18" typ Fixed Pile Moment Diagram 8. See 2" clr typ Pile manufacturer is to provide pile design calculations signed by a registered Professional Engineer. Provide additional mild reinforcing as required to provide required capacity. Spirals shown are a minimum and subject to manufacturer's design. 9. conc column per plan 2'-6" For pile extensions see detail #6 @ 12"cc EW top, typ uno (see note) 8" clr tof see plan Buehler & Buehler Structural Engineers, Inc. 600 Q Street, Suite 200, Sacramento, CA 95811 tel 916.443.0303 fax 916.443.0313 pile cap per plan, see specific pile cap details for size & reinf 1 S1.03 bottom reinf per pilecap details w/ 180° std hook ea end, ea way typ Note: Where top reinf, T, is indicated on plan per Foundation Note #5 on Sheet S100, top reinf size & spacing shall match bottom reinf w/ 180° std hook ea end, ea way typ. dense gravel -40.0' to -45.0' datum for estimating Detail 3 3/8" = 1'-0" S1.03 1" 5'-0" min 5 @ 1"cc see plan #5 @ 12"cc around perimeter of pilecap (8"cc where slab edge occurs) 1 for typical pilecap section. S1.03 piles per W4 @ 3" pitch tie/grade bm reinforcing per sections to terminate @ blockout w/ std hook, typ Plan @ Edge . toc see plan 8. Provide driving follower to protect steel and strand extended from pile typical. remainder Plan conc slab on grade per plan 7. Pile extension detail, if required, to be submitted to and approved by Structural Engineer. 1' - 2" pile cap Ê col conc wall Ties to engage top mat of pile cap reinf. See tie/grade beam sections for tie size and spacing 10. All pile caps shall be poured against undisturbed native soil or engineered fill. 11. No dobies allowed on top of precast concrete piles. 6. Placement of piles shall conform to the soils report and under the continuous observation by a representative of that firm. Final pile depths to be determined in the field by the Geotechnical Engineer. 1' - 2" pile cap see pilecap detail for thickness point of fixity Ê col 3" clr typ uno Typical 14"Ì Piles DL+LL = 200k DL+LL+S = 300k Lateral = 15k Tension = 150k Max moment = +550 in-kips Flexural length = 45'-0" (includes 10 feet for maximum cutoff) 1. All pilecaps to have top curtain of #5 @ 12"cc min each way, 3" clear from top of pilecap, uno. 2. Contractor and job inspector shall notify Structural Engineer of any pile not driven in its proper location as shown on drawings so that corrective measures may be taken if required. Piles driven more than 3" out of proper location shall be replaced with new piles, as reqd, at no cost to owner. 3. Where wall pours across the top or into the side of pilecaps, provide dowels from pilecap with 48 bar diameters embedment at same size and spacing as wall reinforcing. Project dowels 48 bar diameters above pilecap. 4. Bottom mat reinforcing at pilecaps to be 6" clear from bottom of cap w/ 90° standard hooks ea. end. Place longitudinal bars on bottom uno. 5. Concrete pilecap 28 day strength to be F'c= 4000psi. 6. If pile must be cut off, use the following procedures: a) if pile is cut off below point where minimum dowel embedment into sleeves at top of pile can not be achieved, a minimum of 4'-0" of strand shall extend into pilecap. b) if pilecap is cut at point where minimum dowel embed into sleeves at top of pilecap can be made, exposed strands to remain and provide dowels in grouted sleeves as shown in . 