الفهرس
EUC BOOK
STEPS FOR COOLING AND HEATING LOAD
CALCULATION MANUAL
2
MEP CODE
50
HVAC Design
51
Firefighting Design
Navisworks
77
107
141
239
AutoCAD
259
Plumbing Design
Revit MEP
Eng: Ahmed M.Shuhayb
Phone: 01021522921
E-mail: ahmedshuhayb6@gmail.com
Facebook: Ahmed Shuhayb
Engineers Union Company
EUC
MEP BIM Developers
MBD
STEPS FOR COOLING AND
HEATING LOAD CALCULATION
MANUAL
I'M 5A TEAM
9/25/2017
AHMED ABD-ELAAL
AHMED SHUHAYB
MOSTAFA ADEL
AHMED EL-ZAWAWY
ABEER ZIDAN
AHMED EL-ZAGHAL
IBRAHEM KANDIL
Table of Contents
OUT DOOR..................................................................................................................................1
WALL .......................................................................................................................................1
GLASS.. ................................................................................................................................6
SOLAR GLASS.. ....................................................................................................................8
IN DOOR ...................................................................................................................................22
LIGHTING ..............................................................................................................................22
PEOPLE ..................................................................................................................................28
MISCELLANEOUS ..................................................................................................................29
POWER EQUIPMENT.............................................................................................................33
PARTITION ............................................................................................................................35
OTHERS .....................................................................................................................................36
VENTILATION ........................................................................................................................36
INFILTERATION .....................................................................................................................39
FINALLY.....................................................................................................................................40
PSYCHROMETRIC CHART.......................................................................................................46
Out Door
𝑸 = 𝑼 × 𝑨 × 𝑪𝑳𝑻𝑫
For getting “U”
From Table 1.1.1
1
BY : AHMED MOHAMED ABD-ELAAL
1
Or get “R” then “𝑈 = 𝑅 ”
From Table 1.1.2
2
BY : AHMED MOHAMED ABD-ELAAL
For getting “CLTD”
For roof Table 1.1.3
3
BY : AHMED MOHAMED ABD-ELAAL
For wall Table 1.1.4
4
BY : AHMED MOHAMED ABD-ELAAL
For CLTD correction
𝐶𝐿𝑇𝐷 = (𝐶𝐿𝑇𝐷 + 𝐿𝑀) × 𝐾 + (78 − 𝑇𝑅 ) + (𝑇𝑜 − 85)
For getting “LM”
𝐾=1
𝑇ℎ𝑒 𝑣𝑎𝑙𝑢𝑒 𝑜𝑓 𝐾 { 𝐾 = 0.83
𝐾 = 0.56
For roof Table 1.1.5
5
@𝐷𝑎𝑟𝑘
@𝑀𝑒𝑑𝑖𝑢𝑚
@𝐿𝑖𝑔ℎ𝑡
BY : AHMED MOHAMED ABD-ELAAL
Glass
𝑄 = 𝑈 × 𝐴 × ∆𝑇
For getting “U”
From Table 1.2.1
OR From Table 1.2.2
OR From Table 1.2.3
6
BY : AHMED MOHAMED ABD-ELAAL
OR From Table 1.2.4
OR From Table 1.2.5 OVER-ALL FACTORS FOR SOLAR HEAT GAIN THRU GLASS
WITH AND WITHOUT SHADING DEVICES*
Outdoor wind velocity, 5 mph-Angle of incidence, 30 – Shading devices fully covering
window
GLASS
FACTOR
NO
SHADE
ORDINARY GLASS
REGULAR PLATE (1/4 inch)
HEAT ABSORBING GLASS††
40 to 48% Absorbing
48 to 56% Absorbing
56 to 70% Absorbing
DOUBLE PANE
Ordinary Glass
Regular Plate
48 to 56% Absorbing outside;
Ordinary Glass inside.
48 to 56% Absorbing outside;
Regular Plate inside.
TRIPLE PANE
Ordinary Glass
Regular Plate
PAINTED GLASS
Light Color
Medium Color
Dark Color
STAINED GLASS‡‡
Amber Color
Dark Red
Dark Blue
Dark Green
Greyed Green
Light Opalescent
Dark Opalescent
INSIDE
VENETIAL BLIND*
45° horiz. or vertical
or ROLLER SHADE
Light Medium Dark
Color Color Color
OUTSIDE
OUTSIDE
SHADING
VENETIAN BLIND
SCREEN†
45° horiz. slats
17° horiz. slats
Light on
Light Outside Medium** Dark§
Color Dark on Color Color
Inside
.15
.13
.22
.15
.14
.12
.21
.14
OUTSIDE
AWNING‡
vent. sides & top
Light Med. or
Color Dark
Color
.20
.25
.19
.24
1.00
.94
.56
.56
.65
.65
.75
.74
.80
.73
.62
.56
.53
.51
.62
.59
.54
.72
.62
.56
.12
.11
.10
.11
.10
.10
.18
.16
.14
.12
.11
.10
.16
.15
.12
.20
.18
.16
.90
.80
.52
.54
.52
.36
.61
.59
.39
.67
.65
.43
.14
.12
.10
.12
.11
.10
.20
.18
.11
.14
.12
.10
.18
.16
.10
.22
.20
.13
.50
.36
.39
.43
.10
.10
.11
.10
.10
.12
.83
.69
.48
.47
.56
.52
.64
.57
.12
.10
.11
.10
.18
.15
.12
.10
.16
.14
.20
.17
.28
.39
.50
.70
.56
.60
.32
.46
.43
.37
7
BY : AHMED MOHAMED ABD-ELAAL
Solar glass
𝑄 = 𝐴 × SHGF × 𝑆𝐶 × 𝐶𝐿𝐹
For getting “SHGF”
From Table 1.2.6
8
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.6
9
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.6
10
BY : AHMED MOHAMED ABD-ELAAL
For getting “CLF”
From Table 1.2.7
11
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.8
12
BY : AHMED MOHAMED ABD-ELAAL
For getting “SC”
From Table 1.2.9
From Table 1.2.10
13
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.11
From Table 1.2.12
14
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.13
From Table 1.2.14
15
BY : AHMED MOHAMED ABD-ELAAL
For getting “SHGF × CLF = SHG”
From Table 1.2.15
16
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.15
17
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.15
18
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.15
19
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.15
20
BY : AHMED MOHAMED ABD-ELAAL
From Table 1.2.15
21
BY : AHMED MOHAMED ABD-ELAAL
IN Door
Light
𝑄 = 3.41 × 𝑞 × 𝐹𝑎 × 𝐹𝑆 × 𝐴 × 𝐶𝐿𝐹
𝐴 → 𝑓𝑡 2
For 𝑔𝑒𝑡𝑡𝑖𝑛𝑔 𝐹𝑎
𝐹𝑎 ≅ 0.75 ∶ 1
𝐼𝑓 𝑤𝑒 ℎ𝑎𝑣𝑒 12 𝑙𝑎𝑚𝑏𝑠 𝑎𝑛𝑑 𝑤𝑒 𝑢𝑠𝑒 8 𝑙𝑎𝑚𝑏𝑠 𝑜𝑛𝑙𝑦
For 𝑔𝑒𝑡𝑡𝑖𝑛𝑔 𝐹𝑆
𝐹𝑠 ≅ 1 ∶ 1.25
∴ 𝐹𝑎 =
8
12
= 0.75
𝐹𝑜𝑟 𝐿𝐸𝐷 𝐹𝑠 = 0.7
From Table 2.1.1
22
BY : AHMED MOHAMED ABD-ELAAL
For getting “CLF” By 3 steps
1)
From Table 2.1.2
2)
From Table 2.1.3
23
BY : AHMED MOHAMED ABD-ELAAL
3)
From Table 2.1.4A
From Table 2.1.4B
24
BY : AHMED MOHAMED ABD-ELAAL
From Table 2.1.4C
From Table 2.1.4D
From Table 2.1.4E
25
BY : AHMED MOHAMED ABD-ELAAL
For getting
𝒒 → 𝑾⁄ 𝟐
𝒇𝒕
TABLE 2.1.5 Lighting Power Densities Using
the Space-by-Space Method (continued)
TABLE 2.1.5 Lighting Power Densities Using
the Space-by-Space Method
Common Space Typesa
LPD, W/ft2
RCR
Threshold
Building-Specific
Space Types
Atrium
LPD, W/ft2
RCR
Threshold
Audience Seating
0.82
4
Exhibit Space
1.45
4
Courtroom
1.72
6
Confinement Cells
1.10
6
Judges’ Chambers
1.17
8
Penitentiary Audience Seating
0.43
4
Penitentiary Classroom
1.34
4
Penitentiary Dining
1.07
6
0.38
8
Engine Room
0.56
4
Sleeping Quarters
0.25
6
0.03 per ft
(height)
NA
0.02 per ft
(height)
NA
For auditorium
0.79
6
For Performing Arts Theater
2.43
8
For Motion Picture Theater
1.14
4
Classroom/Lecture/Training
1.24
4
Conference/Meeting/Multipurpose
1.23
6
Corridor/Transition
0.66
Width<8 ft
Dining Area
0.65
4
For Bar Lounge/Leisure Dining
1.31
4
For Family Dining
0.89
4
Dressing/Fitting Room for Performing Arts Theater
0.40
6
Fitness Area
0.72
4
Electrical/Mechanical
0.95
6
Gymnasium Audience Seating
0.43
6
Food Preparation
0.99
6
Playing Area
1.20
4
First 40 ft in height
Height above 40 ft
Courthouse/Police Station/Penitentiary
Audience/Seating Area—Permanent
Dormitory
Living Quarters
Fire Stations
Gymnasium/Fitness Center
Hospital
Laboratory
For Classrooms
1.28
6
Corridor/Transition
0.89
Width < 8 ft
For Medical/Industrial/Research
1.81
6
Emergency
2.26
6
0.90
4
Exam/Treatment
1.66
8
0.60
4
Lobby
For Elevator
0.64
6
Laundry/Washing
For Performing Arts Theater
2.00
6
Lounge/Recreation
1.07
6
For Motion Picture Theater
0.52
4
Medical Supply
1.27
6
0.75
6
Nursery
0.88
6
4
Nurses’ Station
0.87
6
Operating Room
1.89
6
0.62
6
Locker Room
Lounge/Recreation
0.73
Office
Enclosed
1.11
8
Patient Room
Open Plan
0.98
4
Pharmacy
1.14
6
Physical Therapy
0.91
6
Radiology/Imaging
1.32
6
Recovery
1.15
6
Restrooms
0.98
8
Sales Area (for accent lighting,
see Section 9.6.2(b))
1.68
6
Stairway
0.69
10
Hotel/Highway Lodging
Storage
0.63
6
Hotel Dining
0.82
4
Workshop
1.59
6
Hotel Guest Rooms
1.11
6
LPD, W/ft2
RCR
Threshold
Hotel Lobby
1.06
4
Highway Lodging Dining
0.88
4
Highway Lodging Guest Rooms
0.75
6
Card File and Cataloging
0.72
4
Reading Area
0.93
4
Stacks
1.71
4
Building-Specific
Space Types
Automotive
Service/Repair
0.67
4
1.38
6
Library
Bank/Office
Banking Activity Area
Convention Center
26
BY : AHMED MOHAMED ABD-ELAAL
TABLE 2.1.5 Lighting Power Densities Using
the Space-by-Space Method (continued)
Building-Specific
Space Types
LPD, W/ft2
TABLE 2.1.5 Lighting Power Densities Using
the Space-by-Space Method (continued)
Building-Specific
Space Types
LPD, W/ft2
RCR
Threshold
Dressing/Fitting Room
0.87
8
RCR
Threshold
Retail
Manufacturing
Corridor/Transition
0.41
Width < 8 ft
Detailed Manufacturing
1.29
4
Mall Concourse
1.10
4
Equipment Room
0.95
6
Sales Area (for accent lighting,
see Section 9.6.3(c))
1.68
6
Extra High Bay
(>50 ft Floor to Ceiling Height)
1.05
4
High Bay
(25–50 ft Floor to Ceiling
Height)
Audience Seating
0.43
4
1.23
4
Court Sports Arena—Class 4
0.72
4
Low Bay
(<25 ft Floor to Ceiling Height)
Court Sports Arena—Class 3
1.20
4
1.19
Court Sports Arena—Class 2
1.92
4
Court Sports Arena—Class 1
3.01
4
Ring Sports Arena
2.68
4
Air/Train/Bus—Baggage Area
0.76
4
Airport—Concourse
0.36
4
Sports Arena
4
Museum
General Exhibition
Restoration
1.05
1.02
6
Transportation
6
Parking Garage
Garage Area
0.19
4
Post Office
Sorting Area
0.94
4
0.54
4
Terminal—Ticket Counter
1.08
4
Fine Material Storage
0.95
6
Medium/Bulky Material Storage
0.58
4
Warehouse
Religious Buildings
Audience Seating
1.53
4
Fellowship Hall
0.64
4
a
Worship Pulpit, Choir
Audience Seating
1.53
4
27
In cases where both a common space type and a building-specific type are listed, the
building specific space type shall apply.
BY : AHMED MOHAMED ABD-ELAAL
People
𝑄𝑠 =
𝑞𝑠
× N. person × 𝐶𝐿𝐹
𝑝𝑒𝑟𝑠𝑜𝑛
𝑄𝐿 =
𝑞𝐿
× N. person
𝑝𝑒𝑟𝑠𝑜𝑛
For getting “CLF”
From Table 2.2.1
For getting
“
𝑞𝑠
𝑝𝑒𝑟𝑠𝑜𝑛
,
𝑞𝑙
𝑝𝑒𝑟𝑠𝑜𝑛
”
From Table 2.2.2
28
BY : AHMED MOHAMED ABD-ELAAL
Miscellaneous
𝑞𝑠 = 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 × CLF
𝑞𝐿 = 𝐿𝑎𝑡𝑒𝑛𝑡
For getting “CLF”
From Table 2.2.3
From Table 2.2.4
29
BY : AHMED MOHAMED ABD-ELAAL
For getting “Sensible, Latent”
From Table 2.2.5
30
BY : AHMED MOHAMED ABD-ELAAL
From Table 2.2.6
31
BY : AHMED MOHAMED ABD-ELAAL
From Table 2.2.7
If no value of sensible and latent at table we use
𝑞𝑠 = 𝐶𝑠 × 𝑞𝑠 × CLF
𝑞𝐿 = 𝐶𝐿 × 𝑞𝐿
For getting “𝐶𝑠 , 𝐶𝐿 ”
From Table 2.2.8
32
BY : AHMED MOHAMED ABD-ELAAL
Power Equipment
𝐴
𝑞𝑠 = {𝐵 × 𝐹𝐿 × 𝐶𝐿𝐹
𝐶
For getting “ A , B , C ”
From Table 2.2.9
33
BY : AHMED MOHAMED ABD-ELAAL
For getting “𝐹𝐿 ”
From Table 2.2.10
For getting “CLF”
From Table 2.2.4
34
BY : AHMED MOHAMED ABD-ELAAL
Partition
Heat flow thru the interior construction (floors,
ceilings and partitions) is caused by a difference in
temperature of the air on both sides of the structure.
This temperature difference is essentially constant thru
out the day and, therefore, the heat flow can be
determined from the steady state heat flow equation,
using the actual temperatures on either side.
