحظ قائمة حاليا المشروع المعمارى موجود وجاهز لعمل نسخ للمستويات بتاعته ومراقبة تعاله بقى بهدووووء نشوف هنعمل ايه هنضغط Collaborateثم Copy/Mintorونختار Select Linkوبعد كدة نضغط على المشروع على ايقونة Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 16 A هنعمل Copy ومتنساش تضغط صح قدام كلمة Multipleعلشان تقدر تحدد المستويات مرة واحدة هتحدد المستويات عادى جدا بس ممكن تحدد بالغلط حاجات تانية معاها فعلشان تتاكد انت حدد هتالقى مؤشر لل Filterالمستويات وبس finishتضغط على finishاللى تحت مش اللى فوق علشان اللى فوق بتطلع من االمر كله وبعد كدة تضغط ولكن احنا لسه محتاجين بعد النسخ نعمل مراقبه فعلشان كدة هنضغط علىMonitor وبعد عمل النسخ والمراقبة تضغط.Finish المفروض بعد الخطوات دى كلها مستويات المشروع المعمارى تظهر فىProject Browser ولكن مش هتالقيها ظهرت لالسف علشان انت نسخت المستوسات وعملت مراقبة ليها ولكن معملتش ليها اظهار ... Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 17 A عاوز اعمل اظهار لالرضيات فى قائمة المشروع هروح على ايقونة Viewواختار Plan View هختار إظهار Floor Planاالرضيات وتحدد كل المستويات اللى عملتلها نسخ قبل كدة بعد الخطوات السابقة نالحظ ظهور المستويات المعمارية بنفس االسماء المعمارية تحت HVAC Basment-Level1- Level2- Parapet -Roof Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 18 A هنكرر الخطوات تانى الظهار السقف المستعار هروح على ايقونة Viewواختار Plan Viewواختار Reflected Ceiling Plan نكرر الخطوات دى تانى الظهار Reflected Ceiling Planالسقف المستعار بعد الخطوات السابقة نالحظ ظهور المستويات المعمارية بنفس االسماء المعمارية ولكن تحتCoordination Basment-Level1- Level2- Parapet -Roof عاوز اظبط المستويات بحيث يكون مستويات السقف الساقط تحت قائمةHVAC كل اللى هعملة ببسااااااطة هو هروح قايمة Properties وهخلى) Dicipline( Mechanical )Sub Dicipline ( HVAC Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 19 A مبروك انت كدة قدرت تدخل مشروع معمارى مرسوم ريفت واظهار المستويات سواء ارضيات أو سقف مستعار وحاليا جاهز لشغل HVAC طيب انا اعاوز HVAC + Plumbing + Fire اشتغل هتشوف معانا بالتفصيل فى الفصل الثانى للكتاب Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 20 CHAPTER 2 Templates Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 21 A 2.1. Plan View إلدخال المستويات سواء أرضيات اوأو سقف ساقط مرة اخرى لتجهيزها لشغل Plumbing نكرر الخطوات تانى وهى Floor Plan / Reflecting Ceiling Plan Plan View View ولكن هتالقى مشكلة عندك وهى Levelsمش هتكون ظاهرة وكل المشكلة دى هتتحل لو شيلت عالمة صح ملحوظة :نفس الطريقة إلظهار السقف الساقط نالحظ ان المستويات الجديدة مش هتظهر تحت فرع Plumbing أصل البرنامج مش هيشم على ظهر ايدة ويعرف انت عاوز تظهرهم فين علشان كدة كل مرة هتدخل مستويات جديدة هيظهرلك فى مكانHVAC Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 22 A انت بقى هتكون بنقلهم وتحطهم فى المكان اللى حضرتك تحبة طيب ان بقى عاوز انقلهم فى فرع Plumbing تحدد المستويات اللى عاوز تنقلهم و بعد كدة تروح على قائمة Properties )Discipline (Plumbing )Sub Discipline (Plumbing ولكن هنالقى مشكلة انك مش عارف تغيرDecipline /Sub Decipline أول لما تالقى حاجة مقفولة افتكر علي طول تروح على View Template Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 23 انزل تحت فى قائمة الخصائص هتالقى View Template Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 24 A Template من االخر القفل دة معناه اية ؟؟ أنا بعمل قالب بمواصفات معينة اقولة انا عاوز اشوف دة ومشوفش دة عاوزك تسمحلى اعمل كدة ومتسمحليش اعمل كدة يعنى لما االقى Disciplineمش عارف اعدل فيها دة معناه انى عامل قالب وقافل التعديل في الخاصية دى لو عاوز اغير ممكن اعدل فيها عن طريق الضغط على Mechanical Plan Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 25 A Template زى ما شرحنا معنى القفل اية هنالحظ وجود عالقة صح قدام خصائص اى حاجة قدامها صح معناها انها مقفول التعديل فيها ولكن لو عاوز اعدل فيها ممكن اشيل الصح من قدمها Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 26 A بعد لما فتحت القفل عن الخاصيتين دول بالتحديد تالحظ فى قائمة الخصائص اصبح فى امكانك التعديل فيهم وتقدر تغير Discipline (Mechanical ) Plumbing ) Plumbing Sub –Discipline ( HVAC شوية مالحظات : ال يمكن تعديل فى أسماء Disciplineدى األسماء األم يمكن تعديل فى أسماء Sub –Discipline هناك فرق بين) Plumbing (Discipline / Sub –Discipline Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 27 A : Plumbingعلم يشمل اى حاجة فيها مواسير سواء كانت Plumbingبمعنى صرف صحى أوFire Fighting نالحظ ان المستويات تم نقلها فى المكان المناسب وبعد كدة تقدر تدخلهم مرة ثالثة مثال لشغل Fire Fighting وبكدة تم تصنيف الشجرة بتاعتك وتجهيزها للشغل Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 28 A Create Template 2.2. بعد لما تقوم بعمل إدخال األرضيات والسقف الساقط مرة فى مجال HVACومرة فى مجال Plumbing طيب انا استفدت ايه حضرتك كدة ..... التقسيمة دى بتساعدك انك تعمل قالب لكل مجال بالطريقة اللى تحبها يعنى مثال ى مجال األتش فاك تعمل قالب بمواصفات معينة تظهر فيها حاجات معينة وتخفى يها حاجات معينه وهكذا فى مجال البالمنيج وبكدة يتيح ليك الفرصة انك تعرف تصمم كل برانش لواحدة ويكون فى نظام فى الشغل وبعد لما تعمل تصميم للمجاالت كلها تعمل ما يسمى بال Collaborationبيوضح التداخالت فى المجاالت . السؤال بقي دلوقتى إزاى اعمل قالب لكل مجال لوحدة؟؟ أوال لكل مجال انت بتعملة قالبين مش قالب واحد قالب لألرضيات وقالب للسقف الساقط حتى لو كانت مواصفات القالبين زى بعض بس البرنامج نظامة كدة ان قوالب األرضيات مش زى السقف الساقط . أوال: ممكن تعمل قالب بمزاجك وتسمية بمزاجك – وممكن تعمل تعديل على القالب اللى موجود طيب انا اعدل فى الرؤية إزاى يعنى اقول للبرنامج اشوف إيه وأخفى إيه من قائمةProject Browser اضغط على الدور اللى عاوز تعدل فيه الرؤية وبعد كدة تضغط على االختصار VVأو VG أو من خالل Visibility Graphics View ثانيا: بعد لما تتفح ليه قائمة Visibility Graphicsممكن تالقيها متفعلة للتعديل أو مش مفعلة خدها قاعدة معايا من االول كدة علشان ترتاح أول حاجه تفكر فيها لما تالقى حاجة غير مفعلة (مقفولة) يبقى المشكلة فى الغالب Template فى Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 29 A نالحظ ان القالب قافل التعديل فى Visibility Graphicsبمجرد انك تشيل الصح من قدامها تقدر تعدل فى اإلظهار Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 30 A هتالقى هنا كل حاجة ليها عالقة بالرؤية يعنى هنا هتالقى مخارج الهواء و مجارى الهواء وهتالقى المواسير وهتالقى العناصر الكهربية وهتالقى عناصر عمارة ومدنى بمزاجك بقى تظهر ايه وتخفى ايه اى حاجه قدامها صح يعنى بيقولك مسموح تشوفها فى المظهر دة انت بقى بتقسمها بمعنى انت شغال أتش فاك يعنى المواسير ممكن تخفيها فى جزء االتش فاك انت شغال بالمبينج يعنى مخارج ومجارى الهواء ممكن تخفيها ملهاش لزمة تسمح برؤيتها وبعد لما تظبطVG انت كدة ظبط الرؤية فى Level 1وبس أنا بقى بعد لما اظبط الرؤية بتاعت الدور دة هعمل منها قالب وبعد كدة احدد كل االدوار الثانية وهقول للبرنامج خليهم تابعين للقالب دة وبعد لما اخلص األرضيات أكرر اللى عكلته بالظبط بس على السقف الساقط واعمل قالب لالسقف وهكذا بقى فى مجال البالمنيج والفاير .... Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 31 A إختارCreate Template from Current View القالب اللى عملته يفضل انك تشيل الصح من قدام 6خصائص دول الهدف منهم المرونه فقط ..وبعد كدة كل ليفل فى المبنى هتروح قائمة Project Browser View Template )القالب اللى حضرتك عملته( HVAC ASH Floor Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 32 CHAPTER 3 Modify Tab Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 33 A Modify 3.1. المجموعة األولى :دى عبارة عن Details Level (Fine) - Visual Style (Shaded) - Scale المجموعة الثانية :ليها عالقة باخفاء العناصر واظهار العناصر فرضا لو فى مجموعة من العناصر مختفية بقوم بالضغط علىReveal Hidden Element قياس المسافات غلق الشاشات اللى بتتفتح خلف الشاشة الحالية حفظ المشروع لرؤية الخط رفيع او سميك لعمل قطاع فتح مشروع الكتابة للرؤية 3D Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 34 A MODIFY عمل محازاة بضغط على خط اللى عاوز اعمل ليه محازة ثم الخط اللى عاوزة يروح ليه عمل تقسيم لو عندى Duct وعاوز اعمل Sizing عمل تثبيت للمشروع بتحدد مجموعة مع بعض وتضغط على Selection Box بيظهر المجموعة دى 3Dفقط عمل مراية بطريقتين اما باستخدام خط مرسوم مسبقنا او عن طريق رسم خط مستعار القيام بعملية النسخ عن طريق تحديد الشئ المراد نسخه والضغط على نسخ لطق ما تم نسخة فى المكان المحدد سواء فى نفس المستوى أو مستوى اخر يتم تحديدة عمل مسح عمل مد وقص الزيادات يستخدم لتسهيل الرسم عمل تدوير بقوم بالضغط على الجزء اللى عاوز أدورة ثم اضغط على تدوير ثم اضغط على المكان اللى هدوره ثم اتحكم فى زاوية الدوران Eng: Ahmed M. Shuhayb عمل نسخ(تكرار) بقوم بالضغط على الجزء اللى عاوز انسخه ثم اضغط على نسخ ثم اضغط على المكان اللى هنسخ ثم احركه الى المكان المراد نسخه فيه عمل تحريك بقوم بالضغط على الجزء اللى عاوز احركه ثم اضغط على تحريك ثم اضغط على المكان اللى هحرك منه ثم احركه الى المكان المراد نقله لية Eng: Ahmed M. Abd-elaal 35 A System رسم األكواع على المواسير كوع 90او كوع 45 إلدخال أجهزة الصرف الصحى مثال األحواض والبانيو وWC 3.2. رسم Fiitingعلى مجارى الهواء رسم المواسير لرسم مخرج الهواء سواء Difusserاو Grile وتحديد أبعادها رسم مجرى الهواء رسم مجرى الهواء المرن وضع الصمامات و Fittingالمختلفة على خط المواسير لرسم رشاشات الحريق رسم مجرى الهواء على شكل خط ادخال الماكينات زى وحدة التكيف AHU Or FCU رسم الوصالت المرنة للمواسير رسم المواسير عبارة عن خط Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 36 CHAPTER 4 HVAC System Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 37 A 4.1. HVAC- Mechanical Setting هتعمل مجموعة من االعدادت هتعمل اعدادت فى كيفية اظهار االبعاد يعنى مثال لو طول وعرض