7. If pile cut off exceeds maximum cut-off length, pile ductile tie reinforcing must be evaluated and accepted by Structural Engineer or a new pile must be driven. t.o. pile 4. Design load capacities: 35'- 0" 20'-0" +550 in-kips #5 Z-bars @ 8"cc #5 Z-bars @ 12"cc 230SN001-1 1'-6" min M+ 3. Concrete strength: f'c = 4,000 p.s.i. @ transfer f'c = 6,000 p.s.i @ 28 days Typical Pilecap Notes 6" bottom of pilecap . . S1.03 5'-0" 2. Initial tension: 28,900 #/strand Effect: Prestress: 960 p.s.l. . bottom of pilecap 4' - 3" min 5 @ 1"cc Use 1/2"ø ASTM 416-68 gr.270 "lowlax" strands; f' = 268,000 p.s.i. A# 0.153" 5. Pile Design Criteria: Combine axial load & bending: 1) 1.4D 2) 1.2D+1.6L+0.5Lr 3) 1.2D+0.5L+1.6Lr 4) 1.2D+0.5L+1.0E 5) 0.9D-E ductile spiral reinf 120% Flexural Length "length of payment" 1. 2 P.I t.o. pile Pile Notes: 4" 1" 3' - 0" min or 2" clr from t.o. cap max #8 dowel typ @È tip elevation varies typical for estimating only Actual depth to be field determined by geotechnical engineer 14"Ì Prestressed Concrete Pile 1 No Scale S1.03 È col 8' - 6" È col È col È col Detail 5 S1.03 1' - 9" 8' - 6" 1' - 9" 2' - 6" È col 14-#7 bars 1' - 9" 1' - 9" S1.03 14-#7 bars 3'-3" deep S1.03 3'-3" deep 14-#7 bars 7' - 0" 3/8" = 1'-0" 3 Detail 6 3/8" = 1'-0" S1.03 4 Four Pile Cap 7 S1.03 3/8" = 1'-0" 5 Five Pile Cap 8 S1.03 3/8" = 1'-0" R 2 2' - 6" 1' - 9" È col 2' - 4" 1' - 9" pile cap & pile see 1 ED C:\Users\TomKs\Desktop\_REVIT\_REVIT 2012\S09-16700_Campus-Typicals_TKK_R12.rvt Top Reinf Width Depth GB1 1'-6" 1'-6" 2 - #9 2 - #9 #4 @ 12"cc GB2 2'-0" 2'-0" 3 - #11 5 - #11 #5 @ 12"cc 6 - #11 2-#5 @ 12"cc GB3 3'-0" 2'-0" 4 - #11 Bottom Reinf IA added rebar x at interior typ REVISION BY DATE added rebar x at midspan typ Ties Notes: 1. EER Grade Beam Reinforcing Schedule STRUCTURAL TE RN OF CA LI F O THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECT/ENGINEER 100% DESIGN DEVELOPMENT 2 Class A top bar lap @ midspan GIN S1.03 end pilecap L JONES S 9 F E SS I O NA No. 3138 Exp. 12/31/13 TA 1 P RO LAWRENCE E. R E GI S S1.03 1' - 9" 3" clr EN Detail 3/8" = 1'-0" 1' - 9" 1' - 9" 3" clr pile cap & pile see 1 3'- 6" deep 4-#7 top 4-#10 bottom 4 1' - 9" 7' - 0" 2' - 2" 3" clr typ 1' - 9" 1 1' - 9" 1' - 9" 1' - 9" È col 4-#10 3 ways @ 6"cc center over piles 3'- 6" deep 3'-6" thick 1' - 9" 2' - 6" TE 3" clr 1' - 9" #5 bott ea edge 1' - 1" 6' - 9" 1' - 9" 2' - 6" 6-#9 ea way bottom 1' - 9" 1 S1.03 #4 ties @ 6"cc 5' - 0" 2' - 6" pile per 7' - 0" column per plan 1' - 9" 2' - 6" È col 2' - 6" S1.03 1' - 9" 5' - 0" 2' - 8" S1.03 pile cap & pile see 1 3" clr typ È col È col 1' - 9" 1' - 9" 1' - 9" pile cap & pile, see 1 2' - 6" 14-#7 bars 3' - 6" 1' - 9" 7' - 0" Schedule indicates basic reinforcing top and bottom. See beam elevation for added bars as required. 