𝑄 = 𝐴 × 𝑈 × ∆𝑇
3 TYPES
The first case: The wall should be separated between two air-conditioned spaces. The temperature difference
shall be zero
The second case: The wall should be separated between two places, one of which is air-conditioned and the
other not air-conditioned
So the temperature difference ∆𝑇 = 33 − 𝑇𝐶
The third case: The wall should be separated between two places, one is air-conditioned and the other contains
electrical and mechanical equipment
So the temperature difference∆𝑇 = 43 − 𝑇𝐶
Where Tc is the temperature of the air-conditioned place and is almost equal 24
35
BY : AHMED MOHAMED ABD-ELAAL
Ventilation
𝑄𝑠 = 1.08 × ∆𝑇 × 𝐶𝐹𝑀
𝐶𝐹𝑀 = (
𝐹𝑜𝑟 𝐻𝑢𝑚𝑖𝑑𝑖𝑡𝑦 𝑅𝑎𝑡𝑖𝑜 (𝜔) {
For getting (
𝐶𝐹𝑀
𝑃𝑒𝑟𝑠𝑜𝑛
𝐶𝐹𝑀
) , (𝐴𝑟𝑒𝑎)
𝑄𝐿 = 4840 × ∆𝜔 × 𝐶𝐹𝑀
𝐶𝐹𝑀
𝐶𝐹𝑀
) × 𝑁. 𝑃𝑒𝑟𝑠𝑜𝑛 + (
) × 𝐴𝑟𝑒𝑎
𝑃𝑒𝑟𝑠𝑜𝑛
𝐴𝑟𝑒𝑎
𝐼𝑁 → 𝑇𝐷𝐵 = 24℃ , ∅ = 50%
↔ ∴ 𝜔𝑖 = 0.0094 𝐾𝑔/𝐾𝑔𝑑.𝑎
𝑂𝑈𝑇 → 𝑇𝐷𝐵 = 43℃, 𝑇𝑊𝐵 = 28℃ ↔ ∴ 𝜔𝑜 = 0.0175 𝐾𝑔/𝐾𝑔𝑑.𝑎
TABLE 3.1.1 MINIMUM VENTILATION RATES IN BREATHING ZONE
(This table is not valid in isolation; it must be used in conjunction with the accompanying notes.)
People Outdoor
Air Rate
Rp
Occupancy
Category
Area Outdoor
Air Rate
Ra
cfm/person L/s·person cfm/ft2
Default Values
Occupant Density
(see Note 4)
Combined Outdoor
Air Rate (see Note 5)
L/s·m2
#/1000 ft2
or #/100 m2
cfm/person L/s·person
Notes
Air
Class
Correctional Facilities
Cell
5
2.5
0.12
0.6
25
10
4.9
2
Dayroom
5
2.5
0.06
0.3
30
7
3.5
1
Guard stations
5
2.5
0.06
0.3
15
9
4.5
1
7.5
3.8
0.06
0.3
50
9
4.4
2
Daycare (through age 4)
10
5
0.18
0.9
25
17
8.6
2
Daycare sickroom
10
5
0.18
0.9
25
17
8.6
3
Classrooms (ages 5–8)
10
5
0.12
0.6
25
15
7.4
1
Classrooms (age 9 plus)
10
5
0.12
0.6
35
13
6.7
1
Lecture classroom
7.5
3.8
0.06
0.3
65
8
4.3
1
Lecture hall (fixed seats)
7.5
3.8
0.06
0.3
150
8
4.0
1
Art classroom
10
5
0.18
0.9
20
19
9.5
2
Science laboratories
10
5
0.18
0.9
25
17
8.6
2
University/college
laboratories
10
5
0.18
0.9
25
17
8.6
2
Wood/metal shop
10
5
0.18
0.9
20
19
9.5
2
Computer lab
10
5
0.12
0.6
25
15
7.4
1
Media center
10
5
0.12
0.6
25
15
7.4
1
Music/theater/dance
10
5
0.06
0.3
35
12
5.9
1
Multi-use assembly
7.5
3.8
0.06
0.3
100
8
4.1
1
Restaurant dining rooms
7.5
3.8
0.18
0.9
70
10
5.1
2
Cafeteria/fast-food dining
7.5
3.8
0.18
0.9
100
9
4.7
2
Bars, cocktail lounges
7.5
3.8
0.18
0.9
100
9
4.7
2
Break rooms
5
2.5
0.06
0.3
25
10
5.1
1
Coffee stations
5
2.5
0.06
0.3
20
11
5.5
1
Conference/meeting
5
2.5
0.06
0.3
50
6
3.1
1
Corridors
–
–
0.06
0.3
–
1
Storage rooms
–
–
0.12
0.6
–
1
Booking/waiting
Educational Facilities
A
Food and Beverage Service
General
36
B
BY : AHMED MOHAMED ABD-ELAAL
TABLE 3.1.1 MINIMUM VENTILATION RATES IN BREATHING ZONE (continued)
(This table is not valid in isolation; it must be used in conjunction with the accompanying notes.)
Occupancy
Category
People Outdoor
Air Rate
Rp
Area Outdoor
Air Rate
Ra
cfm/person L/s·person cfm/ft2
Default Values
Occupant Density
(see Note 4)
Combined Outdoor
Air Rate (see Note 5)
L/s·m2
#/1000 ft2
or #/100 m2
cfm/person L/s·person
Notes
Air
Class
Hotels, Motels, Resorts, Dormitories
Bedroom/living room
5
2.5
0.06
0.3
10
11
5.5
1
Barracks sleeping areas
5
2.5
0.06
0.3
20
8
4.0
1
Laundry rooms, central
5
2.5
0.12
0.6
10
17
8.5
2
Laundry rooms within
dwelling units
5
2.5
0.12
0.6
10
17
8.5
1
7.5
3.8
0.06
0.3
30
10
4.8
1
5
2.5
0.06
0.3
120
6
2.8
1
Office space
5
2.5
0.06
0.3
5
17
8.5
1
Reception areas
5
2.5
0.06
0.3
30
7
3.5
1
Telephone/data entry
5
2.5
0.06
0.3
60
6
3.0
1
Main entry lobbies
5
2.5
0.06
0.3
10
11
5.5
1
Bank vaults/safe deposit
5
2.5
0.06
0.3
5
17
8.5
2
Computer (not printing)
5
2.5
0.06
0.3
4
20
10.0
1
Electrical equipment
rooms
–
–
0.06
0.3
B
–
1
Elevator machine rooms
–
–
0.12
0.6
B
–
1
Pharmacy (prep. area)
5
2.5
0.18
0.9
10
23
11.5
2
Photo studios
5
2.5
0.12
0.6
10
17
8.5
1
Shipping/receiving
–
–
0.12
0.6
Telephone closets
–
–
0.00
7.5
3.8
–
Auditorium seating area
Lobbies/prefunction
Multipurpose assembly
Office Buildings
Miscellaneous Spaces
–
1
0.0
–
1
0.06
0.3
100
–
0.06
0.3
5
2.5
0.06
0.3
150
5
2.7
1
Places of religious
worship
5
2.5
0.06
0.3
120
6
2.8
1
Courtrooms
5
2.5
0.06
0.3
70
6
2.9
1
Legislative chambers
5
2.5
0.06
0.3
50
6
3.1
1
Libraries
5
2.5
0.12
0.6
10
17
8.5
1
Lobbies
5
2.5
0.06
0.3
150
5
2.7
1
Museums (children’s)
7.5
3.8
0.12
0.6
40
11
5.3
1
Museums/galleries
7.5
3.8
0.06
0.3
40
9
4.6
1
Transportation waiting
Warehouses
B
B
8
4.1
–
1
2
Public Assembly Spaces
37
BY : AHMED MOHAMED ABD-ELAAL
TABLE 3.1.1 MINIMUM VENTILATION RATES IN BREATHING ZONE (continued)
(This table is not valid in isolation; it must be used in conjunction with the accompanying notes.)
People Outdoor
Air Rate
Rp
Occupancy
Category
Area Outdoor
Air Rate
Ra
cfm/person L/s·person cfm/ft2
Default Values
Notes
L/s·m2
Occupant Density
(see Note 4)
Combined Outdoor
Air Rate (see Note 5)
#/1000 ft2
or #/100 m2
cfm/person L/s·person
Air
Class
Residential
Dwelling unit
5
2.5
0.06
0.3
F,G
F
1
Common corridors
–
–
0.06
0.3
Sales (except as below)
7.5
3.8
0.12
0.6
15
16
7.8
2
Mall common areas
7.5
3.8
0.06
0.3
40
9
4.6
1
Barbershop
7.5
3.8
0.06
0.3
25
10
5.0
2
Beauty and nail salons
20
10
0.12
0.6
25
25
12.4
2
Pet shops (animal areas)
7.5
3.8
0.18
0.9
10
26
12.8
2
Supermarket
7.5
3.8
0.06
0.3
8
15
7.6
1
Coin-operated laundries
7.5
3.8
0.06
0.3
20
11
5.3
2
Sports arena (play area)
–
–
0.30
1.5
Gym, stadium (play area)
–
–
0.30
7.5
3.8
Swimming (pool & deck)
–
Disco/dance floors
1
Retail
Sports and Entertainment
–
1
1.5
30
2
0.06
0.3
150
–
0.48
2.4
20
10
0.06
0.3
100
21
10.3
1
Health club/aerobics
room
20
10
0.06
0.3
40
22
10.8
2
Health club/weight rooms
20
10
0.06
0.3
10
26
13.0
2
Bowling alley (seating)
10
5
0.12
0.6
40
13
6.5
1
Gambling casinos
7.5
3.8
0.18
0.9
120
9
4.6
1
Game arcades
7.5
3.8
0.18
0.9
20
17
8.3
1
Stages, studios
10
5
0.06
0.3
70
11
5.4
1
Spectator areas
38
E
C
D
8
4.0
–
1
2
BY : AHMED MOHAMED ABD-ELAAL
Infilteration
𝑄𝑠 = 1.08 × ∆𝑇 × 𝐶𝐹𝑀
𝑄𝐿 = 4840 × ∆𝜔 × 𝐶𝐹𝑀
𝑁𝑎 × 𝑉𝑜𝑙𝑢𝑚𝑒 "𝑓𝑡 3 "
𝐶𝐹𝑀 =
60
𝑁𝑎 ≅ 0.8
For getting the value of Na
Table 3.1.2 Estimates of Infiltration Airflow, Air Changes per Hour
Neutral pressure, poor construction
Neutral pressure, average construction
Neutral pressure, tight construction
pressurized, poor construction ( Hospital )
pressurized, average construction
pressurized, tight construction
1.0
0.6
0.3
0.5
0.3
0.0
Summer air change rate, McQuiston 1985.
Outdoor Design Temperature, oC
29
32
35
38
41
Type
NA Number of air change from room volume per hour
Tight
0.33
0.34
0.35
0.36
0.37
Medium
0.46
0.48
0.50
0.52
0.54
loose
0.68
0.70
0.72
0.74
0.76
Note: values for wind velocity of 3.4 m/s and indoor temperature of 24 oC
43
0.38
0.56
0.78
Winter air change rate, McQuiston 1985.
Outdoor Design Temperature, oC
10
4
-1
-7
-12
Type
NA Number of air change from room volume per hour
Tight
0.41
0.43
0.45
0.47
0.49
Medium
0.69
0.73
0.77
0.81
0.85
loose
1.11
1.15
1.20
1.23
1.27
Note: values for wind velocity of 6.7 m/s and indoor temperature of 20 oC
-18
0.51
0.89
1.30
𝑁𝐴 = 𝑎 + 𝑏 𝑉 + 𝑐 (𝑇𝑂 − 𝑇𝑖 )
Constants of Eq. for number of air change per hour.
Type
Tight
Medium
loose
a
0.15
0.20
0.25
b
0.010
0.015
0.020
39
c
0.007
0.014
0.022
BY : AHMED MOHAMED ABD-ELAAL
Finally
𝑅𝑜𝑜𝑚 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑅𝑇𝐻 ,
𝑅𝑜𝑜𝑚 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑅𝑆𝐻 ,
𝑅𝑜𝑜𝑚 →
𝑂𝑢𝑡 𝐴𝑖𝑟 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑂𝐴𝑇𝐻 ,
𝑅𝑇𝐻 = 𝑅𝑆𝐻 + 𝑅𝐿𝐻
𝑂𝑢𝑡 𝐴𝑖𝑟 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑂𝐴𝑆𝐻 ,
𝑉𝑒𝑛𝑡𝑖𝑙𝑎𝑡𝑖𝑜𝑛 = 𝑂𝑢𝑡 𝐴𝑖𝑟 →
𝐺𝑙𝑜𝑏𝑎𝑙 𝑇𝑜𝑡𝑎𝑙 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝐺𝑇𝐻 ,
𝐺𝑙𝑜𝑏𝑎𝑙 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝐺𝑆𝐻 ,
→
𝑆𝐻𝐹 =
𝐺𝑙𝑜𝑏𝑎𝑙 𝐿𝑎𝑡𝑒𝑛𝑡 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝐺𝐿𝐻
𝐺𝑇𝐻 = 𝐺𝑆𝐻 + 𝐺𝐿𝐻
𝑄𝑆
→ 𝑡ℎ𝑒 𝑙𝑖𝑛𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑡ℎ𝑒 𝑟𝑜𝑜𝑚 𝑝𝑜𝑖𝑛𝑡[𝑅] 𝑎𝑛𝑑 𝑡ℎ𝑒 𝑠𝑜𝑢𝑟𝑐𝑒 𝑝𝑜𝑖𝑛𝑡[𝑆]
𝑄𝑇
𝐺𝑟𝑎𝑛𝑑 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 𝐹𝑎𝑐𝑡𝑜𝑟 → 𝐺𝑆𝐻𝐹 =
𝐺𝑆𝐻
→ 𝑡ℎ𝑒 𝑙𝑖𝑛𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑡ℎ𝑒 𝑝𝑜𝑖𝑛𝑡[𝑀] 𝑎𝑛𝑑 𝑡ℎ𝑒 𝑝𝑜𝑖𝑛𝑡[𝐴𝐷𝑃]
𝐺𝑆𝐻 + 𝐺𝐿𝐻
𝐸𝑓𝑓𝑒𝑐𝑡𝑖𝑣𝑒 𝑅𝑜𝑜𝑚 𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 𝐹𝑎𝑐𝑡𝑜𝑟
𝐵𝑦 𝑝𝑎𝑠𝑠 𝑓𝑎𝑐𝑡𝑜𝑟
𝐸𝑅𝑆𝐻𝐹 =
𝑂𝑢𝑡 𝐴𝑖𝑟 𝐿𝑎𝑡𝑒𝑛𝑡 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑂𝐴𝐿𝐻
𝑂𝐴𝑇𝐻 = 𝑂𝐴𝑆𝐻 + 𝑂𝐴𝐿𝐻
𝐺𝑙𝑜𝑏𝑎𝑙 (𝑅𝑜𝑜𝑚 + 𝑉𝑒𝑛𝑡𝑖𝑙𝑎𝑡𝑖𝑜𝑛) →
𝑆𝑒𝑛𝑠𝑖𝑏𝑙𝑒 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 𝐹𝑎𝑐𝑡𝑜𝑟
𝑅𝑜𝑜𝑚 𝐿𝑎𝑡𝑒𝑛𝑡 𝐻𝑒𝑎𝑡𝑖𝑛𝑔 → 𝑅𝐿𝐻
→
→
𝑏𝑝𝑓
𝐸𝑅𝑆𝐻𝐹
0.72 ≤ 𝐸𝑅𝑆𝐻𝐹 ≤ 1
0.1 ≤ 𝑏𝑝𝑓 ≤ 0.15
𝑅𝑆𝐻 + (𝑏𝑝𝑓 × 𝑂𝐴𝑆𝐻)
→ 𝑡ℎ𝑒 𝑙𝑖𝑛𝑒 𝑏𝑒𝑡𝑤𝑒𝑒𝑛 𝑡ℎ𝑒 𝑝𝑜𝑖𝑛𝑡[𝑅] 𝑎𝑛𝑑 𝑡ℎ𝑒 𝑝𝑜𝑖𝑛𝑡[𝐴𝐷𝑃]
(𝑅𝑆𝐻 + 𝑅𝐿𝐻) + 𝑏𝑝𝑓 × (𝑂𝐴𝑆𝐻 + 𝑂𝐴𝐿𝐻)
For calculating “CFM”
𝐶𝐹𝑀 =
𝑅𝑆𝐻 + (𝑏𝑝𝑓 × 𝑂𝐴𝑆𝐻)
(1 − 𝑏𝑝𝑓) × 1.08 × (𝑇𝑑𝑏 − 𝑇𝐴𝐷𝑃 )
40
BY : AHMED MOHAMED ABD-ELAAL
For getting TADP
TABLE 4.1.1- APPARATUS DEWPOINTS
41
BY : AHMED MOHAMED ABD-ELAAL
TABLE 4.1.1- APPARATUS DEWPOINTS (Continued)
79 – 72 F DB
42
BY : AHMED MOHAMED ABD-ELAAL
TABLE 4.1.1- APPARATUS DEWPOINTS (Continued)
72 – 55 F DB
*The values shown in the gray areas indicate the lowest effective
sensible heat factor possible without the use of reheat. This limiting
condition is the lowest effective sensible heat factor line that
intersects the saturation curve. Note that the room dewpoint is
equal to the required apparatus dewpoint for an effective sensible
heat factor of 1.0.