Ductكتبت هيكتتب ايه جنبه عاوز يكتب قبل البعد وال بعدة Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 38 A هتعمل اعدادت فى رسم Duct يفضل هنا السماح برسم اى زاوية الن مجارى الهواء تصنع فى الموقع فمن الممكن تصنيع اى زاوية على عكس Pipeيفضل جعل الرسم يسمع بزاويا محددة علشان Fittingبتشترها من المنصع Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 39 A 4.2. HVAC- Routing Preferences المقصود هنا هى Fitting لو انت فاتح المشروع من االساس قالب معمارى او مدنى هتالقى Routing Preferencesكلها None وهتقوم بتحميلها من مكتبة البرنامجRVT Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 40 اللى هتشتغل بيها فى المشروعFitting هىRouting Preferences ببساطة فمن االفضل تظبطها فى البداية علشان تتعمل اتوماتك وانت شغال هتحدد انت ناوى تشتغل مقاس اية بالظبط........ Elbow – Cross – Transition Fitting مسار تحميل C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric\Duct\Fitting. : Fitting المسار لتحميل Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 41 A HVAC- Create Duct System 4.3. نروح على قايمة Systemونوزع مخارج الهواء فى المكان اللى محتاج اكيفة فى حالة لو ملقتش مخرج هواء مناسب حسب التصميم بتاعى بدخل Load Family وادخل فى المسار بتاع المكتبة هتالقى مخارج الهواء فى المسار االتى \C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric\Mechanical Air-SideComponents\AirTerminal هتضغط على مخارج الهواء وتروح قائمة الخصائص وتحدد Levelاللى انت عاوزه يتحط عليه Offset -وتحدد ارتفاعة كام من اليفل دة Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 42 هنضغط علىFCUبعد كدة هتدخل ماكينة التكيف ومثال وحدة مناولة هواء Mechanical Equipment Load Family C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric\Mechanical\ Air-SideComponents\TerminalUnit Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 43 A اضغط على أى مخرج هواء -هيظهر ليك كلمة Ductاللى متحددة فى المربع األحمر اول لما تضغط على كلمة Duct هيظهر ليك المستطيل دة اعمل عالمة صح على Open in System Editor Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 44 A هيفتح ليك القايمة دى هتعمل حاجتين 1- Add to System هتضغط على كل مخارج الهواء اللى عاوز تحطهم فىSystem 2- Select Equipment هتضغط على ماكينةFCU بعد لما تعمل Create Duct System هتضغط على أى مخرج هواء من ضمن Systemوتعمل (Tabالزرار دة فى الكيبورد فوق ( Shift هيظهر ليك الشكل الموجود فى الصورة دى هتضغط علىGenerate Layout Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 45 A هتالقى اقتراحات كتير لرسم ) Systemانت هتختار الشكل اللى هيكون فى اقل مشاكل وسهل فى التصميم والتنفيذ ) هيظهر ليك الشكل دة توصيل اتوماتك هتكون محتاج تعمل تعديل فية ابعاد Duct تقدر تضغط علىDuct هتالقى امكانية تغير ابعاد الداكت – امكنية تغير ارتفاع الجاكت من اليفل اللى هو فية ملحوظة : هو البعد اللى انت شايفة فى المسقط قدامك Width هو بعد عمق الداكت اللى مش بيكون ظاهر غير فىHeight 3D Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 46 A HVAC- Duct Sizing 4.4. اضغط على أى حاجة فى Systemبعد كدة اضغط Tabعلشان تحدد المشروع كلة Filterادخل اتاكد ان كل حاجة متحددة اال ماكينة التكيف ومخارج الهواء بعد كدة هتضغط على Duct Pipe Sizing Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 47 Duct Sizing هتحدد طريقة وفى الغالب الطريقة االشهر هتكون Equal Friction Sizing دة شكل التصميم بعد ال Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 48 A هنضغط على الماكينة هنالحظ ان وحدة مناولة الهواء ليها مدخل لمصدر الكهرباء وليها مخرج هواء بار ومدخل هواء راجع ومدخل ومخرج مياة مبردة متوصلة بوحدة الشيلر الطبيعى اننا نعمل خط الراجع هنضغط على Air Terminalوندخل Return Grille لو ملقتش المقاس المناسب او النوع المناسب من الممكن انى ادور علية فى المكتبة او اقوم بتعديل عليها Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 49 A عمل عملية قياس وهضغط على EQعلشان المسافات تكون متساوية نالحظ ان هناك اختالف فى شكل Return & Supply Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 50 : خطوات التعديل على مخرج هواء 12345- Select Diffuser (Grille) Edit Type Duplicate Rename (600*600Face 450*450 Neck) Modify ( Width- Height) ولكن بطريقة مانولDuct System من الممكن رسم Draw Duct ثم اختارRight Click هتضغط على مخرج الهواء وتتحكم فى ابعاد الداكت كمانOffset تقدر وانت شغال تتحكم فى ارتفاع الداكت من خالل Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 51 A بعد لما رسم داكت الراجع بدأت من اول Grilleوبعد كدة عديت على تانى واحدة ولكن متوصلت بالداكت هضغط على Grille ثم اضغط على Connect Into واضغط على الداكت هتتوصل اتوماتك دة شكل شبكة التكيف بعد لما خلصت بشكل سريع هنالقى ان الريفت برنامج بتعامل مع معلومات بيوضحلك خط السبالى بلون ازرق وخط الراجع بلون بنك ومن السهل تغير االلوان ودة هنتعرف عليه قدام فى الكتاب ملحوظه فنية Supply = 4 Diffuser Return = 2 Grille والطبيعى ان لو دخلت اوضة 1000 CFMمحتاج اخدهم على خط الراجع تانى ولكن الحكمة فى التصميم اللى ممكن تكون اخدت بالك منها ان Supply 300*300 Neck Return 450*450 Neck Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 52 A شوية نصايح وانت جاى ترسم شبكة التكيف -خلى بالك انت واقف فىLevelكام . من الممكن الشغل بتاعك ميظهرش هتروح تشوف Visibility Graphicوتتاكد انهم مرئين . -هيحصل مشاكل فى الرسم العالج بتاعها هو .Offset Fitting -من الممكن تعمل خطأ لو كانت المساحة صغير فالزم تراعى دة فى التصميم . Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 53 A HVAC- Duct Accessory 4.5. هتالقى داخل مكتبة البرنامج العديد من Duct Accessoryمثل Damper هتضغط علىDuct Accessory وتروح قائمة الخصائص وتختار النوع المناسب ليك او تحمل من المكتبة Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 54 A كل اللى هتعمله انك هتحط الدامبر فى المكان المناسب الداكت ومن الممكن اضافة جميع انوع Accessory ونراعى المكان المناسب ليهم Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 55 A لوضع العزل الداخلى والخارجى للداكت بمجرد الضغط عليه تظهر االيقونة دى عبارة عن العزل الخارجى Insulation عبارة عن العزل الداخلى Lining هتحكم فى نوع العزل والسمك بتاع العزل Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 56 A هعمل Sectionعلشان اشوف سمك العزل فعال بعد لما ارسم اتجاء السكشن هضغط على رأس المثلث بتاع السكشن هيودينى للصورة التانية دى اللى ظاهر منقط دة هو عبارة عن العزل الداخلى Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 57 CHAPTER 5 Shop Drawing Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb A 58 5.1. Shop drawing- Sheet . وكتابة االبعاد عليها و التفاصيل مثل معدل التدفق والضغوط وخالفة2Dطريقة عمل اللوح View – Sheet طيب لو انا عاوز مقاس لوحة تانى هدخل على مكتبة البرنامجA1 Sheet هتالقى C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric\TitleBlocks Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 59 A هيفتح معايا لوحة بالمقاس اللى حددته ليه (ممكن اعمل تعديالت فى اللوحة واكتب معلومات عن المشروع واسم المهندس المصمم والشركة والمالك والتاريخ واسم اللوحة والعديد من البيانات ودة هالقية على يمين اللوحة) . لو عاوز اعمل لوحة ليفل 1فى مجال االتش فاك مثال (هروح ليفل واحد واسحب الليفل احطه فى الشيت) . هالقى مقاس اليفل معمول بمقياس رسم 1:100 لو عاوز اعدل فى مقياس الرسم هروح لقائمة الخصائص واعدل فى مقياس الرسم ... ولكن فرضا لو لقيت امكانية التعديل في مقياس الرسم مقفولة ارجع للباب التانى من الكتاب وهتعرف ان اى حاجة تالقيها غير مفعلة يبقي المقتاح هتالقية في القالب بتاعها Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 60 View Template View Template هروح من قائمة الخصائص على View Scale واشيل الصح من قدام Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb A 61 5.2. Shop drawing- Annotation مثالDuct أوDiffuser الية بالضبط يعنى مثالTag وهتختار انت عاوز تعملTag All اضغط على Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 62 A عملت (Diffuser – Equipment)Tag انا عاوز المعدات لما اجى اعملها تاج يظهر اسم النظام التابع للماكينة فقوم بالضغط على الماكينة وبعد كدة اعمل Edit Family هيتفتح الصفحة دى اضغط على 1iوبعد كدة اضغط على Edit Label Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 63 اختار انت عاوز بقى لما تجى تعمل تاج يظهر ازاى المثال دة مثال هيظهر Mark – System Classification –Name Load into Project بعد كدة تضغط على Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 64 A بعد لما تعمل Tag Allللعناصر بتاعت المشروع وتحدد االبعاد وكل التفاصيل اللوحة دة لو هتالقيها اتحفظ فى قائمة Project Browserتقدر تروحلها فى الوقت اللى عاوزة Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 65 A تقدر تحفظ اللوحة دىPDF بشرط تحمل ملف بسيط بمجرد تحميلة هو بيدخل جوة برنامج الريفت إسم البرنامج Bull zip PDF Printer خطوات حفظ المشروعPDF Ribbon – Print – Print اضغط Setup Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 66 A ضبط االعدادت كاألتى وبعد كدة احفط الملف فى المكان اللى تحبة وهيفتح معاكPDF Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 67 CHAPTER 6 Fire Protection Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 68 A 6.1. Creating Fire-Protection Systems هى عملية مكافحة الحريق عن طريق توزيع الرشاشات فى المبنى على مسافات محددة لوصول المياه بكمية محددة وضغط محدد.. خطوات رسم الشبكة ببساطة ...