90° std hooks, typ added end rebar GB1 pilecap or grade bm Basic Rebar see schedule GB2 Grade Beam Elevation 2. See beam elevation for lap splice locations. See lap schedule sheet 3. Ties begin 2" from face of intersecting beam or pilecap. Alternate cap ties typical. Detail 10 S1.03 Class A lap splice @ pilecap Note: Transition EW bars over intersecting NS bars A DISCOVERY MUSEUM PROJECT POWERHOUSE SCIENCE CENTER No Scale PILE CAP DETAILS 4/19/2012 10:23:15 AM A9007.03 As indicated 19 APRIL 2012 S1.03 0 4' 6. See 5 for typical pile cap detail. S6.01 Compression Pile Detail 7. All pile caps shall be poured against undisturbed native soil or engineered fill per soils report. 8. No dobies allowed on top of piles. 2'-3" 2' - 6" 2'-3" 2'-3" 8 see plan see pilecap detail for thickness 3" clr typ uno 1'-6" min t.o. pile 8" clr 6" 3" clr typ 6-#11 bottom 2' - 6" , typ 3 or 4 S6.01 S6.01 3" clr typ column col per plan 2'-6" thick One Pile Cap 6 S1.03A 3/8" = 1'-0" 4'-6" thick Two Pile Cap 7 S1.03A 3/8" = 1'-0" 3 S6.01 2'-3" 2'-3" 2' - 6" piles per or , typ 4 S6.01 2'-3" 2' - 6" 2'-3" 9' - 6" È col 3" clr typ Four Pile Cap column per plan 11-#11 bottom 4'-6" thick 9 3/8" = 1'-0" Five Pile Cap 10 S1.03A 3/8" = 1'-0" ED F E SS I O NA L EER JONES No. 3138 Exp. 12/31/13 S TA STRUCTURAL TE RN OF CA LI F O THIS DRAWING IS NOT FINAL OR TO BE USED FOR CONSTRUCTION UNTIL IT IS SIGNED BY THE ARCHITECT/ENGINEER IA 100% DESIGN DEVELOPMENT pile Ø less 2" ± pile Ø less 2"± REVISION center bar center bar 1 BY Revision 1 DATE Date 1 HDPE or PVC pipe, sch. 80 HDPE or PVC pipe, sch. 80 3" clr 2 3/4" 7" A DISCOVERY MUSEUM PROJECT 4-6 straps 4-6 straps galvanized bolt end cap 3" C:\Users\TomKs\Desktop\_REVIT\_REVIT 2012\S09-16700_Campus-Typicals_TKK_R12.rvt P RO LAWRENCE E. R E GI S S1.03A 5 GIN S1.03A 4'-6" thick 4 1 S6.01 3"cc pitch 2' - 6" column per plan 11-#11 bottom 3/8" = 1'-0" pile per 8-#5 1 2' - 6" EN Three Pile Cap 11-#11 bottom 2'-3" 3" clr typ #5 bottom ea side of cap 4'-6" thick drilled hole filled w/ grout per 1'-8" typ at one pile cap 3'-6" typ 6" piles per or , typ 4 S6.01 2' - 6" 2'-3" È column per plan 2'-3" column per plan 6-#11 ea way bottom 9' - 6" 3 S6.01 2' - 6" 3' - 3" 2' - 6" 3" clr typ 2'-3" È col 9' - 6" È col 2' - 6" 2'-8" 5-#11 bottom 3 ways, centered over piles 1'-4" 9' - 0" 3 4 or , typ S6.01 S6.01 2' - 6" 2 shaped cap @ contractor's option 1' - 6" piles per È col Tension piles are indicated on foundation plan sheet S2.11 & S2.12 and designated with a "T" next to the pile cap mark. 2' - 6" 1' - 6" 3 Notes: 2' - 6" piles per or , typ 4 S6.01 2' - 6" 2'-3" center bar centralizer below bottom of cage & at bottom of pile, see , 10 11 - 3 S6.01 9' - 6" S1.03A 9' - 6" 2' - 6" augered pressure grouted pile Tension S1.03A Pile Detail 9' - 6" 2' - 6" 3/8" = 1'-0" S1.03A 5' - 0" 4 3 5 È col 2' - 6" È col È col Typical Pile Cap Detail 2. All piles to be installed to specified length (minimum) or to practical refusal as determined by the Geotechnical Engineer in the field. 3. All piles to be installed to specified length (minimum) or to practical refusal as determined by the Geotechnical Engineer in the field. bottom reinf per pilecap details w/ 180° std hook ea end, ea way typ R 4. Bottom mat reinforcing at pile caps to be 8" clear from bottom of cap w/ 180° standard hooks ea. end. Place longitudinal bars on bottom uno. 5. Minimum compressive strength of pile cap concrete is to be f'c = 5000 psi @ 28 days. See specs for type G concrete. 