NOTES FOR TABLE 65:
1. For Room Conditions Not Given; The apparatus dewpoint may
be determined from the scale on the chart, or may be calculated
as shown in the following equation:
ESHF =
1
(Wrm – Wadp)
1 + .628
(trm – tadp)
This equation in more familiar form is:
ESHF =
43
0.244 (trm – tadp)
1076
0.244 (trm – tadp) + 7000 (Wrm – Wadp)
(Cont.)
BY : AHMED MOHAMED ABD-ELAAL
44
BY : AHMED MOHAMED ABD-ELAAL
45
BY : AHMED MOHAMED ABD-ELAAL
46
BY : AHMED MOHAMED ABD-ELAAL
MEP CODE
Eng: Ahmed M. Shuhayb
Phone: 01021522921
Engineers Union Company (EUC)
1
HVAC Design
Eng. Ahmed Shuhayb |01021522921
2
HVAC Design
معامل الضوضاء
Eng. Ahmed Shuhayb |01021522921
3
HVAC Design
عالقة سرعة الهواء الخارج مع معامل الضوضاء
الكود المصري
معامل تصحيح
:هي المسافة بين
والحائط أو نص المسافة بين عدد
:مسافة القذق
:البد من عمل تعديل على مسافة القذق بالقسمة على
لحدوث هبوط في قيمه ال
نتيجة الختالف درجة
حرار االرسال ودرجة حرارة الغرفة
Eng. Ahmed Shuhayb |01021522921
4
HVAC Design
سرعة الهواء داخل االماكن المكيفة
الكود المصري
Eng. Ahmed Shuhayb |01021522921
5
HVAC Design
سرعة الهواء داخل المستشفيات
الكود المصري
Eng. Ahmed Shuhayb |01021522921
6
HVAC Design
معدل تغير الهواء فى الساعة
أبعاد الهود المطلوبة
Eng. Ahmed Shuhayb |01021522921
7
HVAC Design
قيمة التدفق هواء الطرد للمتر الطولي للمعدة
القوانين المستخدمة فى التهوية العادية
) ACH ∗ 𝑉𝑜𝑙𝑢𝑚𝑒(𝑚3
= 𝑀𝐹𝐶
1.7
&
) ACH ∗ 𝑉𝑜𝑙𝑢𝑚𝑒(𝐹𝑡 3
= 𝑀𝐹𝐶
60
القوانين المستخدمة فى التهوية غرف المحركات
)𝑟H (Btu/ℎ
𝑟𝑖𝐴 𝑛𝑜𝑖𝑡𝑠𝑢𝑏𝑚𝑜𝐶 +
)ρ(0.027) ∗ 𝐶𝑝 (0.24) ∗ ∆T(18 − 20
= 𝑀𝐹𝐶
مساحة الفتحات االزمة للتهوية لغرفة المحركات
𝑴𝑭𝑪
)𝟎𝟎𝟎𝟏𝐕 (𝟒𝟎𝟎−
=𝑨
مساحة
=
Eng. Ahmed Shuhayb |01021522921
8
HVAC Design
قيمة السرعة العظمى
قيمة
Eng. Ahmed Shuhayb |01021522921
9
HVAC Design
سمك الصاح المجلفن واالستانليس
Eng. Ahmed Shuhayb |01021522921
10
HVAC Design
-
للحصول علي سمك الحامل – المسافة بين الحامل والحامل – وقطر التيش
-
للحصول علي سمك الزاوية – المسافة بين الزاوية والزاوية – وقطر التيش
Eng. Ahmed Shuhayb |01021522921
11
HVAC Design
Eng. Ahmed Shuhayb |01021522921
12
HVAC Design
Eng. Ahmed Shuhayb |01021522921
13
HVAC Design
Eng. Ahmed Shuhayb |01021522921
14
HVAC Design
Eng. Ahmed Shuhayb |01021522921
15
HVAC Design
Eng. Ahmed Shuhayb |01021522921
16
HVAC Design
Eng. Ahmed Shuhayb |01021522921
17
HVAC Design
قيمة
لحساب
𝑃∆
𝑙
∗ أطول مسار = 𝐶 ∗ 𝑉𝑝 +
باإلضافة الي مفاقيد(
مفاقيد(
)
)
Eng. Ahmed Shuhayb |01021522921
ملحقات
للحصول على قيم السرعات المناسبة للداكت :
Eng.Ahmed M.Shuhayb l 01021522921
Fitting of Duct :
Eng.Ahmed M.Shuhayb l 01021522921
التحاميل وفقا للكود المصري :
للحصول علي قيمة :Gage
Eng.Ahmed M.Shuhayb l 01021522921
المقصود بالطول المميز:
عالقة السرعة بمعامل الضوضاء:
تصحيح قيمة معامل الضوضاء بناء على عدد المخارج:
Eng.Ahmed M.Shuhayb l 01021522921
Eng.Ahmed M.Shuhayb l 01021522921
Eng.Ahmed M.Shuhayb l 01021522921
Eng.Ahmed M.Shuhayb l 01021522921
: األطوال المكافئة
Eng.Ahmed M.Shuhayb l 01021522921
الحد االعظمى في الهاب :
تصحيح قيمة الحرارة المحسوسة الناتجة من الكتالوج :
Eng.Ahmed M.Shuhayb l 01021522921
1
Fire Fighting
𝐎𝟐 : %15 نظام الغاز قلل نسبة االكسجين الى
Heat: Water System
Fuel: Foam System
Eng: Ahmed M.Shuhayb
01021522921
EUC
2
Types of Systems
-Wet Pipe System
هو نظام يتكون من رؤوس مرشات مائية تعمل اوتوماتيكياً ،متصلة بشبكة أنابيب مملوءة بالماء
يتم االستعانة بالنظام الرطب كنظام إطفاء في االنشغاالت والمساحات التي تكون فيها درجة الحرارة طبيعية
وال تزيد درجة حرارة الماء عن 70ال تقل عن 4أو األنظمة التي تحتاج إلى ضغط ال يزيد عن 12.1بار
-Dry Pipe System
هو نظام يتكون من رؤوس مرشات مائية تعمل اوتوماتيكياً ،متصلة بشبكة أنابيب مملوءة بالهواء او النيتروجين المضغوط
يتم االستعانة بالنظام الرطب كنظام إطفاء في االنشغاالت والمساحات التي تكون فيها درجة الحرارة
تزيد درجة حرارة الماء عن 70تقل عن 4أو األنظمة التي تحتاج إلى ضغط يزيد عن 12.1بار
-PreactionSystem
هو نظام يتكون من رؤوس مرشات مائية تعمل اوتوماتيكياً ،متصلة بشبكة أنابيب مملوءة بالهواء
المضغوط أو غير المضغوط وبنظام انذار اوتوماتيكي متصل بلوحة تحكم رئيسية ،بحيث يتم توزيع
مكونات نظام اإلنذار األوتوماتيكي) كواشف حرارة أو دخان أو لهب( في المنطقة نفسها المحمية
برؤوس المرشات المائية ،وعند عمل نظام اإلنذار فإنه يرسل إشارة إلى الصمام السبّاق ليسمح هذا
الصمام بدوره بمرور الماء في شبكة األنابيب ومن ثم التدفق من أي رأس مرش أو رؤوس مرشات
مفتوحة نتيجة لتأثرها بالحرارة الموجودة في الحيز الذي تكون مركبة فيه يمكن وضع هذا النظام في غرف الحاسوب
والمختبرات والمكتبات واالنشغاالت المشابهة
- Deluge System
يتكون النظام من رؤوس مرشات مائية مفتوحة دون بصيلة متصلة بشبكة أنابيب تتزود من مصدر مياه من خالل صمام
يسمى صمام الغمر.
تتم االستعانة بنظام الغمر الكامل كنظام إطفاء في االنشغاالت والمساحات التي تحتاج كميات كبيرة من الماء لإلطفاء في وقت
قصير ،وفي االنشغاالت التي تكون سرعة اشتعال المواد فيها عالية مثل خزانات الغاز المسال والسوائل المشتعلة وهناجر
الطائرات والمحوالت الكهربائية ،يكون نظام اإلنذار الذي يعمل على تشغيل صمام الغمر
أما ميكانيكي باستخدام الماء أو ميكانيكي باستخدام الهواء أو باستخدام الكهرباء
النظام الميكانيكي باستخدام الماء :هو عبارة عن أنابيب قطرها mm 25مملوءة بالمياه
النظام الميكانيكي باستخدام الهواء :هو عبارة عن أنابيب قطرها mm 15بالهواء المضغوط
Eng: Ahmed M.Shuhayb
01021522921
EUC
3
Eng: Ahmed M.Shuhayb
01021522921
EUC
4
Pump Room
Flow Meter
Pressure Relief Valve
OS&Y Valve
Control Panel
Eccentric Reducer
r
Strainer
r
Sensing Line
Alarm Check Valve
2-Pressure Gage
Flow Switch
Gate Valve
Tamper Switch
Water Alarm Valve
OS&Y Valve
Pressure Gage
Relief Valve
Flow Switch
Check Valve
Main Pump: Electrical
Stand by: Diesel
Start Up: Jokey الهدف منها وضع النظام تحت الضغط
%2:3GPM وحوالى10 PSI يكون ضغطها اعلى من المحسوب بحوالي
"ايهما أكبر6 أوD0.5 يبعد عن قاع الخزان بElbowالماسورة للي خارجة من الخزان بيتم توصيلها من الداخل ب
Vortexلتجنب حدوث
Eng: Ahmed M.Shuhayb
01021522921
EUC
5
حسابات سعة الخزان
𝐶=(𝑄𝑇∗3.78∗𝑇𝑖𝑚𝑒)/1000
30دقيقة للخطورة المنخفضة
60دقيقة للخطورة العادية
90دقيقة للخطورة العالية
(𝑄𝑇:( gpm
) 𝐶: (𝑚3
)𝑇𝑖𝑚𝑒 : (min
حساب قطر ماسورة الصاعد :
ال يقل قطر الصواعد الخاصة باإلطفاء اليدوي عن "4
تحديد اقطار المواسير الرئيسية ال يجب ان يقل عن 6بوصة اال في الحاالت التالية :
عندما تشير الحسابات الهيدروليكية تشير الي ان الضغوط ستكون مناسبة -المواسير ال تغذي عسكري حريق
المواسير التي تغذي فقط رشاشات اتوماتيكية او رشاشات مفتوحة اوclass II standpipes
Eng: Ahmed M.Shuhayb
01021522921
EUC
6
مقاسات الوصالت بغرفة المضخات
Eng: Ahmed M.Shuhayb
01021522921
EUC
7
Eng: Ahmed M.Shuhayb
01021522921
EUC
8
Sprinkler
:مكونات المرش
FrameOrificeCap/SealGlass BulbDeflector-
Eng: Ahmed M.Shuhayb
01021522921
EUC
9
Type of Sprinkler
Eng: Ahmed M.Shuhayb
01021522921
EUC
10
خطوات التصميم
تحديد درجة الخطورة:
-1الخطورة الخفيفة
حيث كمية ضئيلة من المواد القابلة لالشتعال ومعدل اطالق حراري منخفض جدا
ومن االماكن التي تتبع تلك الخطورة
دور العبادة النوادي المباني التعليمية المكتبات ماعدا غرف التخزين الكبيرة المكاتب المباني السكنية اماكن الجلوس بالمطاعم المسارح وقاعات االستماع ماعدا خشبة
المسرح الفراغات غير المستعملة اسفل السقف
-2الخطورة العادية
مجموعة A
كميات ضئيلة من المواد ذات القابلية المتوسطة لالشتعال وبارتفاع ال يزيد عن 2.4متر
ومن االماكن التي تتبع تلك الخطورة
الجراجات والمعارض للسيارات المخابز تصنيع المشروبات والمعلبات االلكترونيات تصنيع الزجاج ومنتجاته المعامل مواقع اعداد الطعام بالمطاعم
مجموعة B
ال يزيد االرتفاع عن 3.7متر
ومن االماكن التي تتبع تلك الخطورة
الخيول محالت االجهزة واآلالت معالجة المعادن المحالت التجارية مطاحن الغالل منشآت او مصانع الكيماويات العادية الخمور التنظيف الجاف منتجات الجلود عنابر
طحن الورق ومعالجته ولباب الثمر ارصفة الموانئ والمعابر المؤدية للسفن مكاتب البريد دور الطبع والنشر
-3الخطورة العالية
مجموعة A
.كميات كبيرة من مواد لها معدل احتراق عالية جدا ولكن تحتوي علي كمية قليلة او ال تحتوي من السوائل الملتهبة
ومن االماكن التي تتبع تلك الخطورة
حظائر الطائرات اماكن استخدام الزيوت الهيدروليكية صب القوالب او المسابك مصانع االخشاب مطابع االحبار ذات نقطة الوميض اقل من 38درجة مئوية معالجة
المطاط التنجيد باإلسفنج الصناعي او الفوم
مجموعة B
حرائق المواد الملتهبة
ومن االماكن التي تتبع تلك الخطورة
التشبع بالغاز الطالء بالسريان او االنسياب تصنيع المباني الجاهزة او تجميع اجزائها وعمليات التسقية المفتوحة بالزيوت معالجة البالستيك والدهان بالغمس
Eng: Ahmed M.Shuhayb
01021522921
EUC
11
االعتبارات التصميمية لتركيب الرشاشات )(SS Upright or Pendent
Obstructed ceiling
نوع االسقف الذي به معوقات للتدفق المائي للرشاشات مثل الكمر
Un obstructed ceiling
نوع االسقف التي تكون المسافة بين الكمرات اكبر من 2.3متر او االسقف ذات الكمر المفتوح مثل الموجود بالهناجر
المسافات القصوى بين الرشاشات وتحدد حسب الخطورة من الجدول االتي:
أقل مسافة بين الرشاشات ال يجب ان تقل عن 1.8متر حتي ال يبرد احدهما االخر فيمنع انفجاره ويسبب امتدد الحريق
Eng: Ahmed M.Shuhayb
01021522921
EUC
12
المسافات القصوى والدنيا بين الرشاشات والحوائط
ال يجب ان تزيد المسافة بين الرشاشات والحوائط عن نصف المسافة بين الرشاشات وبعضها اال في حالة
الحوائط غير المنتظمة حيث يسمح ب 0.75من المسافة القصوى بين الرشاشات
وال يجب ان تقل عن 10سم وبصفة عامة ال تزيد المسافة عن 2.7متر
Unobstructed ceiling
نوع االسقف التي تكون المسافة بين الكمرات اكبر من 2.3متر او االسقف ذات الكمر المفتوح مثل الموجود بالهناجر
Eng: Ahmed M.Shuhayb
01021522921
EUC
13
Obstructed ceiling
نوع االسقف الذي به معوقات للتدفق المائي للرشاشات مثل الكمر
وفي حال االسقف التي بها كمر يجب ان تكون المسافة بين رأس الرشاش واسفل الكمرة ما بين (" )6"-1بحيث ال تزيد المسافة بين رأس
الرشاش والسقف عن"22
ويفضل ان يتم الحفاظ علي اقصي مسافة بين الرشاش والسقف علي 12بوصة في حالة قلة المسافة بين الكمر وبعضه عن 2.3متر
Eng: Ahmed M.Shuhayb
01021522921
EUC
14
االعتبارات التصميمية لتركيب الرشاشات )(SS.Side
المسافات القصوى بين الرشاشات وتحدد حسب الخطورة من الجدول االتي:
المسافة بين الرشاش والسقف تكون بين 4و 6بوصة ويمكن ان تزيد المسافة الي 18بوصة ولكن باستعمال رشاشات مخصصة لذلك
بالنسبة للحوائط المتقابلة يسمح بان تكون المسافة بينها 7.32متر في حالة الخطورة الخفيفة و6.1متر في حالة الخطورة العادية
Eng: Ahmed M.Shuhayb
01021522921
EUC
15
تحديد المساحة التصميمية وعدد الZCVs
هي اكبر مساحة ممكن تركيب وتجميعها علي مجموعة صمامات تحكم واحدة ويتم تحديد ذلك طبقا لدرجة
الخطورة كاآلتي
المساحة في حالة الخطورة الخفيفة والعادية هي 4831متر مربع
وفي حالة الخطورة العالية هي 2323متر مربع وذلك في حالة الحساب بطريقة جداول المواسير
و 3716متر مربع في حال الحسابات الهيدروليكية
تحديد اقطار المواسير
Eng: Ahmed M.Shuhayb
01021522921
EUC
16
Eng: Ahmed M.Shuhayb
01021522921
EUC
17
Eng: Ahmed M.Shuhayb
01021522921
EUC
18
:حساب التدفق والضغط عند أبعد مرش
𝑄𝑠𝑡.=𝐴𝑆×𝐷𝑑
𝑄𝑠𝑡.=𝐾 √𝑃𝑠𝑡.