ورقة وقلم واكتب ورايا ... )1نقوم بتوزيع الرشاشات فى المبنى على السقف الساقط وذلك بعد معرفة عدد الرشاشات طبقا لكودNFPA خلى بالك بقى من شوية حاجات أن الرشاشات فى منها اللى بيتحط على الجدار وفى اللى بتحط على مستوى انا اللى بحددة وفى رشاش بيتحط على السقف الساقط مباشرة لو محتاج نوع معين من الرشاشات ممكن ادخل على Load Familyواحمل اللى أنا عاوزة الرشاشات فى منها Unhostedومنها Hostedالنوع Hostedمش محتاج احدد Offset Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 69 A الطبيعى ان الرشاشات توضع على بداية السقف الساقط والمواسير بتاعته ارتفاعها اعلى من ارتفاع السقف الساقط بقيمة تقديرية تتناسب مع االكواع اللى هتتعمل للتوصيل بين راس الرشاش والماسورة )2توزيع الرشاشات بشكل منظم طبعا لالكواد Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 70 A ببساطة التكرار اللى انتم شايفينه دة هو عبارة عن رشاش واحد فقط وعملت ليه نسخ راجع الباب الثالث من الكتاب قائمةMODIFY Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 71 A )3اضغط على الرشاش هيظهر قائمةPiping هتعمل نظام مواسير ومتنساش تعمل صح قدامOpen in System Editor ليتيح لك الفرصة الدخال باقى الرشاشات داخل الSystem Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 72 A )4بعد لما حطيت كل الرشاشات داخل نظام واحد هقوم بالضغط على اى رشاش منهم وبعد كدة اضغطTab لغايه لما يتحدد معاك كل الرشاشا زى الصورة الحلوة دى هيظهر ليك Generate Layoutجوها مجموعة من المقترحات اللى تقدر تختار منها شكل الشبكة تقدر تختار من المقترحات دى بمزاجك هتالقى فى منهم اللى يعمل مشاكل فى التوصيالت وفى منه المناسب تقدر تتحكم فى ارتفاع الماسورة االساسية والمواسير الفرعية من أيقونة Setting Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 73 A الطريقة دى هى رسم الشبكة اتوماتيك وطبعا زى ما فى اتوماتك فى مانول زى Duct شكل الشبكة3D طريقة رسم الشبكة مانول ( هترسم ماسورة على ارتفاع مناسب ) وبعد كدة هتضغط على رشاش رشاش وترسم منه ماسورة وتوصلها للماسورة االساسية Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 74 A نالحظ ان Main Pipe – Branch بيكونوا على Offsetاكبر من مستوى الرشاش طبعا هنا الوضع مختلف يفضل فى حالة المواسير طريقة الرسم االتوماتك لالنجاز فى العمل وبعد لما ترسم الشبكة الزم تعمل Sizingللشبكة طبقا للكود من الكود ملهاش عالقة بصميم الريفت دة تابع لكورس الفاير فايتنج Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 75 CHAPTER 7 Plumbing Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 76 A 7.1. Creating Plumbing Systems نظام الصرف الصحى مكون من االتى -1نظام المياة الباردة -2نظام المياة الساخنة -3نظام الصرف للمياة أول خطوة معانا هى ان نتعرف على مكان الحمامات والمطابخ فى المشروع نعمل Tag Room هيظهر لينا اماكن الحمامات والمطابخ Urinal- Bath Tub – Water Closet – Lavatoryهنقوم بعمل فرش للحمام بمعنى ادخال طقم الحمام.. المسار: C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric/Plumbing/MEP Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A Eng: Ahmed M. Abd-elaal 77 Eng: Ahmed M. Shuhayb 78 A يتم توزيع مكونات الحمام فى المكان ونراعى المنطق فى التوزيع يعنى متحطش Water Closetفى وش الباب بعد كدة تشوف االجهزة اللى داخل ليها مياه ساخنة ومياىدة باردة وتحددهم كويس علشان ترسم شبكة المياه الساخنة لوحدها وشكبة المياه الباردة لوحدها هتدخل المشروع خزان مياة باردة وسخان وبعد ادخال كل حاجة ليها عالقة بالمياه ناقص حاجة واحدة فقط ونبدأ نرسم هو تظبيط اعدادات المواسير علشان البرنامج يفرق بين انواع المواسير المختلفة Project Browser – Family – Pipe System Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 79 A هتدخل على كل نظام وتحدد اللون اللى انت عاوزة يظهر بيه وبعد كدة هتعمل ما يسمى ب Filterمن خالل Visibility Graphic أى نظام مياة قدامه عالمة صح هو النظام المسموح له بالرؤية لية بنعمل كدة علشان فى انواع كتير من المواسير بكل نوع بنعملة فلتر علشان يظهر فى المشهد دة وال ال Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 80 A نقوم بوضع الخزان علي Roofونخرج منه ماسورتين ماسورة تكون مصدر مباشر للمياة الباردة للوحدات الصحية والماسورة الثانية تكون مصدر المياة للسخان Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 81 A نقوم بوضح السخان فى الحمام ويكون ليه مدخل مياة بارة ومخرج مياه ساخنة ونخلى بالنا ان السخان بيتم وضعة على offsetمرتفع من سطح االرض ونقوم برسم لكل وحدة صحية خط المياة الباردة والصرف وخط المياة الساخنة ان وجد وبعد كدة هتجمع كل خطوط المياة الباردة على ماسورة واحدة وربطها بالماسورة اللى جاية من التانك من الممكن أو من المأكد ان هيقابلك مشاكل فى التوصيل زى ان ارتفاع ماسورة Bath Tubمختلف عن ارتفاع ماسورة Urinalحل المشكلة دى ببساطة انك هترسم الماسورة بتاعت Urinalوقبل لما توصلها ب Bath Tubاعرف ارتفاع ماسورة Bath Tubوارسم من نهاية ماسورة Urinalماسورة بنفس االرتفاع بتاع Bath Tubعلشان نعرف نوصلهم كلهم ببعض وهكذا بباقى النظام هتالحظ أن المواسير هتالقيها طالعة نازلة فى الجدار Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 82 A من النصائح المهمة للرسم أنك الزم تعمل سكشن أفقى ورأسي علشان نعرف نرسم المواسير المختلفة زى المشهد دة مثال فاالفضل نرسم في السكاشن Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 83 A نالحظ توصيل الشبكة المياة الباردة والساخنة ومتبقى الصرف من األشياء اللى قررت اعملها غلط علشان تنتبة ليها هو وجود WCبيكون قريب من المساقط(المناور) علشان ماسورة الصرف