1 S6.01 TE 2. pile cap per plan, see specific pile cap details for size & reinf È col Pile Elevation 1. Contractor shall submit pile design/build drawings for review and approval All piles are compression piles unless designated as tension piles on plan per 4 S6.01 600 Q Street, Suite 200, Sacramento, CA 95811 tel 916.443.0303 fax 916.443.0313 2' - 6" 1. Buehler & Buehler Structural Engineers, Inc. 5' - 0" Notes: piles per dense gravel layer -40.0' to 45.0' datum tof see plan 11-#11 bottom 3. Where wall pours across the top or into the side of pile caps, provide dowels from pile cap same size and spacing as wall reinforcing. Embed wall dowels to bottom layer of pile cap reinforcing per 3 Dowel projection into wall above per specific sections at each condition. S6.02 spiral #18 grade 75 center bar center bar centralizer below bottom of cage & at bottom of pile, see , 10 11 - Pile Elevation A longitudinal bar typ ASTM A706 #6 @ 12"cc EW top, typ uno 2' - 6" augered pressure grouted pile #5 @ 12"cc around perimeter of pilecap (8"cc where slab edge occurs) toc see plan È col 3" clr 1. All pile caps to have top curtain of #6 @ 12"cc min EW, 3" clear from top of pilecap, typ. uno. 2. Contractor and job inspector shall notify Structural Engineer of any pile not installed in its proper location as shown on drawings, so that corrective measures may be taken if required. Piles not installed within tolerances per specifications, shall be corrected, as required, at no cost to owner. 2'-6" blockout 7 S1.02 conc slab on grade per plan 2' - 6" #9 grade 60 center bar Plan @ Edge . column per plan 2' - 5" Typical Pile Cap Notes S1.03A A 35ft. min, bottom of spiral reinf. cage (coordinate w/ Geotechnical Engineer & pile contractor) Plan 3" clr typ provide a minimum of 3 spacers, distributed radially @ 10'cc max along length of cage see 12 - 5'- 0" min embedment longitudinal bar typ ASTM A706 dense gravel layer -40.0' to 45.0' datum minimum of 2 tight turns at top ± 20'-0"cc spiral conc wall round HRC 555 T-head terminator at top of bars, typ (by Headed Reinforcement Corporation, ICC-ESR 2935) see abv for condition @ anchor É where occurs bottom of pile cap ±10'-0" max 35ft. min, bottom of spiral reinf. cage (coordinate w/ Geotechnical Engineer & pile contractor) A extend vertical reinforcing cont. out of auger cast pile pile cap Ê col pile cap top of pile cap b.o. T-head 3" clr A 1 S6.01 3" clr typ provide a minimum of 3 spacers, distributed radially @ 10'cc max along length of cage see 12 - drilled hole filled w/ grout per Provide testing on piles per the requirements of the specifications and 2010 CBC Section 1808.3.3. Additionally, pile load testing shall conform to the recommendations of the solis report. Submit a test pile plan showing the location of the test piles for approval prior to the commencement of testing. The test program shall represent all loading conditions on the site. Per 2010 CBC Section 1810.3.3.1.2, at least one pile shall be tested in each area of uniform subsoil conditions as determined by the geotechnical engineer. The construction of production pile/foundations will not be allowed until the tests for pile capacities have been completed and the test results have been accepted by Geotechnical & Structural