ΔP/L=(4.52 * Q ^1.85)/(c^1.85*d^4.87)
Q: GPM
Eng: Ahmed M.Shuhayb
01021522921
EUC
D:in
L: Ft
ΔP:Psi
19
أي مضخات للحريق يجب ان تحقق االتي:
عند التدفق %150من التدفق المحدد لها يجب ان يكون الضغط % 65من الضغط المحدد لها
وان يكون ضغط التدفق الصفري (ضغط الغلق) ال يزيد عن % 140من الضغط المحدد
وفى حالة لو كان الضغط عند التدفق الصفري اقل من %121من الضغط المحدد ال حاجة الىPressure Relief Valve
)Q(pump)= Q (Fire Hose) +Q(Sprinklers) + Q(Riser
Pump head (PSI)=friction losses + static head + Residual pressure
Static head= Building Height /10.28
Eng: Ahmed M.Shuhayb
01021522921
EUC
20
مواسير الصرف :
المسافة بين التحاميل و قطر األتياش:
Eng: Ahmed M.Shuhayb
01021522921
EUC
21
أكواد المواسير المعلقة :
أكواد المواسير المدفونة :
Eng: Ahmed M.Shuhayb
01021522921
EUC
22
Eng: Ahmed M.Shuhayb
01021522921
EUC
23
:Scheduleسمك المواسير طبقا لنوع
Eng: Ahmed M.Shuhayb
01021522921
EUC
24
(StandPipes) Fire Hose Cabient
خرطوم من المطاط ملفوف على بكرة لها زراع - Hose Reel :
خرطوم من القماش المقوي يستخدمة الدفاع المدنى - Hose Rack :
يوضع بالقرب من المخارج وساللم الهروب ويغطى مسافة 30متر
ارتفاع الصندوق 150 :90سماألنواع:
Exposed -1بارزعن الحائط بمسافة 25سم
Semi predated -2بارز من الحائط 10سم وغاطش 15سم
Recessed-3غاطس بالكامل في الحائط
هو عبارة عن صندوق حريق يحتوى على حنفية 2.5بوصة أو 1.5بوصة أو كليهما
Class(1) : 2.5 “- 250 gpm – 6.7 bar
Class(2) : 1” or 1.5 “- 100 gpm – 4.5 bar
Class(3) : 1.5” or 2.5 “ - 250 gpm – 6.7 bar
اوال النوع االول والثالث من الصناديق
يكون للصاعد االبعد 500جالون بالدقيقة ولكل صاعد بعد ذلك 250جالون بالدقيقة وبحد اقصي 1250جالون بالدقيقة،
واذا زادت المساحة عن 7432متر مربع يتم زيادة الصاعد الذي يليه الى 500جالون بالدقيقة
ثانيا النوع الثانى من الصناديق
100 gpmللصاعد االبعد وبدون زيادة للصواعد األخرى ونفس الكالم للحسابات الهيدروليكية
في حالة النظام Combinedصناديق حريق +رشاشات
يسمح فقط للصناديق 1000gpmبدل من 1250
طريقة الحسابات :
هحسب مرة على الرشاشات +صناديق الحريق من النوع الثانى-هحسب مرة أخرى على صنادي الحريق من النوع األول او الثالث
هختار األعلى فيQ ,H
السرعة في انظمة مكافحة الحريق ال تقل عن 10Fpsوال تزيد عن 21Fps
Eng: Ahmed M.Shuhayb
01021522921
EUC
25
Eng: Ahmed M.Shuhayb
01021522921
EUC
26
Fire Hydrant
في حالة انتشار الحريق يتم استخدام عساكر الحريق Fire Hydrant
وتكون حول المبنى وتغطى مسافة 30متر وهي حنفية 2.5بوصه ضغط 6.7بار و 250جالون
بالدقيقة
بعض الدول العربية يتم عمل Dry Riserتوصل كل دور عليه موصله بطلمبة الحريق وتكون ماسورة "4ويركب صمام عدم رجوع
Riserينتهى Siemens Connectionsوتسمى الماسورة ب Landing Valve
توضع الوصلة واضحة في واجهة المبنى حتى يتم توصيليها بعربية تعزيز للرشاشات في حالة نفاء الماء من الخزان
عسكري الحريق
2* 2.5Hose Nozzle
1* 4.5Bumper Nozzle
Eng: Ahmed M.Shuhayb
01021522921
EUC
27
Fire Extinguishers
طفايات الحريق هي الخط الدفاع األول عند حدوث الحريق وينقسم الطفايات حسب درجة الخطورة والمراد لتي بداخلها والمواد القابلة
لالحتراق واالشتعال
)( (Water or Dry Chemical, Foamمطاط – بالستيك – أخشاب – ورق – أقمشة) Class A
)( (Foam, Co2, Dry Chemical, FFFP, AFFFزيوت – غازات – السوائل الملتهبة) Class B
)( (Co2, Dry Chemicalالكهرباء) Class C
(مواد الصوديوم والماغنسيوم) Class D
)( (Wet chemical powderخاص بالمطابخ) Class K
Classification of Hazard:
-Light: A&B
-Ordinary: A&B
-Extra: A&B
Note:
الطفاية التي تزيد عن 18كيلوجرام توضع على ارتفاع 1متر من القمةالطفاية التي ال تزيد عن 18كيلوجرام توضع على ارتفاع 1.5متر القمة-ارتفاع الطفاية من على األرض ال تقل 10سم
Eng: Ahmed M.Shuhayb
01021522921
EUC
28
المسافات بين طفايات الحريق والمساحة التي يغطيها الرشاش
للحصول على عدد الطفايات بقسم المساحة على المساحة اللي بغيطيها الطفاية طبقا للجدول األول
Class C
ويتم التوزيع طبقا لA, B
Class D
ال يجب ان تزيد المسافة االرتحالية بين الطفاية والخطورة عن 23متر
Class K
ال تزيد المسافة االرتحالية بين الطفاية والخطورة عن 9.15متر
Eng: Ahmed M.Shuhayb
01021522921
EUC
29
FM200
من الممكن استخدام غاز ثاني أكسيد الكربون في نظام اإلطفاء ولكن في األماكن الذي ال يتواجد فيها اشخاص غاز ثانى أكسيد الكربون
عندما تصل نسبة تركيزه فى الهواء الجوى فى مكان ما إلى 0.03
إلى 0.04يتسبب ذلك فى زيادة معدل تنفس اإلشخاص الموجودين بالمكان
و عندما تصل نسبته إلى 0.09يتسبب ذلك غلى فقدان الوعى لإلنسان و إذا وصل إلى 0.2يتسبب بالوفاة
يتم تصميم نظام اإلطفاء األتوماتيكى بغاز ثانى أكسيد الكربون على أن يكون نسبته 0.34
لكى نقلل من نسبة األكسجين فى المكان إلى أقل من 0.16لذلك ال نستخدم غاز ثانى أكسيد الكربون فى األماكن التى يتواجد فيها
أشخاص وذلك يرجع إلى طبيعة الغاز الخانقة.
Design FM 200
W= V * Cf* Catt
)W: Minimum required FM200 quantity (KG
)V: net Hazard volume (m3
) Cf: flooding factor (kg / m3)----( table 5.5.3.3
Design concentration 7% for class A & C
9% for class B
Calt: altitude correction factor
)W = V/S (c /100-c
)Where W :required FM200 Quantity (KG
)V= net hazard volume (m3
) S=specific vapor volume (m3/kg )----( table A5 .5.1
= 0.1269 + .0005131 T @ sea level
) C = concentration ( 6.7 % to 8.7 %
Eng: Ahmed M.Shuhayb
01021522921
EUC
30
Eng: Ahmed M.Shuhayb
01021522921
EUC
1
Plumbing
Eng: Ahmed M.Shuhayb
01021522921
EUC
2
Domestic Cold Water
Water Tank
سعة خزان المياة
= عدد االشخاص في المبنى* استهالك المياه للشخص الواحد * عدد أيام التخزين
طريقة أخري لحساب عدد األشخاص = مساحة المبنى /أقصى مساحة يشغلها الشخص الواحد
Eng: Ahmed M.Shuhayb
01021522921
EUC
3
Eng: Ahmed M.Shuhayb
01021522921
EUC
4
Gravity Tank System
Eng: Ahmed M.Shuhayb
01021522921
EUC
5
Hydropenumatic Tank System
هنا الهواء المضغوط الذي يدفع المياة داخل Systemفي االحمال القليلة
وعندما يزداد الحمل تقوم المضخة بالعمل و %50يدخل الى %50,Systemتدخل الى Tank
الضغط داخل ال Tankأعلى م ضغط ال Systemبمقدار 20 PSI
Eng: Ahmed M.Shuhayb
01021522921
EUC
6
Eng: Ahmed M.Shuhayb
01021522921
EUC
7
Eng: Ahmed M.Shuhayb
01021522921
EUC
8
Booster Pumps System
Eng: Ahmed M.Shuhayb
01021522921
EUC
9
Eng: Ahmed M.Shuhayb
01021522921
EUC
10
حساب احتياجات المبنى من المياه
1-WSFU
Eng: Ahmed M.Shuhayb
01021522921
EUC
11
2-WSFU to GPM
Eng: Ahmed M.Shuhayb
01021522921
EUC
12
3-Diameter of Pipe
pipe sizerمن خالل برنامج قدم100 قدم لكل10 مفاقيد الضغط,( 2:10Fps( سرعة المياة-
Eng: Ahmed M.Shuhayb
01021522921
EUC
13
حسابات المضخة
الضغط نتيجة االحتكاك+ الضغط نتيجة االرتفاع+ ضغط المضخة = الضغط المطلوب عند أبعد جهاز
Pump head (PSI( =friction losses + static head + Residual pressure
Residual pressure:
Eng: Ahmed M.Shuhayb
01021522921
EUC
14
Static head = Building Height / 10.28
Friction losses = [pipe length + equal length (fitting)] ∆𝑷/𝟏𝟎𝟎𝑭𝒕
Eng: Ahmed M.Shuhayb
01021522921
EUC
15
لحساب المفاقيد في Riserنجمع FUفي كل دورومن خالل FUالكلى نحصل علي القطر والمفاقيد
ملحوظة ال نجمع GPMبتاع كل دورللحصول علي GPMالكلي
Eng: Ahmed M.Shuhayb
01021522921
EUC
16
Domestic Hot Water
Storage Tank Capacity= ∑ 𝑮𝑷𝑯 * Demand Factor * Storage Capacity Factor
Eng: Ahmed M.Shuhayb
01021522921
EUC
17
معدالت التسخين للوحدات الصحية:
Eng: Ahmed M.Shuhayb
01021522921
EUC
18
لحساب قدرة الكهربية للسخان
بعد حساب GPHنقسم الى 60لتحويلها الى GPMثم ندخل الخريطة ونحدد قطر ماسورة تغذية السخان
مع مراعاة ان ال تزيد السرعة عن 5 ft/secوال 10ft/100ft friction losses
)(Hot Water System Recirculation
نحصل علي مفاقيد الحرارة في المواسير
Eng: Ahmed M.Shuhayb
01021522921
EUC
19
حساب قطر مواسير ال Return
هناك أكثر من طريق لحساب قطر ماسورة الراجع Returnمنها
-1يكون قطر ماسورة الراجع = Returnنصف قطر مواسير ال Supply
Heat losses (Return) = ⅔ Heat losses (Supply) -2
فبالتالي بالطريقة الثانية ممكن الحصول على مفاقيد الحرارة الكلية
)Total Heat losses = 5/3 * Heat losses (Supply
المطلوب معرفته
-1اقطار مواسير الراجع
-2قدرة مضخة التدوير
كل 10,000 BTU/Hمن ال Heat lossesتستلزم )1 GPM (circulated
طريقة اخري للحساب
Eng: Ahmed M.Shuhayb
01021522921
EUC
20
حساب قطر مواسير الراجع
نفترض ال pressure lossesالكلى في شبكة 30 ft Return
∗ 𝟏𝟎𝟎=……..Ft/ 100Ft
)𝒕𝑭 𝟎𝟑( 𝒔𝒆𝒔𝒔𝒐𝑳 𝒆𝒓𝒖𝒔𝒔𝒆𝒓𝑷
) اكواع مفاقيد 𝑹𝒆𝒕𝒖𝒓𝒏 𝑳𝒆𝒏𝒈𝒉𝒕∗𝟏.𝟏 ( 𝟏𝟎%
= Pressure Drop
احنا نثبت مفاقيد الضغط على طول الخط -مع حضرتك حاليا مفاقيد الضغط ومعاك GPMتدخل زي البرنس الخريطة تجيب القطر المناسب
بعد أما حصلنا الى أقطار Returnندخل الجدول السابق بمعلومية القطر ونحصل على ال Heat losses
Heat losses -1الفعلي اللي طلعت من الجدول اقل من او يساوى أو أكبر من اللي انتا فرضته بنسبة %10
يبقي شغلك تمام وغالبا بيكون تمام من اول مرة
-2اما بقي لو انت نحس والنسبة طلعت كبيرة هتاخد قيمة Heat lossesالجديدة
وتعيد الحسابات تانى من األول مش قولتلك انت نحس
وايضا من الممكن استعمال الطريقة االولى وهي بفرض
يكون قطر ماسورة = Returnنصف قطر مواسير ال Supply
Riserبتاع الراجع = 0.75بوصة
مضخة ال circulationبتعمل عند 1450 rpmوليس 2900 rpm
يوضع على خط الراجع الداخل للسخانCheck valve – Balance Valve – Gate Valve
Eng: Ahmed M.Shuhayb
01021522921
EUC
21
Eng: Ahmed M.Shuhayb
01021522921
EUC
22
Sanitary Drain
خطوات حساب اقطار وتصميم مواسير الصرف
:DFUحساب
Eng: Ahmed M.Shuhayb
01021522921
EUC
23
الختيار الميل المناسب بناء علي قطر الماسورة :
للحصول علي قطر الماسورة من خالل معلومتى الميل و:DFU
Eng: Ahmed M.Shuhayb
01021522921
EUC
24
: Riser للحصول علي قطر
Eng: Ahmed M.Shuhayb
01021522921
EUC
25
ظاهرةHydraulic Jump
في حالة ربط صرف الدور األرضي عليه البعد من ربط بعد مسافة 10اضعاف القطر لتجنب الظاهرةالصرف العمومي يسمىBuilding Drain
أنظمة الصرف
-1صرف باستخدام ماسورتين Waste – Soil Stack
-2صرف بماسورة واحدة تجمع بين Waste – Soil Stackوعمل ماسورة تهوية
- 3نظام يسمى Single Stackزى النظام السابق ولكن بدون ماسورة تهوية
يلزم لعملة شروط
– ان تكون األجهزة الصحية قريبة من ماسورة الصرف – كل جهاز يتم صرف على الماسورة مباشر
Eng: Ahmed M.Shuhayb
01021522921
EUC
26
Eng: Ahmed M.Shuhayb
01021522921
EUC
27
في حالة وجود بدروم يتم صرف من خاللSubmersiple Pump
نقوم بتركيب Sensorاكبر من ارتفاع تشغيل المضخة علشان لو حصل عطل للمضخة
تصميم حوض Sump Pump
التقل قطرها عن 18بوصة وال يقل ارتفاعها عن 24بوصه
نحسب Gpmوفرضا عاوزين نشغلها كل 10دقائق
Volume = GPM * Time = ………Gallon
Actual Volume = Volume + Pump Volume
المسافة بين أي 2مانهول ال تقل عن 30متر 1-Manhole
Dim: 80*120*150 - 60*90*120 - 60*60*85
2-Holding Tank
عبارة عن خزان يوضع فيها المياه لمدة أيام فرضا 5أيام وبعدها العربية تجي تسحب المياه
2-Septic Tank
Method -1
Method -2
)(P – No.People
)Q=0.18 X P X 45 (m3
Eng: Ahmed M.Shuhayb
01021522921
EUC
28
ويستخدم في المباني الكبيرة يضاف قيمة جدول 7.1علي قيمة جدول Method -3 7.2
Eng: Ahmed M.Shuhayb
01021522921
EUC
29
بنقسم Septic Tankالي جزئين
سعة الجزء األول علي تقل عن 2متر مكعب ال يقل طوله عن 1.5متر وال يقل عمقه عن 1.8متر
يوضع بين الجزئين ماسورة 6بوصه
سعة الجزء األول ال تقل عن ثلثي الخزان وسعة الجزء الثاني ال تزيد عن ثلث الخزان
Grease Interceptor
توضع في الحواض لفصل الزيوت والدهون
Waste Food Grinder
توضع في االحواض لتفتييت بواقى االكل حتى تسهل عملية الصرف
Indirect Waste
يستخدم في صرف المطابخ التجارية والمصانع الغذائية
1- Air Gap
2- Air Break
Eng: Ahmed M.Shuhayb
01021522921
EUC
30
VENTING - تهوية الصرف
Individual Vent-1
Eng: Ahmed M.Shuhayb
01021522921
EUC
31
Eng: Ahmed M.Shuhayb
01021522921
EUC
32
Storm Drain
-Gutter
هو عبارة عن مجمع لمياة المطر
-Leader
هو الرايزر االساسى للصرف
- Horizontal Drainage
يفضل عدم ربط صرف المطر مع الصرف العادي بسبب عدم حدوث Flooding
GPM = I * C * A
شدة المطرI = 4 in/ hr
C = 0.9
A= Area Ft2
الميل يراعى ان يكون الفرق بين المنسوبين ال يزيد عن 10الى 15سم
Leader
Eng: Ahmed M.Shuhayb
01021522921
EUC
33
Eng: Ahmed M.Shuhayb
01021522921
EUC
34
- Horizontal Drainage
-Gutter
Eng: Ahmed M.Shuhayb
01021522921
EUC
2018
REVIT MEP
BY: Eng/ Ahmed M. Shuhayb & Eng/ Ahmed M. Abd-elaal
1
الحمد هلل الذي تتم بنعمته الصالحات أوال الحمد هلل الذي وفقنا للقيام بعمل هذا الكتاب و
الفضل موصول للمهندسين
م /وائل نسيم
م /سماح سلطان
م /بالل سويد
م /محمد السعيد
م /عمر سليم
علي ما بذلوه من مجهودات في الكورسات و التجاوب مع األسئلة
و لعل هذا الكتاب يكون صدقة علم علي روح المرحوم
المهندس /محمد عبدالحميد شهيب
نسألكم الدعاء
2
Table of Contents
CHAPTER (1) USER INTERFACE ......................................................................................... 3
1.1. INTER FACE ................................................................................................................ 4
1.2. RIBBON & TEMPLATE ................................................................................................. 5