بتاعه بتكون كبيرة هندخل للمشروع Sinkبالعة يعنى هنجمع صرف االحواض والبانيو والمبولة فى البالعة دى وصرف WCلوحدة متنساش مواسير الصرف بيتعملها Slope Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 84 CHAPTER 8 Schedules Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 85 A 8.1. Schedules بعد لما المشروع خلصناه محتاجين نعمل حصل للكميات وللتكاليف ودى من قوة برنامج الريفت زمان قبل ظهور الريفت كان عملت الحصر بتم مانول دلوقتى أقدر اقولك انت بضغطة زرار هتعمل جدول بأى حاجة فى المشروع اختار نوع الجدول اللى عاوز تعملة علشان المشروع بتاعك فيه حاجات كتير جدا وليكن هنختار Duct Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 86 A هنختار احنا عاوزين الجدول يكون فية معلومات ايه هتالقى عندك Available fieldsهتضغط على الحاجة اللى عاوزها تظهر فى الجدول وتعملها Add Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 87 A الجدول ظهر بالمنظر دة من غير أى تنظيم ..احنا بقى مع بعض هنظم الجدول دة علشان يكون شكلة محترم هنروح على قائمة الخصائص ونضغط على Edit Sorting/Grouping بيقولك هنا يانجم النجوم انت عاوز تقسم الجدول طبقا الية مثال انا هقولك طبقا Widthهو بقى هيرتب كدة الجدول حسب العرض اما تنازلى او تصاعدى حسب اختيارى Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 88 A فى اختيار تحت اسمة Grand Totalsدة بيعمل جمع للعناصر علشان يعرفنى مثال انا عندى كام Duct عندى مثال كام Diffuser هتالقى تحت مكتوب Itemize every instanceلو لقيت محطوط جنبها عالمة صح هتالقى الجدول معروض بشكل كبير بمعنى لو عندى 10 Diffuserمن نفس المقاس ونفس كل حاجه هتالقيهم مكتوبين فى 10سطور ومكتوب الكمية من كل Diffuserواحد فقط أما لو شيلت الصح هيعمل الجدول مدموج يعنى هيكتب سطر واحد مكتوب فيه مقاس Diffuserوعددهم 10 Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 89 A نالحظ أن الجدول بقى منظرة منظم اى مقاس Ductليهم نفس Width نالحظ ان قدام Headerيوضع عالمة صح طيب دى لزمتها ايه ؟ هتالقى مكتوب مثال ) (350وتحتها الكمية والتفاصيل وهكذا مع ( ...)450الخ نالحظ لو سيبنا الصح قدام Itemize every instance الجدول هتالقية كبير على الفاضى وكاتب قدام كل حاجه الكمية 1حتى لو فى زيها 100 علشان كدة يفضل انك تشيل الصح علشان الجدول يكون مختصر ومنظم Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 90 A لو ضغطت من قائمة الخصائص على Edit Filter لو عاوز اظهر حاجة محددة فقط فهنا مثال ظهرت كل Ductsاللى Widthيساوى 350 لو أنا عاوز اعمل تميز لمقاسات محددة مثال من خالل الضغط على Formatting وحدد انت هتميز مثال Widthواضغط على Conditional Formatting واعمل العالقة اللى هتحدد بيها واختار اللون ونالحظ ان انا قولت للبرنامج Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 91 A أى Widthمقاسه من مقاسه من 350 to 400يكون متلون باللون األحمر نالحظ فى الصفحة السابقة أن ابعاد ال Ductكانت بتكتب من غير وحدة قياس يعنى مش عارف cm / mm من خالل Formatهتحدد نوع الوحدة وكمان هتظهر ازاى وبكدة انت عملت الجدول وتقدر الرجوع لية باستمرار من خالل قائمة Project Browser Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 92 A هتالقى هناك كل الجداول اللى عملتها فى البرنامج نالحظ وجود جدولين جدول Air Terminal وجدول Duct Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal A 93 CHAPTER 9 Work Set Eng: Ahmed M. Abd-elaal Eng: Ahmed M. Shuhayb 94 A 9.1. Work Sets من قوة برنامج الريفت انة بيتيح المناخ المناسب لعمل مجموعة من المهندسين على Central File كل مهندس ياخد من الملف المركزى نسخة تسمى ب Local File الميزة دى بتساعد ان كل مهندسى المشروع بيكونوا شايفين بعض وشغالين مع بعض ومفيش حد يقدر يحرك حاجه مش بتاعته اال بطلب من صاحبها الما يوافق او يرفض تخيل بقى زمان ايام االتوكاد كان كل واحد شغال لوحدة فى وادى وفى االخر يجو يتشاكلوا مع بعض اما دلوقتى الوضع مختف فى Coordination إعمل عدد ال نهائى من Work Set : Editadleمعناها هل Work Setدى ملكك والال نالحظ علشان انا اللى عمال كل Work Setعلشان كدة كلهم ملكى : Ownerدة إسم المستخدم :Borrowers -دة إسم الشخص اللى بيطلب تعديل على Work Setبتاعتك بعد كدة اعمل حفظ للملف المركزى دة وهيكون Central File Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 95 A وبعد كدة اعمل Relinquish All Mineدة معناها ان انا تنازلت عن ملكيتى لكل Work Set :Synchronizeدة حاجة زى Saveبالظبط ولكل بتعمل حفظ فى الملف المركزى وكل الناس اللى شغال فى المشروع هتشوف اخر التعديالت :Editing Requestsفى حاجه لوحد طلب منك انك تسمحلة بالتعديل فى حاجة بتاعتك الما تقبل الما ترفض دة شكل طلب التعديل Grantيعنى موافق Denyيعنى رافض لما اجى افتح المشروع علشان اشتغل فيه هفتحة كنسخة Local Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 96 A بعد كدة هفتح المشروع وهروح على : Work Set Collaborate واختار Work Setاللى انت عاوز تمتلكها متنساش تعمل Synchronize فى بعض االحيان بكون محتاج أفصل النسخة بتاعتى عن Central File من خالل Detach From Central Eng: Ahmed M. Shuhayb Eng: Ahmed M. Abd-elaal 97 