Engineers. round HRC 555 T-head terminator at top of bars, typ (by Headed Reinforcement Corporation, ICC-ESR-2935) 3"cc pitch 6. extend vertical reinforcing cont. out of auger cast pile minimum of 2 tight turns at top length per Geotechnical Engineer 1'-8" typ at one pile cap 3'-6" typ 6" Pile design and installation shall conform to the project soils report: #59633-06-1 by Geocon Consultants Inc. dated September 9, 2011 with continuous observation by a representative of that firm. Pile design calculations, signed by a licensed structural engineer in the State of California, shall be submitted for review prior to contruction of piles. b.o. T-head bottom of pile cap point of fixity Pinned Pile Moment Diagram 5. Condition @ Anchor É top of pile cap Ê col Note: Center bar to be cut off to match T-head location at Contractor's option. Bar permitted to be cut off at top of pile. Section A-A ± 20'-0"cc Combine axial load & bending in design of pile. Design shall be performed in accordance w/ 2010 CBC, Section 1810. 2 bottom of pilecap Flexural Length Pile Design Criteria: Governing Load Combinations a) D+L (allowable) b) 1.29D + 0.5L + ΩE (ultimate) c) 0.81D - ΩE @ tension piles (ultimate) M 8-#8 verts ASTM A706 Section A-A length per Geotechnical Engineer 4. Design load capacities for 16"Ø piles: DL + LL = 200 kips allowable (1.0D + 1.0L) DL + LL + seismic = 550 kips ultimate (1.29D + 0.5L + ΩE) uplift = 300 kips ultimate (0.9D - ΩE) flexural length = 10 ft location of M = 4 ft Note: Piles not relied upon for lateral load reistance. Pile reinforcing shown on sheet is adequate to resist 1/4" deflection at pile head. anchor É where occurs #5 Z-bars @ 8"cc #5 Z-bars @ 12"cc #3 spirals ASTM A706 t.o. pilecap r cl 3" 3. Pile grout requirements: f'c = 4500 psi minimum compressive strength @ 28 days Fly ash content: 25-30% maximum cement replacement See also spec section 31 63 16 6-#8 verts ASTM A706 r cl 3" 2. Designs herein are based on the use of 18" diameter augered pressure grouted piles. The pile length is expected to be as noted in details & . 3 4 Actual depth of piles is subject to field recommendations by the Geotechnical Engineer. S6.01 S6.01 P.I. 1. #9 grade 60 center reinf. bar continuous full height of pile w/ Lenton thrd coupler as required (by ERICO, ICC-ER 3967). Coordinate length w/ Geotechnical Engineer and pile contractor. Coupler to develop 125% of rebar yield stress ASTM A615, grade 75, #18 center reinf. bar continuous full height ofpile w/ Lenton thrd coupler as required (by ERICO, ICC-ER 3967). Coordinate length w/ Geotechnical Engineer and pile contractor. Coupler to develop 125% of rebar yield stress 5' - 0" #3 spirals ASTM A706 1'- 4"Ø È col Typical Augered Pressure Grouted Pile (APG) Notes S1.03A ±10'-0" max 1 column base anchor bolts #8 verts w/ T-head at top @ pile, typ 12" min Lenton thrd coupler as req'd, coupler to develop 125% of rebar yield stress 1'- 4"Ø Upper Centralizer Detail 11 S1.03A Lower Centralizer 1 1/2" = 1'-0" Detail 12 S1.03A POWERHOUSE SCIENCE CENTER 2" 3" Cover Clip Spacers- HDPE Plastic 1 1/2" = 1'-0" Detail 13 S1.03A 1 1/2" = 1'-0" ALTERNATE APG PILE & PILE CAP DETAILS 4/19/2012 10:23:16 AM A9007.03 As indicated 19 APRIL 2012 S1.03A