1.3. INSERT LINK REVIT .................................................................................................... 9
CHAPTER (2) TEMPLATES ................................................................................................. 20
2.1. PLAN VIEW .............................................................................................................. 21
2.2. CREATE TEMPLATE .................................................................................................. 28
CHAPTER (3) MODIFY TAB ................................................................................................ 32
3.1. MODIFY .................................................................................................................... 33
3.2. SYSTEM .................................................................................................................... 35
CHAPTER (4) HVAC SYSTEM ............................................................................................ 36
4.1. MECHANICAL SITTINGS ........................................................................................... 37
4.2. ROUTING PREFERENCES........................................................................................... 39
4.3. CREATE DUCT SYSTEM ............................................................................................ 41
4.4. DUCT SIZING ............................................................................................................ 46
4.5. DUCT ACCESSORY ................................................................................................... 53
CHAPTER (5) SHOP DRAWING .......................................................................................... 57
5.1. SHEET....................................................................................................................... 58
5.2. ANNOTATION ........................................................................................................... 61
CHAPTER (6) FIRE PROTECTION ...................................................................................... 67
6.1. CREATE FIRE PROTECTION ...................................................................................... 68
CHAPTER (7) PLUMBING .................................................................................................... 75
7.1. CREATE PLUMBING SYSTEM .................................................................................... 76
CHAPTER (8) SCHEDULES ................................................................................................. 84
8.1. SCHEDULES (QUANTITIES)....................................................................................... 85
CHAPTER (9) WORK SET .................................................................................................... 93
9.1. WORK SET (WORK SHARING) .................................................................................. 94
A
3
CHAPTER 1
User Interface
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
4
A
واجهة البرنامج تنقسم لقسمين
1.1. Interface
Projects :تستخدم لفتح مشروع و تجهيزه للعمل به سواء كان مشروع موجود مسبقا ً او مشروع
جديد.
فتح مشروع تم حفظه مسبقا وتريد التعديل علية -Open:
فتح مشروع جديد -New:
Families :تستخدم لعمل فاميلي و استخدامها في المشروع مثل( مضخة او مخرج هواء او ....الخ)
بمواصفات معينة غير موجود فى الفاميلى الموجودة فى البرنامج.
وسوف يتم شرحها بالتفصيل فى الجزء الثانى من الكتاب
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
5
1.2. Ribbon& Template
optionsللدخول علي خصائص البرنامج نختار
تظهر القائمة التالية
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
6
A
Ribbon
Option
Graphic
Render
File
Location
User
Interface
General
عدد مرات حفظ المشروع و يُفضل جعلها مرتين General:
User Interface:
االختصارات التي تضيفها لتسهل عليك التعامل مع البرنامج Keyboard Shortcuts :
يستخدم في تحديد لون شريط االظهار في اعلي الشاشة Active theme :
تحديد موضع النماذج األساسية في البرنامج و سيتم الحديث عنها بالتفصيل فيما بعد File Location:
يستخدم في اخراج الشكل النهائي للمشروع في صورة Render:
تستخدم في تحديد لون خلفية المشروع و القطاعات و التحذيرات و خالفهGraphic:
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
7
A
File Location
من خالله تقوم بإدراج قوالب العمل سواء قالب عمل ميكانيكى أو قالب عمل عمارة او قالب عمل
كهربى ....
هي قوالب مجهزة للعمل لكل مجال قالب مهيأ له و ذلك لتسهيل تنفيذ المشروع Template :
مثال :اذا كان المشروع تكييف و صرف صحي و مكافحة حرائق يفضل استخدام mechanical
يشير السهم إلي كيفية إدراج قوالب العمل و تصبح دائما في واجهة البرنامج و مسار االدراج
كالتالي
C:\Program Files\Autodesk\Revit 2016\RVT 2016\Template.
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
8
و بعد إدراج القوالب سوف تظهر في واجهة البرنامج
بصورة دائمة
MEP و هذه تقسيمة القوالب الخاصة بمهندس ال
Mechanical Electrical Plumbing Engineer
1.2: The Templates
of Revit MEP
Mechanical
Templates
HVAC
System
Templates
Plumbing
Plumbing
HVAC
Plumbing
Fire Fighting
Electrical
Fire Fighting
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
9
A
1.3. Insert Link Revit
خطوات إدخال مشروع معمارى مرسوم ببرنامج الريفت وتجهيزه لشغلMEP
)1اختار القالب المناسب للعمل من القوالب المدرجة على واجهة البرنامج
او من خالل قائمة New
والدخول فى مسار البرنامج
C:\Program Files\Autodesk\Revit 2016\RVT 2016\Template.
Note
الفرق بين Project & Project template
مشروع من الممكن عمل له Project: Worksharing
مشروع ال يمكن عمل له Project template: Worksharing
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
10
A
-سيتم فتح مشروع البرنامج
هتالحظ وجود قائمتين اساسيتين
Project Browser – Properties
فى حالة اختفاءهم من واجهة البرنامج واظهارهم مرة اخرى من خالل قائمة
View
User Interface
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
11
A
نالحظ قائمة Project Browser
مقسمة الى
) Decipline (Mechanical
) Sub Decipline (HVAC-Plumding
والتقسيمة دى بناء على القالب اللى اختارته فى بداية المشروع
)2لدخول مشروع معمارى
-1لو المبنى مرسوم ريفت هتقوم بسحب المشروع Link Revit
من مميزات عمل Linkهو مراقبة المشروع المعمارى لو حدث تعديل فى مشروع المعمارى
-2لو المبنى مرسوم كاد هتقوم بسحب المشروع Link CAD
من مميزات عمل Linkهو مراقبة المشروع المعمارى لو حدث تعديل فى مشروع المعمارى
-3لو المبنى مرسوم كاد هتقوم بسحب المشروع Import CAD
فى الحالة دى ال يمكن عمل متابعة المشروع المعمارى
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
12
A
Insert – Link Revit
تقوم بسحب المشروع والبد ان يكون Origin to Origin
)3بمجرد فتح المشروع هيكون عبارة عن Linkوضغط عليه وعمل تثبيت ليه Pin
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
13
A
)4من قائمة Project Browser
نختار الوجهه الجنوبية مثال )(South -Mechهنالحظ
وجود مستوياتLevelsخاصة بالمشروع المعمارىال تستطيع تحديدها بشكل فردى علشان المشروع المعمارى Linkتابعة للمشروع المعمارى
كله على بعضة
2Level Default-تقدر تحددهم وتمسحهم من اجل تعريف المستويات الخاصة بالمشروع المعمارى
و يوجد هناك 2Level Defaultهيحدد معاك المشروع المعمارى بالكامل كما هو موضح فى الصورة
و تتشيل الصح من قدام RVTمشكلة لما تكون بتحديد وبالتالى هيكون المستويين بس همه اللى متحددين
الحل ببساطة هتضغط على Filter
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
14
A
نالحظ ان المستويين
تم تحديدهم فقط
ونقوم بعمل مسح
ليهم
Delete
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
15
A
Project Browserال يوجد المستويات التى كانت موجودة تحت HVAC - Plumbing
نالحظ قائمة
حاليا المشروع المعمارى موجود وجاهز لعمل نسخ للمستويات بتاعته ومراقبة تعاله بقى
بهدووووء نشوف هنعمل ايه
هنضغط Collaborateثم Copy/Mintorونختار Select Linkوبعد كدة نضغط على المشروع
على ايقونة
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
16
A
هنعمل Copy
ومتنساش تضغط صح قدام كلمة Multipleعلشان تقدر تحدد المستويات مرة واحدة
هتحدد المستويات عادى جدا بس ممكن تحدد بالغلط حاجات تانية معاها فعلشان تتاكد انت حدد
هتالقى مؤشر لل Filterالمستويات وبس
finishتضغط على finishاللى تحت مش اللى فوق علشان اللى فوق بتطلع من االمر كله
وبعد كدة تضغط
ولكن احنا لسه محتاجين بعد النسخ نعمل مراقبه فعلشان كدة هنضغط علىMonitor
وبعد عمل النسخ والمراقبة تضغط.Finish
المفروض بعد الخطوات دى كلها مستويات المشروع
المعمارى تظهر فىProject Browser
ولكن مش هتالقيها ظهرت لالسف علشان انت
نسخت المستوسات وعملت مراقبة ليها
ولكن معملتش ليها اظهار ...
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
17
A
عاوز اعمل اظهار لالرضيات فى قائمة المشروع
هروح على ايقونة Viewواختار Plan View
هختار إظهار Floor Planاالرضيات
وتحدد كل المستويات اللى عملتلها نسخ قبل كدة
بعد الخطوات السابقة نالحظ ظهور المستويات
المعمارية بنفس االسماء المعمارية تحت HVAC
Basment-Level1- Level2- Parapet -Roof
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
18
A
هنكرر الخطوات تانى الظهار السقف المستعار
هروح على ايقونة Viewواختار Plan Viewواختار Reflected Ceiling Plan
نكرر الخطوات دى تانى الظهار Reflected Ceiling Planالسقف المستعار
بعد الخطوات السابقة نالحظ ظهور المستويات المعمارية بنفس االسماء المعمارية
ولكن تحتCoordination
Basment-Level1- Level2- Parapet -Roof
عاوز اظبط المستويات بحيث يكون مستويات السقف الساقط تحت قائمةHVAC
كل اللى هعملة ببسااااااطة هو
هروح قايمة Properties
وهخلى) Dicipline( Mechanical
)Sub Dicipline ( HVAC
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
19
A
مبروك انت كدة قدرت تدخل مشروع معمارى
مرسوم ريفت
واظهار المستويات سواء ارضيات أو سقف مستعار
وحاليا جاهز لشغل HVAC
طيب انا اعاوز HVAC + Plumbing + Fire
اشتغل
هتشوف معانا بالتفصيل فى الفصل الثانى للكتاب
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
20
CHAPTER 2
Templates
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
21
A
2.1. Plan View
إلدخال المستويات سواء أرضيات اوأو سقف ساقط مرة اخرى لتجهيزها لشغل Plumbing
نكرر الخطوات تانى وهى
Floor Plan / Reflecting Ceiling Plan
Plan View
View
ولكن هتالقى مشكلة عندك وهى Levelsمش هتكون ظاهرة وكل المشكلة دى هتتحل لو شيلت عالمة صح
ملحوظة :نفس الطريقة إلظهار السقف الساقط
نالحظ ان المستويات الجديدة مش هتظهر تحت فرع Plumbing
أصل البرنامج مش هيشم على ظهر ايدة ويعرف انت عاوز تظهرهم فين علشان كدة كل مرة هتدخل مستويات
جديدة هيظهرلك فى مكانHVAC
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
22
A
انت بقى هتكون بنقلهم وتحطهم فى المكان اللى حضرتك تحبة
طيب ان بقى عاوز انقلهم فى فرع Plumbing
تحدد المستويات اللى عاوز تنقلهم و بعد كدة تروح على قائمة Properties
)Discipline (Plumbing
)Sub Discipline (Plumbing
ولكن هنالقى مشكلة انك مش عارف تغيرDecipline /Sub Decipline
أول لما تالقى حاجة مقفولة افتكر علي طول تروح على View Template
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
23
انزل تحت فى قائمة
الخصائص هتالقى
View Template
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
24
A
Template
من االخر القفل دة معناه اية ؟؟
أنا بعمل قالب بمواصفات معينة اقولة انا عاوز اشوف دة ومشوفش دة
عاوزك تسمحلى اعمل كدة ومتسمحليش اعمل كدة
يعنى لما االقى Disciplineمش عارف اعدل فيها
دة معناه انى عامل قالب وقافل التعديل في الخاصية دى لو عاوز اغير ممكن اعدل
فيها عن طريق الضغط على Mechanical Plan
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
25
A
Template
زى ما شرحنا معنى القفل اية
هنالحظ وجود عالقة صح قدام خصائص اى حاجة قدامها صح
معناها انها مقفول التعديل فيها
ولكن لو عاوز اعدل فيها ممكن اشيل الصح من قدمها
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
26
A
بعد لما فتحت القفل عن الخاصيتين دول بالتحديد تالحظ فى قائمة الخصائص اصبح فى امكانك التعديل فيهم
وتقدر تغير
Discipline (Mechanical
) Plumbing
) Plumbing
Sub –Discipline ( HVAC
شوية مالحظات :
ال يمكن تعديل فى أسماء Disciplineدى األسماء األم
يمكن تعديل فى أسماء Sub –Discipline
هناك فرق بين) Plumbing (Discipline / Sub –Discipline
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
27
A
: Plumbingعلم يشمل اى حاجة فيها مواسير سواء كانت Plumbingبمعنى صرف صحى
أوFire Fighting
نالحظ ان المستويات تم نقلها فى المكان المناسب
وبعد كدة تقدر تدخلهم مرة ثالثة مثال لشغل Fire Fighting
وبكدة تم تصنيف الشجرة بتاعتك وتجهيزها للشغل
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
28
A
Create Template
2.2.