A حاجة مهمة جدا لو ملف المعمارى اللى أنت سحبه اتغير مكانة كل اللى هتعملة االتى : من قائمة Manageونختار Manage Links اضغط على اللينك وبعد كدة تعمل Reload Fromوتروح للمسار الجديد تم بحمد هللا تعالى االنتهاء من كتاب ريفت ميب بالعربى ونتمنى من هللا عز وجل التوفيق لنا ولألمة العربية ترقبوا بمشيئة هللا الجزء الثانى من كتاب ريفت ميب بالعربى هنشرح فية مشروع كامل وهنشرح فية الجزء الخاص بعمل Family Mail: ahmedshuhayb6@gmail.com Phone: 01021522921 Eng: Ahmed M. Shuhayb Eng: Ahmed Shuhayb BIM Engineer Eng: Ahmed M. Abd-elaal NAVISWORKS Navisworks برنامج النافس وركس يستخدم في تكنولوجيا BIMويستطيع عمل البعد الرابع وهو الزمن والبعد الخامس هو حصر الكميات و التكلفة باإلضافة الى عمل انميشن للمشروع وحل كل التعارضات بصورة اقوي من برنامج الريفت NWDمساحتها صغيرة يحتوي على النموذج modelمع review markupsبمثابة لقطة للوضع الحالي يمكن وضع كلمة سر ,ال يحتاج الملفات االساسية ,حجمه اكبر ,مستقل بذاته يمكن اعطائه وقت صالحية و بعد فتره ال يفتح NWFيحتوي على وصالت لملفات المشروع ,فضال عن review markups .ال يوجد نموذج بداخله يتم حفظ geometryمع ، NWFمما يؤدي إلى حجم ملف أصغر منNWD NWCملف ذاكرة التخزين المؤقت التي تم إنشاؤها عند التصدير من برنامج الريفت احفظ الملف بامتدادNWF عند تنفيذ المهام مثل عمل محاكاة قم بعمل حفظ بأسم و احفظ بامتدادNWD عن تسطيب البرنامج ينزل تلت ايقونات للنافس Autodesk navisworks manage بيعمل كل حاجة (عشان كدة ده األساسي عندنا ) Autodesk navisworks simulate بيعمل محاكاة و ال يمكنه حل التعارض Autodesk navisworks freedomللرؤية فقط و مجاني EUC Eng- Ahmed M.Shuhayb 01021522921 عند تنصب ال Navisworksستجد ان لديك اضافه بالريفيت و ذلك في ال addins navisworksللتصدير لبرنامج النافيسوركس navisworks 2019عندما تريد تعديل ما قمت بتصديره ,يقوم بعمل مزامنة مع ملف النافيسوركس االن دعنا نمرح قليال و نختار NAVISWORKS االن ما رأيك أن نضغط معا على navisworks settings كال لن تجد بابا نويل بل اعدادات التصدير للنافيسورك ,ظننت هذا واضحا EUC Eng- Ahmed M.Shuhayb 01021522921 االختيارات واضحه و االختار االهم EXPORT ENTIRE PROJECTالمشروع كامال CURRENT VIEWالفيو الحالي SELECTIONالجزء المحدد فقطذ CONVERT LINKED FILESهل يتم تحويل الملفات المرتبطة ايضا و االفضل ان نصدر كل ملف مستقل عن االخر التصدير يكون المتداد NWC االن دعنا ننتقل من الريفت الى النافيسوركس و نستدعي الملف من APPENDسنختار APPENDاول مره قديأخذ وقت ,يفضل السحب على اجزاء لو امكانية الجهاز ضعيفة MERGEلو اردت ملفين في نفس المكان EUC Eng- Ahmed M.Shuhayb 01021522921 هناك انواع عديدة من الملفات يمكنك التعامل معها و استيرادها EUC Eng- Ahmed M.Shuhayb 01021522921 SELECTION TREE االن ننشط الخيار SELECTION TREEلتظهر لنا النافذة التى تسهل علينا اختيار العناصر ,و الننا قمنا باالستيراد من الريفت فستجد المشروع كله منظم و مرتب تجد في الصورة SELECT ALLطبعا دي لتحديد الجميع يمكنك تحديد العناصر بدقة من Find Items EUC Eng- Ahmed M.Shuhayb 01021522921 و يمكننا اظهار و اخفاء العناصر من عندما تحدد عنصر تظهر لك تاب جديدة SWITHBACKاستدعاء العنصر من ملف الريفيت بأخر التعديالت FOCUS IN ITEMالتركيز على العنصر ZOOMعمل زوووم HIDEاخفاء & TRANSPARENCYدرحة الشفافية REST APPEARANCE اعادة العنصر لخصائصة االولية ADD LINKاضافة لينك & EDIT LINKالتعديل عليه RESETLINKSاعادته الصله Viewpointستجد اختيار Enable Sectioningسيجعلك تاخذ SECTIONفي الشكل يمكنك من MODEاختيار هل سيكون مكعب او قطاع و يمكننا من خالل MOVEتحريك السكشن ROTATEاو لفه SCALEاو تغير حجمة EUC Eng- Ahmed M.Shuhayb 01021522921 HOME LINKSاظهار الوصالت ,لتضغط عليها لتري الملف المرتبط بالعنصر QUICK PROPERTIES PROPERTIES خصائص بسيطة و مختصرة قائمة الخصائص و يمكننا تخصيصه من الOPTION من قائمة الخصائص يمكننا اضافه خاصية جديدة EUC Eng- Ahmed M.Shuhayb 01021522921 لو اردت رؤية او اخفاء االكسات عليك بالذهاب الى VIEWو منها الى SHOW GRID كما يمكنك تحديد رؤيتها في اي دور ستجد لديك FULL SCREENلرؤية كامل العمل بدون اي اشياء مشتته حسنا لو اردت الرجوع يمكنك ان تضغط F11 SPLIT VIEWلجعل لديك شاشتين ,اما راسيين او أفقيين يمكننا من HUDاظهار EUC Eng- Ahmed M.Shuhayb 01021522921 VIEWPOINT يمكننا اخذ SAVE VIEWPOINT تظهر لنا نافذة يمكننا اخذ اكثر من صورة ,من اكثر من جهه االن نضغط بالزر االيمن للماوس و نختار من القائمة المنبثقة ADD ANIMATION االن قم بسحب كل اللقطات الى مجلد االنيماشن الذي انشئته منذ ثوان يمكنم اضافة add cutلتوقيف المششهد لثواني تمام االن من VIEWPOINTقم بتشغيل الفيديو EUC Eng- Ahmed M.Shuhayb 01021522921 REVIEW يمكنك وضع بعض الكلمات و العالمات من قائمة VIEWPOINTيمكننا اختيار هل تريد ان تري المبني ORTHOGRAPHICهندسي ال فرق بين اي ضلع اقرب للكاميرا PRESPACTIVEكما في الحقيقية ,حيث يكون االقرب هو االكبر يمكننا اضافة شخص ظريف الى المبني من خالل اختيار REALISM يسير على االرض GRAVITY ال يعبر الحوائط COLLISON و االختيار بين الطيران و المشي FLY - WALK LOOK AROUNDلف حول العنصر LOOK ATاالنتقال الى العنصر FOCUSتركيز الرؤية على نقطة EUC Eng- Ahmed M.Shuhayb 01021522921 SET تساعدنا في تحديد مجموعة عناصر و اعطائها اسم محدد يمكننا من خالل هذا االسم التحكم فيها من HOMEستجد SETSو من السهم الصغير ستجد MANAGE SET االن يمكننا انشاء تحديد لمجموعة من العناصر من SELECTION TREEثم انشاء اسم لهم في SET EUC Eng- Ahmed M.Shuhayb 01021522921 Time Liner add task يمكننا اضافه مهمه جديدة ms project , primaveraلربط نموذج الريفت بملف المشروع الزمني مثل add نختارdata sources و منtime line نذهب ل EUC Eng- Ahmed M.Shuhayb 01021522921 في التايم الين نحددtask type Constructفي مرحلة البناء Demolishمرحلة الهدم Temporaryمؤقتة من tasksنجد خاصية مهمة auto attach using rules يمكنك عمل قاعدة لربط المهام بالعناصر مثال ربط المهام بالعناصر التى في SETبنفس االسم EUC Eng- Ahmed M.Shuhayb 01021522921 نضغط على settings لنحدد متى تبدأ و تنتهي المحاكاه عمل ال RENDER الريندر في النافيس يعتمد على البريسيسور او المعالج EUC Eng- Ahmed M.Shuhayb 01021522921 Clash Detective من HOMEنختار نختار add testو نحدد العناصر التى سنعمل على اساسها اكتشاف التعارض Hardداخلين في بعض Clearanceالمسافة الى بينهم Duplicateتكرار EUC Eng- Ahmed M.Shuhayb 01021522921 االن نذهب الى التقرير Report typeهل تريد تقرير عن المشاكل بقاعدة الكشف الحالية ام الجميع currentالحالي all compجميع التقارير متداخلين all sepratكل التقارير و لكل كل تقرير مستقل بذاته Report formatنزع التقرير هل هو ملف نت ام xml write reportاضغط هنا للتصدير التصدير يمكن من هنا الطباعة و تصدير الصور و الفيديو للتصدير الى الماكس نختار التصديير الى fbx EUC Eng- Ahmed M.Shuhayb 01021522921 Quantification هو عمل حصر للكميات الموجودة للمشروع تضغط علي Project Setupوتختار الكتالوج المناسب ليك EUC Eng- Ahmed M.Shuhayb 01021522921 هتالقي تقسيمة الكتالوج لعمل حصر لحاجة معينة EUC Eng- Ahmed M.Shuhayb 01021522921 لعمل حصر للمشروع كلة لعمل تصدير للحصر لشيت اكسيل EUC Eng- Ahmed M.Shuhayb 01021522921 استرجاع ملف نافيس وركس ضرب Automatically Save and Recover Autodesk Navisworks Files النافيس وركس مثل الكاد يحتفظ بملفات باك احتياطية في مجاد على الويندوز بهذا الشكل .AutoSave و عندما يقف بصورة غير متوقعة نتيجة قطع كهرباء مثال ثم اعادة فتحة تظهر لك رسالة و يمكنك تغير المسار من من Option EUC Eng- Ahmed M.Shuhayb 01021522921 ENGINEERS UNION أشهراالختصارات AutoCAD رسم الخط المستقيم بمعلومية نقطتين لرسم خط مزدوج متوازيين لعمل تعديالت على الخط المزدوج لرسم دائرة لرسم مستطيل عمل قطع ومسح لألجزاء الزيادة عمل تكملة لألشكال الهندسية عمل نسخ عمل نسخ متطابق عمل تدوير لألشكال عمل كسر سوكه احرف ملساء عمل كسر سوكه على زاوية عمل بلوك لألشكال عمل تفجير للبلوكات عمل تحريك عمل تهشير عمل نسخ للخصائص عمل استطالة وتقصير لألشياء لرسم االقواس لعمل تكرار على مستقيم او مسار دائري عمل مسح عمل تعديل على االبعاد لمعرفة احداثيات لقياس االبعاد عمل االبعاد كلها من نقطه مرجعية عمل كسر لالبعاد على خطوط الرسمة تكملة كتابه االبعاد بسرعة جعل المسافات متساوية بين االبعاد كتابة االبعاد بسرعة تحويلLine To Polyline عمل ادخال للبلوكات لعمل اسهم كتابة النصوص L+ Enter Ml+ Enter Mlst+ Enter C+ Enter Rec+ Enter Tr+ Enter Ex+ Enter Co+ Enter Mi+ Enter Ro+ Enter F+ Enter Cha+ Enter B+ Enter X+ Enter M+ Enter H+ Enter Matc+ Enter Str+ Enter A+ Enter Ar+ Enter E+ Enter D+ Enter Di+ Enter Dim+ Enter Dimb+ Enter Dimbr+ Enter Dco+ Enter DimS+ Enter Q+ Enter Pe+ Enter Ins+ Enter Lead+ Enter Text+ Enter Line Mline Mline Style Circle Rectangle Trim Extend Copy Mirror Rotate Fillet Chamfer Block Explode Move Hatch Match Stretch Arc Array Erase DimStyle Distance Dimension DimBase DimBreak DimContinue DimSpace QDim PEDIT Insert Leader Text ENGINEERS UNION عمل جدول لعمل طبقات العمل لعمل حصر البلوكات ولكن مؤقت عمل تقسم مسافات متساوية األشكال الهندسية لإلظهار عالمات التقسم لالنتقال من لوحة الطباعة الى مساحة العمل لالنتقال من مساحة العمل الى لوحة الطباعة مساحة لوحة الطباعة عمل إخفاء وهمى يعطى قيمة 0لإلخفاء للوصول الى االلة الحاسبة للوصول الى قائمة الخصائص االجبار على رسم فيX,Y الرسم على زوايا معلومة يعطى إشارة عند الوصول الى أماكن معينه لتفعيل واخفاء الشبكة Table+ Enter La+ Enter Bco+ Enter Di+ Enter Table Layer Bcount Divide Pd+ Enter DDP+ Enter MS+ Enter PS+ Enter ViewPo+ Enter Wi+ Enter Wipeout F+ Enter QC+ Enter Pro+ Enter F8 F10 F3 F7 PDMODE DDP Type Model Space Paper Space Viewports Wipeout Wipeout Frame Quick Calculation Properties Ortho Polar Snap Grind أشهراإلضافات عمل حصر لبلوكات المشروع في جدول تصدير الجدول من االتوكاد الى االكسيل لحصر االطوال لكتابة االبعاد اتوماتيك لرسم الداكت والمسلوب واالكواع لعملTake off Count+ Enter TE+ Enter LPL+ Enter Ad+ Enter Duct+ Enter BD+ Enter Count TE LPL AD Duct Duct Branch