بعد لما تقوم بعمل إدخال األرضيات والسقف الساقط مرة فى مجال HVACومرة فى مجال Plumbing
طيب انا استفدت ايه حضرتك كدة .....
التقسيمة دى بتساعدك انك تعمل قالب لكل مجال بالطريقة اللى تحبها يعنى مثال ى مجال األتش فاك تعمل قالب
بمواصفات معينة تظهر فيها حاجات معينة وتخفى يها حاجات معينه وهكذا فى مجال البالمنيج
وبكدة يتيح ليك الفرصة انك تعرف تصمم كل برانش لواحدة ويكون فى نظام فى الشغل
وبعد لما تعمل تصميم للمجاالت كلها تعمل ما يسمى بال Collaborationبيوضح التداخالت فى المجاالت .
السؤال بقي دلوقتى إزاى اعمل قالب لكل مجال لوحدة؟؟
أوال لكل مجال انت بتعملة قالبين مش قالب واحد قالب لألرضيات وقالب للسقف الساقط حتى لو كانت
مواصفات القالبين زى بعض بس البرنامج نظامة كدة ان قوالب األرضيات مش زى السقف الساقط .
أوال:
ممكن تعمل قالب بمزاجك وتسمية بمزاجك – وممكن تعمل تعديل على القالب اللى موجود
طيب انا اعدل فى الرؤية إزاى يعنى اقول للبرنامج اشوف إيه وأخفى إيه من قائمةProject Browser
اضغط على الدور اللى عاوز تعدل فيه الرؤية وبعد كدة تضغط على االختصار VVأو VG
أو من خالل
Visibility Graphics
View
ثانيا:
بعد لما تتفح ليه قائمة Visibility Graphicsممكن تالقيها متفعلة للتعديل أو مش مفعلة
خدها قاعدة معايا من االول كدة علشان
ترتاح أول حاجه تفكر فيها لما تالقى
حاجة غير مفعلة (مقفولة)
يبقى المشكلة فى الغالب Template
فى
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
29
A
نالحظ ان القالب قافل التعديل فى Visibility Graphicsبمجرد انك تشيل الصح من قدامها تقدر تعدل فى اإلظهار
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
30
A
هتالقى هنا كل حاجة ليها عالقة بالرؤية يعنى هنا هتالقى مخارج الهواء و مجارى الهواء وهتالقى المواسير
وهتالقى العناصر الكهربية وهتالقى عناصر عمارة ومدنى
بمزاجك بقى تظهر ايه وتخفى ايه
اى حاجه قدامها صح يعنى بيقولك مسموح تشوفها فى المظهر دة
انت بقى بتقسمها بمعنى انت شغال أتش فاك يعنى المواسير ممكن تخفيها فى جزء االتش فاك
انت شغال بالمبينج يعنى مخارج ومجارى الهواء ممكن تخفيها ملهاش لزمة تسمح برؤيتها
وبعد لما تظبطVG
انت كدة ظبط الرؤية فى Level 1وبس
أنا بقى بعد لما اظبط الرؤية بتاعت الدور دة هعمل منها قالب وبعد كدة احدد كل االدوار الثانية وهقول للبرنامج
خليهم تابعين للقالب دة
وبعد لما اخلص األرضيات أكرر اللى عكلته بالظبط بس على السقف الساقط واعمل قالب لالسقف
وهكذا بقى فى مجال البالمنيج والفاير ....
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
31
A
إختارCreate Template from Current View
القالب اللى عملته يفضل انك تشيل الصح من قدام 6خصائص دول الهدف منهم المرونه فقط
..وبعد كدة كل ليفل فى المبنى هتروح قائمة
Project Browser
View Template
)القالب اللى حضرتك عملته( HVAC ASH Floor
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
32
CHAPTER 3
Modify Tab
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
33
A
Modify
3.1.
المجموعة األولى :دى عبارة عن Details Level (Fine) - Visual Style (Shaded) - Scale
المجموعة الثانية :ليها عالقة باخفاء العناصر واظهار العناصر
فرضا لو فى مجموعة من العناصر مختفية بقوم بالضغط علىReveal Hidden Element
قياس المسافات
غلق الشاشات اللى بتتفتح
خلف الشاشة الحالية
حفظ المشروع
لرؤية الخط
رفيع او
سميك
لعمل قطاع
فتح مشروع
الكتابة
للرؤية 3D
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
34
A
MODIFY
عمل محازاة
بضغط على خط اللى عاوز اعمل
ليه محازة ثم الخط اللى عاوزة
يروح ليه
عمل تقسيم
لو عندى Duct
وعاوز اعمل Sizing
عمل تثبيت
للمشروع
بتحدد مجموعة مع
بعض وتضغط على
Selection Box
بيظهر المجموعة دى
3Dفقط
عمل مراية
بطريقتين اما باستخدام
خط مرسوم مسبقنا او عن
طريق رسم خط مستعار
القيام بعملية النسخ عن
طريق تحديد الشئ المراد
نسخه والضغط على نسخ
لطق ما تم نسخة فى
المكان المحدد سواء فى
نفس المستوى أو مستوى
اخر يتم تحديدة
عمل مسح
عمل مد وقص الزيادات
يستخدم لتسهيل الرسم
عمل تدوير
بقوم بالضغط على الجزء
اللى عاوز أدورة ثم اضغط
على تدوير ثم اضغط على
المكان اللى هدوره ثم اتحكم
فى زاوية الدوران
Eng: Ahmed M. Shuhayb
عمل نسخ(تكرار)
بقوم بالضغط على الجزء اللى عاوز
انسخه ثم اضغط على نسخ ثم اضغط
على المكان اللى هنسخ ثم احركه الى
المكان المراد نسخه فيه
عمل تحريك
بقوم بالضغط على الجزء اللى عاوز
احركه ثم اضغط على تحريك ثم
اضغط على المكان اللى هحرك منه
ثم احركه الى المكان المراد نقله لية
Eng: Ahmed M. Abd-elaal
35
A
System
رسم األكواع على المواسير
كوع 90او كوع 45
إلدخال أجهزة الصرف الصحى
مثال األحواض والبانيو وWC
3.2.
رسم Fiitingعلى
مجارى الهواء
رسم المواسير
لرسم مخرج الهواء سواء
Difusserاو Grile
وتحديد أبعادها
رسم مجرى الهواء
رسم مجرى الهواء
المرن
وضع الصمامات و
Fittingالمختلفة
على خط المواسير
لرسم رشاشات
الحريق
رسم مجرى الهواء
على شكل خط
ادخال الماكينات زى
وحدة التكيف
AHU Or FCU
رسم الوصالت
المرنة للمواسير
رسم المواسير عبارة
عن خط
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
36
CHAPTER 4
HVAC System
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
37
A
4.1. HVAC- Mechanical Setting
هتعمل مجموعة من االعدادت
هتعمل اعدادت فى كيفية
اظهار االبعاد يعنى مثال لو
طول وعرض Ductكتبت
هيكتتب ايه جنبه عاوز يكتب
قبل البعد وال بعدة
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
38
A
هتعمل اعدادت فى رسم Duct
يفضل هنا السماح برسم اى زاوية
الن مجارى الهواء تصنع فى
الموقع فمن الممكن تصنيع اى
زاوية
على عكس Pipeيفضل جعل
الرسم يسمع بزاويا محددة
علشان Fittingبتشترها من
المنصع
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
39
A
4.2. HVAC- Routing Preferences
المقصود هنا هى Fitting
لو انت فاتح المشروع من االساس قالب معمارى او مدنى هتالقى Routing Preferencesكلها None
وهتقوم بتحميلها من مكتبة البرنامجRVT
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
40
اللى هتشتغل بيها فى المشروعFitting هىRouting Preferences ببساطة
فمن االفضل تظبطها فى البداية علشان تتعمل اتوماتك وانت شغال
هتحدد انت ناوى تشتغل
مقاس اية بالظبط........ Elbow – Cross – Transition
Fitting مسار تحميل
C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric\Duct\Fitting.
: Fitting المسار لتحميل
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
41
A
HVAC- Create Duct System
4.3.
نروح على قايمة Systemونوزع مخارج الهواء فى المكان اللى محتاج اكيفة
فى حالة لو ملقتش مخرج هواء مناسب حسب التصميم بتاعى بدخل Load Family
وادخل فى المسار بتاع المكتبة هتالقى مخارج الهواء فى المسار االتى
\C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric\Mechanical
Air-SideComponents\AirTerminal
هتضغط على مخارج الهواء وتروح قائمة الخصائص وتحدد
Levelاللى انت عاوزه يتحط عليه Offset -وتحدد ارتفاعة كام من اليفل دة
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
42
هنضغط علىFCUبعد كدة هتدخل ماكينة التكيف ومثال وحدة مناولة هواء
Mechanical Equipment
Load Family
C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric\Mechanical\
Air-SideComponents\TerminalUnit
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
43
A
اضغط على أى مخرج هواء -هيظهر ليك كلمة Ductاللى متحددة فى المربع األحمر
اول لما تضغط على كلمة Duct
هيظهر ليك المستطيل دة
اعمل عالمة صح على
Open in System Editor
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
44
A
هيفتح ليك القايمة دى هتعمل حاجتين
1- Add to System
هتضغط على كل مخارج الهواء اللى
عاوز تحطهم فىSystem
2- Select Equipment
هتضغط على ماكينةFCU
بعد لما تعمل Create Duct System
هتضغط على أى مخرج هواء من ضمن Systemوتعمل (Tabالزرار دة فى الكيبورد فوق ( Shift
هيظهر ليك الشكل الموجود فى الصورة دى هتضغط علىGenerate Layout
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
45
A
هتالقى اقتراحات كتير لرسم ) Systemانت هتختار الشكل اللى هيكون فى اقل مشاكل وسهل فى التصميم والتنفيذ )
هيظهر ليك الشكل دة توصيل
اتوماتك هتكون محتاج تعمل
تعديل فية ابعاد Duct
تقدر تضغط علىDuct
هتالقى امكانية تغير ابعاد الداكت – امكنية تغير ارتفاع الجاكت من اليفل اللى هو فية
ملحوظة :
هو البعد اللى انت شايفة فى المسقط قدامك Width
هو بعد عمق الداكت اللى مش بيكون ظاهر غير فىHeight 3D
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
46
A
HVAC- Duct Sizing
4.4.
اضغط على أى حاجة فى Systemبعد كدة اضغط Tabعلشان تحدد المشروع كلة
Filterادخل اتاكد ان كل حاجة متحددة اال ماكينة التكيف ومخارج الهواء
بعد كدة هتضغط على Duct Pipe Sizing
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
47
Duct Sizing هتحدد طريقة
وفى الغالب الطريقة االشهر
هتكون
Equal Friction
Sizing دة شكل التصميم بعد ال
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
48
A
هنضغط على الماكينة هنالحظ ان وحدة مناولة الهواء ليها مدخل لمصدر الكهرباء
وليها مخرج هواء بار ومدخل هواء راجع ومدخل ومخرج مياة مبردة متوصلة بوحدة الشيلر
الطبيعى اننا نعمل خط الراجع
هنضغط على Air Terminalوندخل Return Grille
لو ملقتش المقاس المناسب او النوع المناسب من الممكن انى ادور علية فى المكتبة او اقوم بتعديل عليها
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
49
A
عمل عملية قياس وهضغط على EQعلشان المسافات تكون متساوية
نالحظ ان هناك اختالف فى شكل Return & Supply
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
50
: خطوات التعديل على مخرج هواء
12345-
Select Diffuser (Grille)
Edit Type
Duplicate
Rename (600*600Face 450*450 Neck)
Modify ( Width- Height)
ولكن بطريقة مانولDuct System من الممكن رسم
Draw Duct ثم اختارRight Click هتضغط على مخرج الهواء
وتتحكم فى ابعاد الداكت كمانOffset تقدر وانت شغال تتحكم فى ارتفاع الداكت من خالل
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
51
A
بعد لما رسم داكت الراجع بدأت من اول
Grilleوبعد كدة عديت على تانى واحدة
ولكن متوصلت بالداكت
هضغط على Grille
ثم اضغط على Connect Into
واضغط على الداكت هتتوصل اتوماتك
دة شكل شبكة التكيف بعد لما خلصت بشكل سريع هنالقى ان الريفت برنامج بتعامل مع معلومات بيوضحلك خط
السبالى بلون ازرق وخط الراجع بلون بنك ومن السهل تغير االلوان ودة هنتعرف عليه قدام فى الكتاب
ملحوظه فنية
Supply = 4 Diffuser
Return = 2 Grille
والطبيعى ان لو دخلت اوضة 1000 CFMمحتاج اخدهم على خط الراجع تانى
ولكن الحكمة فى التصميم اللى ممكن تكون اخدت بالك منها ان
Supply 300*300 Neck
Return 450*450 Neck
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
52
A
شوية نصايح وانت جاى ترسم شبكة التكيف
-خلى بالك انت واقف فىLevelكام .
من الممكن الشغل بتاعك ميظهرش هتروح تشوف Visibility Graphicوتتاكد انهم مرئين . -هيحصل مشاكل فى الرسم العالج بتاعها هو .Offset
Fitting -من الممكن تعمل خطأ لو كانت المساحة صغير فالزم تراعى دة فى التصميم .
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
53
A
HVAC- Duct Accessory
4.5.
هتالقى داخل مكتبة البرنامج العديد من Duct Accessoryمثل Damper
هتضغط علىDuct Accessory
وتروح قائمة الخصائص
وتختار النوع المناسب ليك
او تحمل من المكتبة
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
54
A
كل اللى هتعمله انك هتحط الدامبر فى المكان المناسب الداكت
ومن الممكن اضافة جميع انوع Accessory
ونراعى المكان المناسب ليهم
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
55
A
لوضع العزل الداخلى والخارجى للداكت بمجرد الضغط عليه تظهر االيقونة دى
عبارة عن العزل الخارجى Insulation
عبارة عن العزل الداخلى Lining
هتحكم فى نوع العزل والسمك بتاع العزل
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
56
A
هعمل Sectionعلشان اشوف سمك العزل فعال
بعد لما ارسم اتجاء السكشن هضغط على رأس المثلث بتاع السكشن هيودينى للصورة التانية دى
اللى ظاهر منقط دة هو عبارة عن العزل الداخلى
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
57
CHAPTER 5
Shop Drawing
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
A
58
5.1. Shop drawing- Sheet
. وكتابة االبعاد عليها و التفاصيل مثل معدل التدفق والضغوط وخالفة2Dطريقة عمل اللوح
View – Sheet
طيب لو انا عاوز مقاس لوحة تانى هدخل على مكتبة البرنامجA1 Sheet هتالقى
C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US Metric\TitleBlocks
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
59
A
هيفتح معايا لوحة بالمقاس اللى حددته ليه (ممكن اعمل تعديالت فى اللوحة واكتب معلومات عن المشروع واسم
المهندس المصمم والشركة والمالك والتاريخ واسم اللوحة والعديد من البيانات ودة هالقية على يمين اللوحة) .
لو عاوز اعمل لوحة ليفل 1فى مجال االتش فاك مثال (هروح ليفل واحد واسحب الليفل احطه فى الشيت) .
هالقى مقاس اليفل معمول بمقياس رسم 1:100
لو عاوز اعدل فى مقياس الرسم هروح لقائمة الخصائص واعدل فى مقياس الرسم ...
ولكن فرضا لو لقيت امكانية التعديل في مقياس الرسم مقفولة
ارجع للباب التانى من الكتاب وهتعرف ان اى حاجة تالقيها غير مفعلة يبقي المقتاح هتالقية في القالب بتاعها
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
60
View Template
View Template هروح من قائمة الخصائص على
View Scale واشيل الصح من قدام
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
A
61
5.2. Shop drawing- Annotation
مثالDuct أوDiffuser الية بالضبط يعنى مثالTag وهتختار انت عاوز تعملTag All اضغط على
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
62
A
عملت (Diffuser – Equipment)Tag
انا عاوز المعدات لما اجى اعملها تاج يظهر اسم النظام التابع للماكينة فقوم بالضغط على الماكينة وبعد كدة
اعمل Edit Family
هيتفتح الصفحة دى اضغط على 1iوبعد كدة اضغط على Edit Label
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
63
اختار انت عاوز بقى لما تجى تعمل تاج يظهر ازاى المثال دة مثال هيظهر
Mark – System Classification –Name
Load into Project بعد كدة تضغط على
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
64
A
بعد لما تعمل Tag Allللعناصر بتاعت المشروع وتحدد االبعاد وكل التفاصيل
اللوحة دة لو هتالقيها اتحفظ فى قائمة Project Browserتقدر تروحلها فى الوقت اللى عاوزة
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
65
A
تقدر تحفظ اللوحة دىPDF
بشرط تحمل ملف بسيط بمجرد تحميلة هو بيدخل جوة برنامج الريفت
إسم البرنامج Bull zip PDF Printer
خطوات حفظ المشروعPDF
Ribbon – Print – Print
اضغط Setup
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
66
A
ضبط االعدادت كاألتى
وبعد كدة احفط الملف فى المكان اللى تحبة وهيفتح معاكPDF
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
67
CHAPTER 6
Fire Protection
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
68
A
6.1. Creating Fire-Protection Systems
هى عملية مكافحة الحريق عن طريق توزيع الرشاشات فى المبنى على مسافات محددة لوصول المياه بكمية
محددة وضغط محدد..
خطوات رسم الشبكة ببساطة ...ورقة وقلم واكتب ورايا ...
)1نقوم بتوزيع الرشاشات فى المبنى على السقف الساقط وذلك بعد معرفة عدد الرشاشات طبقا لكودNFPA
خلى بالك بقى من شوية حاجات أن الرشاشات فى منها اللى بيتحط على الجدار وفى اللى بتحط على مستوى انا
اللى بحددة وفى رشاش بيتحط على السقف الساقط مباشرة
لو محتاج نوع معين من الرشاشات ممكن ادخل على Load Familyواحمل اللى أنا عاوزة
الرشاشات فى منها Unhostedومنها Hostedالنوع Hostedمش محتاج احدد Offset
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
69
A
الطبيعى ان الرشاشات توضع على بداية السقف الساقط والمواسير بتاعته ارتفاعها اعلى من ارتفاع السقف الساقط بقيمة تقديرية
تتناسب مع االكواع اللى هتتعمل للتوصيل بين راس الرشاش والماسورة
)2توزيع الرشاشات بشكل منظم طبعا لالكواد
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
70
A
ببساطة التكرار اللى انتم شايفينه دة هو عبارة عن رشاش واحد فقط وعملت ليه نسخ
راجع الباب الثالث من الكتاب قائمةMODIFY
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
71
A
)3اضغط على الرشاش هيظهر قائمةPiping
هتعمل نظام مواسير ومتنساش تعمل صح قدامOpen in System Editor
ليتيح لك الفرصة الدخال باقى الرشاشات داخل الSystem
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
72
A
)4بعد لما حطيت كل الرشاشات داخل نظام واحد هقوم بالضغط على اى رشاش منهم وبعد كدة اضغطTab
لغايه لما يتحدد معاك كل الرشاشا زى الصورة الحلوة دى
هيظهر ليك Generate Layoutجوها مجموعة من المقترحات اللى تقدر تختار منها شكل الشبكة
تقدر تختار من المقترحات دى بمزاجك هتالقى فى منهم اللى يعمل مشاكل فى التوصيالت وفى منه المناسب
تقدر تتحكم فى ارتفاع الماسورة االساسية والمواسير الفرعية من أيقونة Setting
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
73
A
الطريقة دى هى رسم الشبكة اتوماتيك وطبعا زى ما فى اتوماتك فى مانول زى Duct
شكل الشبكة3D
طريقة رسم الشبكة مانول ( هترسم ماسورة على ارتفاع مناسب )
وبعد كدة هتضغط على رشاش رشاش وترسم منه ماسورة وتوصلها للماسورة االساسية
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
74
A
نالحظ ان Main Pipe – Branch
بيكونوا على Offsetاكبر من مستوى الرشاش
طبعا هنا الوضع مختلف يفضل فى حالة المواسير طريقة الرسم االتوماتك لالنجاز فى العمل
وبعد لما ترسم الشبكة الزم تعمل Sizingللشبكة طبقا للكود
من الكود ملهاش عالقة بصميم الريفت دة تابع لكورس الفاير فايتنج
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
75
CHAPTER 7
Plumbing
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
76
A
7.1. Creating Plumbing Systems
نظام الصرف الصحى مكون من االتى
-1نظام المياة الباردة
-2نظام المياة الساخنة
-3نظام الصرف للمياة
أول خطوة معانا هى ان نتعرف على مكان الحمامات والمطابخ فى المشروع
نعمل Tag Room
هيظهر لينا اماكن الحمامات والمطابخ
Urinal- Bath Tub – Water Closet – Lavatoryهنقوم بعمل فرش للحمام بمعنى ادخال طقم الحمام..
المسار:
C:\Program Files\Autodesk\Revit 2016\RVT 2016\Libraries\US
Metric/Plumbing/MEP
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
Eng: Ahmed M. Abd-elaal
77
Eng: Ahmed M. Shuhayb
78
A
يتم توزيع مكونات الحمام فى المكان ونراعى المنطق فى التوزيع يعنى متحطش
Water Closetفى وش الباب
بعد كدة تشوف االجهزة اللى داخل ليها مياه ساخنة ومياىدة باردة وتحددهم كويس علشان ترسم شبكة المياه
الساخنة لوحدها وشكبة المياه الباردة لوحدها
هتدخل المشروع خزان مياة باردة وسخان
وبعد ادخال كل حاجة ليها عالقة بالمياه ناقص حاجة واحدة فقط ونبدأ نرسم
هو تظبيط اعدادات المواسير علشان البرنامج يفرق بين انواع المواسير المختلفة
Project Browser – Family – Pipe System
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
79
A
هتدخل على كل نظام وتحدد اللون اللى انت عاوزة يظهر بيه
وبعد كدة هتعمل ما يسمى ب Filterمن خالل Visibility Graphic
أى نظام مياة قدامه عالمة صح هو النظام المسموح له بالرؤية
لية بنعمل كدة علشان فى انواع كتير من المواسير بكل نوع بنعملة فلتر علشان يظهر فى المشهد دة وال ال
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
80
A
نقوم بوضع الخزان علي Roofونخرج منه ماسورتين
ماسورة تكون مصدر مباشر للمياة الباردة للوحدات الصحية
والماسورة الثانية تكون مصدر المياة للسخان
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
81
A
نقوم بوضح السخان فى الحمام ويكون ليه مدخل مياة بارة ومخرج مياه ساخنة
ونخلى بالنا ان السخان بيتم وضعة على offsetمرتفع من سطح االرض
ونقوم برسم لكل وحدة صحية خط المياة الباردة والصرف وخط المياة الساخنة ان وجد
وبعد كدة هتجمع كل خطوط المياة الباردة على ماسورة واحدة وربطها بالماسورة اللى جاية من التانك
من الممكن أو من المأكد ان هيقابلك مشاكل فى التوصيل زى ان ارتفاع ماسورة Bath Tubمختلف عن ارتفاع
ماسورة Urinalحل المشكلة دى ببساطة انك هترسم الماسورة بتاعت Urinalوقبل لما توصلها ب Bath
Tubاعرف ارتفاع ماسورة Bath Tubوارسم من نهاية ماسورة Urinalماسورة بنفس االرتفاع بتاع
Bath Tubعلشان نعرف نوصلهم كلهم ببعض وهكذا بباقى النظام
هتالحظ أن المواسير هتالقيها طالعة نازلة فى الجدار
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
82
A
من النصائح المهمة للرسم أنك الزم تعمل سكشن أفقى ورأسي
علشان نعرف نرسم المواسير المختلفة زى المشهد دة مثال فاالفضل نرسم في السكاشن
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
83
A
نالحظ توصيل الشبكة المياة الباردة والساخنة
ومتبقى الصرف
من األشياء اللى قررت اعملها غلط علشان تنتبة ليها هو وجود WCبيكون قريب من المساقط(المناور)
علشان ماسورة الصرف بتاعه بتكون كبيرة
هندخل للمشروع Sinkبالعة يعنى
هنجمع صرف االحواض والبانيو والمبولة فى البالعة دى
وصرف WCلوحدة
متنساش مواسير الصرف بيتعملها Slope
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
84
CHAPTER 8
Schedules
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
85
A
8.1. Schedules
بعد لما المشروع خلصناه محتاجين نعمل حصل للكميات وللتكاليف ودى من قوة برنامج الريفت
زمان قبل ظهور الريفت كان عملت الحصر بتم مانول دلوقتى أقدر اقولك انت بضغطة زرار هتعمل جدول بأى
حاجة فى المشروع
اختار نوع الجدول اللى عاوز تعملة علشان المشروع بتاعك فيه حاجات كتير جدا
وليكن هنختار Duct
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
86
A
هنختار احنا عاوزين الجدول يكون فية معلومات ايه
هتالقى عندك Available fieldsهتضغط على الحاجة اللى عاوزها تظهر فى الجدول وتعملها Add
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
87
A
الجدول ظهر بالمنظر دة من غير أى تنظيم ..احنا بقى مع بعض هنظم الجدول دة علشان يكون شكلة محترم
هنروح على قائمة الخصائص ونضغط على Edit Sorting/Grouping
بيقولك هنا يانجم النجوم انت عاوز تقسم الجدول طبقا الية مثال انا هقولك طبقا Widthهو بقى هيرتب كدة
الجدول حسب العرض اما تنازلى او تصاعدى حسب اختيارى
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
88
A
فى اختيار تحت اسمة Grand Totalsدة بيعمل جمع للعناصر علشان يعرفنى مثال انا عندى كام Duct
عندى مثال كام Diffuser
هتالقى تحت مكتوب Itemize every instanceلو لقيت محطوط جنبها عالمة صح هتالقى الجدول
معروض بشكل كبير بمعنى
لو عندى 10 Diffuserمن نفس المقاس ونفس كل حاجه هتالقيهم مكتوبين فى 10سطور ومكتوب الكمية من
كل Diffuserواحد فقط
أما لو شيلت الصح هيعمل الجدول مدموج يعنى هيكتب سطر واحد مكتوب فيه مقاس Diffuserوعددهم 10
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
89
A
نالحظ أن الجدول بقى منظرة منظم اى مقاس Ductليهم نفس Width
نالحظ ان قدام Headerيوضع عالمة صح
طيب دى لزمتها ايه ؟
هتالقى مكتوب مثال ) (350وتحتها الكمية والتفاصيل
وهكذا مع ( ...)450الخ
نالحظ لو سيبنا الصح قدام Itemize every instance
الجدول هتالقية كبير على الفاضى وكاتب قدام كل حاجه الكمية 1حتى لو فى زيها 100
علشان كدة يفضل انك تشيل الصح علشان الجدول يكون مختصر ومنظم
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
90
A
لو ضغطت من قائمة الخصائص على Edit Filter
لو عاوز اظهر حاجة محددة فقط فهنا مثال ظهرت كل Ductsاللى Widthيساوى 350
لو أنا عاوز اعمل تميز لمقاسات محددة مثال من خالل الضغط على Formatting
وحدد انت هتميز مثال Widthواضغط على Conditional Formatting
واعمل العالقة اللى هتحدد بيها واختار اللون ونالحظ ان انا قولت للبرنامج
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
91
A
أى Widthمقاسه من مقاسه من 350 to 400يكون متلون باللون األحمر
نالحظ فى الصفحة السابقة أن ابعاد ال Ductكانت بتكتب من غير وحدة قياس يعنى مش عارف cm / mm
من خالل Formatهتحدد نوع الوحدة وكمان هتظهر ازاى
وبكدة انت عملت الجدول وتقدر الرجوع لية باستمرار من خالل قائمة Project Browser
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
92
A
هتالقى هناك كل الجداول اللى عملتها فى البرنامج
نالحظ وجود جدولين جدول Air Terminal
وجدول Duct
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
A
93
CHAPTER 9
Work Set
Eng: Ahmed M. Abd-elaal
Eng: Ahmed M. Shuhayb
94
A
9.1. Work Sets
من قوة برنامج الريفت انة بيتيح المناخ المناسب لعمل مجموعة من المهندسين على Central File
كل مهندس ياخد من الملف المركزى نسخة تسمى ب Local File
الميزة دى بتساعد ان كل مهندسى المشروع بيكونوا شايفين بعض وشغالين مع بعض ومفيش حد يقدر يحرك
حاجه مش بتاعته اال بطلب من صاحبها الما يوافق او يرفض
تخيل بقى زمان ايام االتوكاد كان كل واحد شغال لوحدة فى وادى وفى االخر يجو يتشاكلوا مع بعض اما دلوقتى
الوضع مختف فى Coordination
إعمل عدد ال نهائى من Work Set
: Editadleمعناها هل Work Setدى ملكك والال نالحظ علشان انا اللى عمال كل Work Setعلشان
كدة كلهم ملكى
: Ownerدة إسم المستخدم :Borrowers -دة إسم الشخص اللى بيطلب تعديل على Work Setبتاعتك
بعد كدة اعمل حفظ للملف المركزى دة وهيكون Central File
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
95
A
وبعد كدة اعمل Relinquish All Mineدة معناها ان انا تنازلت عن ملكيتى لكل Work Set
:Synchronizeدة حاجة زى Saveبالظبط ولكل بتعمل حفظ فى الملف المركزى وكل الناس اللى شغال فى
المشروع هتشوف اخر التعديالت
:Editing Requestsفى حاجه لوحد طلب منك انك تسمحلة بالتعديل فى حاجة بتاعتك الما تقبل الما ترفض
دة شكل طلب التعديل Grantيعنى موافق Denyيعنى رافض
لما اجى افتح المشروع علشان اشتغل فيه هفتحة كنسخة Local
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
96
A
بعد كدة هفتح المشروع وهروح على :
Work Set
Collaborate
واختار Work Setاللى انت عاوز تمتلكها متنساش تعمل Synchronize
فى بعض االحيان بكون محتاج أفصل النسخة بتاعتى عن Central File
من خالل Detach From Central
Eng: Ahmed M. Shuhayb
Eng: Ahmed M. Abd-elaal
97
A
حاجة مهمة جدا لو ملف المعمارى اللى أنت سحبه اتغير مكانة كل اللى هتعملة االتى :
من قائمة Manageونختار Manage Links
اضغط على اللينك وبعد كدة تعمل Reload Fromوتروح للمسار الجديد
تم بحمد هللا تعالى االنتهاء من كتاب ريفت ميب بالعربى ونتمنى من هللا عز وجل التوفيق لنا ولألمة العربية
ترقبوا بمشيئة هللا الجزء الثانى من كتاب ريفت ميب بالعربى هنشرح فية مشروع كامل وهنشرح فية الجزء
الخاص بعمل Family
Mail: ahmedshuhayb6@gmail.com
Phone: 01021522921
Eng: Ahmed M. Shuhayb
Eng: Ahmed Shuhayb
BIM Engineer
Eng: Ahmed M. Abd-elaal
NAVISWORKS
Navisworks
برنامج النافس وركس يستخدم في تكنولوجيا BIMويستطيع عمل البعد الرابع وهو الزمن والبعد الخامس هو حصر الكميات و التكلفة
باإلضافة الى عمل انميشن للمشروع وحل كل التعارضات بصورة اقوي من برنامج الريفت
NWDمساحتها صغيرة
يحتوي على النموذج modelمع review markupsبمثابة لقطة للوضع الحالي
يمكن وضع كلمة سر ,ال يحتاج الملفات االساسية ,حجمه اكبر ,مستقل بذاته يمكن اعطائه وقت صالحية و بعد فتره ال يفتح
NWFيحتوي على وصالت لملفات المشروع ,فضال عن review markups .ال يوجد نموذج بداخله
يتم حفظ geometryمع ، NWFمما يؤدي إلى حجم ملف أصغر منNWD
NWCملف ذاكرة التخزين المؤقت التي تم إنشاؤها عند التصدير من برنامج الريفت
احفظ الملف بامتدادNWF
عند تنفيذ المهام مثل عمل محاكاة قم بعمل حفظ بأسم و احفظ بامتدادNWD
عن تسطيب البرنامج ينزل تلت ايقونات للنافس
Autodesk navisworks manage
بيعمل كل حاجة (عشان كدة ده األساسي عندنا )
Autodesk navisworks simulate
بيعمل محاكاة و ال يمكنه حل التعارض
Autodesk navisworks freedomللرؤية فقط و مجاني
EUC
Eng- Ahmed M.Shuhayb
01021522921
عند تنصب ال Navisworksستجد ان لديك اضافه بالريفيت و ذلك في ال addins
navisworksللتصدير لبرنامج النافيسوركس
navisworks 2019عندما تريد تعديل ما قمت بتصديره ,يقوم بعمل مزامنة مع ملف النافيسوركس
االن دعنا نمرح قليال و نختار NAVISWORKS
االن ما رأيك أن نضغط معا على navisworks settings
كال لن تجد بابا نويل بل اعدادات التصدير للنافيسورك ,ظننت هذا واضحا
EUC
Eng- Ahmed M.Shuhayb
01021522921
االختيارات واضحه و االختار االهم EXPORT
ENTIRE PROJECTالمشروع كامال
CURRENT VIEWالفيو الحالي
SELECTIONالجزء المحدد فقطذ
CONVERT LINKED FILESهل يتم تحويل الملفات المرتبطة ايضا
و االفضل ان نصدر كل ملف مستقل عن االخر
التصدير يكون المتداد NWC
االن دعنا ننتقل من الريفت الى النافيسوركس و نستدعي الملف
من APPENDسنختار APPENDاول مره قديأخذ وقت ,يفضل السحب على اجزاء لو امكانية الجهاز ضعيفة
MERGEلو اردت ملفين في نفس المكان
EUC
Eng- Ahmed M.Shuhayb
01021522921
هناك انواع عديدة من الملفات يمكنك التعامل معها و استيرادها
EUC
Eng- Ahmed M.Shuhayb
01021522921
SELECTION TREE
االن ننشط الخيار SELECTION TREEلتظهر لنا النافذة التى تسهل علينا اختيار العناصر ,و الننا قمنا باالستيراد من الريفت فستجد
المشروع كله منظم و مرتب
تجد في الصورة SELECT ALLطبعا دي لتحديد الجميع
يمكنك تحديد العناصر بدقة من Find Items
EUC
Eng- Ahmed M.Shuhayb
01021522921
و يمكننا اظهار و اخفاء العناصر من
عندما تحدد عنصر تظهر لك تاب جديدة
SWITHBACKاستدعاء العنصر من ملف الريفيت بأخر التعديالت
FOCUS IN ITEMالتركيز على العنصر
ZOOMعمل زوووم
HIDEاخفاء & TRANSPARENCYدرحة الشفافية
REST APPEARANCE
اعادة العنصر لخصائصة االولية
ADD LINKاضافة لينك & EDIT LINKالتعديل عليه
RESETLINKSاعادته الصله
Viewpointستجد اختيار Enable Sectioningسيجعلك تاخذ SECTIONفي الشكل
يمكنك من MODEاختيار هل سيكون مكعب او قطاع
و يمكننا من خالل
MOVEتحريك السكشن
ROTATEاو لفه
SCALEاو تغير حجمة
EUC
Eng- Ahmed M.Shuhayb
01021522921
HOME
LINKSاظهار الوصالت ,لتضغط عليها لتري الملف المرتبط بالعنصر
QUICK PROPERTIES
PROPERTIES
خصائص بسيطة و مختصرة
قائمة الخصائص
و يمكننا تخصيصه من الOPTION
من قائمة الخصائص يمكننا اضافه خاصية جديدة
EUC
Eng- Ahmed M.Shuhayb
01021522921
لو اردت رؤية او اخفاء االكسات عليك بالذهاب الى VIEWو منها الى SHOW GRID
كما يمكنك تحديد رؤيتها في اي دور
ستجد لديك FULL SCREENلرؤية كامل العمل بدون اي اشياء مشتته
حسنا لو اردت الرجوع يمكنك ان تضغط F11
SPLIT VIEWلجعل لديك شاشتين ,اما راسيين او أفقيين
يمكننا من HUDاظهار
EUC
Eng- Ahmed M.Shuhayb
01021522921
VIEWPOINT
يمكننا اخذ SAVE VIEWPOINT
تظهر لنا نافذة
يمكننا اخذ اكثر من صورة ,من اكثر من جهه
االن نضغط بالزر االيمن للماوس و نختار من القائمة المنبثقة ADD ANIMATION
االن قم بسحب كل اللقطات الى مجلد االنيماشن الذي انشئته منذ ثوان
يمكنم اضافة add cutلتوقيف المششهد لثواني
تمام االن من VIEWPOINTقم بتشغيل الفيديو
EUC
Eng- Ahmed M.Shuhayb
01021522921
REVIEW
يمكنك وضع بعض الكلمات و العالمات
من قائمة VIEWPOINTيمكننا اختيار هل تريد ان تري المبني
ORTHOGRAPHICهندسي ال فرق بين اي ضلع اقرب للكاميرا
PRESPACTIVEكما في الحقيقية ,حيث يكون االقرب هو االكبر
يمكننا اضافة شخص ظريف الى المبني
من خالل اختيار
REALISM
يسير على االرض GRAVITY
ال يعبر الحوائط COLLISON
و االختيار بين الطيران و المشي FLY - WALK
LOOK AROUNDلف حول العنصر
LOOK ATاالنتقال الى العنصر
FOCUSتركيز الرؤية على نقطة
EUC
Eng- Ahmed M.Shuhayb
01021522921
SET
تساعدنا في تحديد مجموعة عناصر و اعطائها اسم محدد يمكننا من خالل هذا االسم التحكم فيها
من HOMEستجد SETSو من السهم الصغير ستجد MANAGE SET
االن يمكننا انشاء تحديد لمجموعة من العناصر من SELECTION TREEثم انشاء اسم لهم في SET
EUC
Eng- Ahmed M.Shuhayb
01021522921
Time Liner
add task يمكننا اضافه مهمه جديدة
ms project , primaveraلربط نموذج الريفت بملف المشروع الزمني مثل
add نختارdata sources و منtime line نذهب ل
EUC
Eng- Ahmed M.Shuhayb
01021522921
في التايم الين نحددtask type
Constructفي مرحلة البناء
Demolishمرحلة الهدم
Temporaryمؤقتة
من tasksنجد خاصية مهمة auto attach using rules
يمكنك عمل قاعدة لربط المهام بالعناصر مثال ربط المهام بالعناصر التى في SETبنفس االسم
EUC
Eng- Ahmed M.Shuhayb
01021522921
نضغط على settings
لنحدد متى تبدأ و تنتهي المحاكاه
عمل ال RENDER
الريندر في النافيس يعتمد على
البريسيسور او المعالج
EUC
Eng- Ahmed M.Shuhayb
01021522921
Clash Detective
من HOMEنختار
نختار add testو نحدد العناصر التى سنعمل على اساسها اكتشاف التعارض
Hardداخلين في بعض
Clearanceالمسافة الى بينهم
Duplicateتكرار
EUC
Eng- Ahmed M.Shuhayb
01021522921
االن نذهب الى التقرير
Report typeهل تريد تقرير عن المشاكل بقاعدة الكشف الحالية ام الجميع
currentالحالي
all compجميع التقارير متداخلين
all sepratكل التقارير و لكل كل تقرير مستقل بذاته
Report formatنزع التقرير هل هو ملف نت ام xml
write reportاضغط هنا للتصدير
التصدير
يمكن من هنا الطباعة و تصدير الصور و الفيديو
للتصدير الى الماكس نختار التصديير الى fbx
EUC
Eng- Ahmed M.Shuhayb
01021522921
Quantification
هو عمل حصر للكميات الموجودة للمشروع
تضغط علي Project Setupوتختار الكتالوج المناسب ليك
EUC
Eng- Ahmed M.Shuhayb
01021522921
هتالقي تقسيمة الكتالوج
لعمل حصر لحاجة معينة
EUC
Eng- Ahmed M.Shuhayb
01021522921
لعمل حصر للمشروع كلة
لعمل تصدير للحصر لشيت اكسيل
EUC
Eng- Ahmed M.Shuhayb
01021522921
استرجاع ملف نافيس وركس ضرب
Automatically Save and Recover Autodesk Navisworks Files
النافيس وركس مثل الكاد
يحتفظ بملفات باك احتياطية في مجاد على الويندوز
بهذا الشكل
.AutoSave
و عندما يقف بصورة غير متوقعة نتيجة قطع كهرباء مثال ثم اعادة فتحة تظهر لك رسالة
و يمكنك تغير المسار من
من Option
EUC
Eng- Ahmed M.Shuhayb
01021522921
ENGINEERS UNION
أشهراالختصارات AutoCAD
رسم الخط المستقيم بمعلومية نقطتين
لرسم خط مزدوج متوازيين
لعمل تعديالت على الخط المزدوج
لرسم دائرة
لرسم مستطيل
عمل قطع ومسح لألجزاء الزيادة
عمل تكملة لألشكال الهندسية
عمل نسخ
عمل نسخ متطابق
عمل تدوير لألشكال
عمل كسر سوكه احرف ملساء
عمل كسر سوكه على زاوية
عمل بلوك لألشكال
عمل تفجير للبلوكات
عمل تحريك
عمل تهشير
عمل نسخ للخصائص
عمل استطالة وتقصير لألشياء
لرسم االقواس
لعمل تكرار على مستقيم او مسار دائري
عمل مسح
عمل تعديل على االبعاد
لمعرفة احداثيات
لقياس االبعاد
عمل االبعاد كلها من نقطه مرجعية
عمل كسر لالبعاد على خطوط الرسمة
تكملة كتابه االبعاد بسرعة
جعل المسافات متساوية بين االبعاد
كتابة االبعاد بسرعة
تحويلLine To Polyline
عمل ادخال للبلوكات
لعمل اسهم
كتابة النصوص
L+ Enter
Ml+ Enter
Mlst+ Enter
C+ Enter
Rec+ Enter
Tr+ Enter
Ex+ Enter
Co+ Enter
Mi+ Enter
Ro+ Enter
F+ Enter
Cha+ Enter
B+ Enter
X+ Enter
M+ Enter
H+ Enter
Matc+ Enter
Str+ Enter
A+ Enter
Ar+ Enter
E+ Enter
D+ Enter
Di+ Enter
Dim+ Enter
Dimb+ Enter
Dimbr+ Enter
Dco+ Enter
DimS+ Enter
Q+ Enter
Pe+ Enter
Ins+ Enter
Lead+ Enter
Text+ Enter
Line
Mline
Mline Style
Circle
Rectangle
Trim
Extend
Copy
Mirror
Rotate
Fillet
Chamfer
Block
Explode
Move
Hatch
Match
Stretch
Arc
Array
Erase
DimStyle
Distance
Dimension
DimBase
DimBreak
DimContinue
DimSpace
QDim
PEDIT
Insert
Leader
Text
ENGINEERS UNION
عمل جدول
لعمل طبقات العمل
لعمل حصر البلوكات ولكن مؤقت
عمل تقسم مسافات متساوية األشكال
الهندسية
لإلظهار عالمات التقسم
لالنتقال من لوحة الطباعة الى مساحة العمل
لالنتقال من مساحة العمل الى لوحة الطباعة
مساحة لوحة الطباعة
عمل إخفاء وهمى
يعطى قيمة 0لإلخفاء
للوصول الى االلة الحاسبة
للوصول الى قائمة الخصائص
االجبار على رسم فيX,Y
الرسم على زوايا معلومة
يعطى إشارة عند الوصول الى أماكن معينه
لتفعيل واخفاء الشبكة
Table+ Enter
La+ Enter
Bco+ Enter
Di+ Enter
Table
Layer
Bcount
Divide
Pd+ Enter
DDP+ Enter
MS+ Enter
PS+ Enter
ViewPo+ Enter
Wi+ Enter
Wipeout F+ Enter
QC+ Enter
Pro+ Enter
F8
F10
F3
F7
PDMODE
DDP Type
Model Space
Paper Space
Viewports
Wipeout
Wipeout Frame
Quick Calculation
Properties
Ortho
Polar
Snap
Grind
أشهراإلضافات
عمل حصر لبلوكات المشروع في جدول
تصدير الجدول من االتوكاد الى االكسيل
لحصر االطوال
لكتابة االبعاد اتوماتيك
لرسم الداكت والمسلوب واالكواع
لعملTake off
Count+ Enter
TE+ Enter
LPL+ Enter
Ad+ Enter
Duct+ Enter
BD+ Enter
Count
TE
LPL
AD
Duct
Duct Branch
0
You can add this document to your study collection(s)
Sign in Available only to authorized usersYou can add this document to your saved list
Sign in Available only to authorized users(For complaints, use another form )